| 1 | \"SCHEDULE `A\" PART -I15 KVA Genr Set (Engine Ser No. 02.2145/1422326) at Bn HQ, 36 AR\"\"Material, labour and servicing of 15 KVA Gen set (Engine Ser No. 02.2145/1422326) including draining out of diesel, draining out of engine oil from the sump ,flushing the sump and cleaning,including checking of all parts, cleaning Air filter, opening oil and fuel filter, replacing of defective items checking the performance of engine (Voltage, Frequency, RPM and Temperature) setting all the parameter and testing including replacing all worn out parts i:e (a)Pistion ring std X 02 Nos , (b) Engine head valve grinder set X 02 Nos (c) Push rod tube rubber ring kit X 01 Nos (d) Engine gasket kit X 01 Nos (e) Fly wheel side oil seal X 01 Nos (f) Engine timing gear side oil seal X 01 Nos (g) Fuel filter 1/2 ltr P/S set X 01Nos (h) Mobile filter element X 01Nos (j) C R bearing set X 01 Nos (k) Fuel pipe X 02 Nos(I) Main bearing set X 01Nos (m) Nozzel X 02 Nos (n) FIP repair X 01 Nos (o) Engine cooling fan belt X 01 Nos (p) Engine mounting pad X 04 Nos (q) Engine Full ServicingX 1 Job & reassembling all the nuts and bolts to be required torque and testing complete all as directed by Engineer - in -Charge. |
| 2 | \"SCHEDULE `A\" PART -II:-15 KVA Genr Set (Engine Ser No. 02.2129/1320101) at Bn HQ, 36 AR.\"\"Material, labour and servicing of 15 KVA Gen set (Engine Ser No. 02.2129/1320101) including draining out of diesel, draining out of engine oil from the sump ,flushing the sump and cleaning,including checking of all parts, cleaning Air filter, opening oil and fuel filter, replacing of defective items checking the performance of engine (Voltage, Frequency, RPM and Temperature) setting all the parameter and testing including replacing all worn out parts i:e (a)Pistion ring std X 02 Nos , (b) Engine head valve grinder set X 02 Nos (c) Push rod tube rubber ring kit X 01 Nos (d) Engine gasket kit X 01 Nos (e) Fly wheel side oil seal X 01 Nos (f) Engine timing gear side oil seal X 01 Nos (g) Fuel filter 1/2 ltr P/S set X 01Nos (h) Mobile filter element X 01Nos (j) C R bearing set X 01 Nos (k) Engine mounting pad X 04 Nos(I) Main bearing set X 01Nos (m) Nozzel X 02 Nos (n) FIP repair X 01 Nos (o) Engine cooling fan belt X 01 Nos (p) Engine Full ServicingX 1 Job & reassembling all the nuts and bolts to be required torque and testing complete all as directed by Engineer - in -Charge. |
| 3 | \"SCHEDULE `A\" PART -III:-30 KVA Genr Set Engine Ser No. 03.8805/1920058 at Bn HQ, 36 AR\"\" . Material, labour and servicing of 30 KVA Gen set (Engine Ser No. 03.8805/1920058) including draining out of diesel, draining out of engine oil from the sump ,flushing the sump and cleaning,including checking of all parts, cleaning Air filter, opening oil and fuel filter, replacing of defective items checking the performance of engine (Voltage, Frequency, RPM and Temperature) setting all the parameter and testing including replacing all worn out parts i:e(a)PistonRingset(std)X04 Nos (b)Engine head GasketX 01 No(c)Engine Gasket Set X 01 No(d) Mobil Filter spin type X 01 No(e)Fuel DieselFilter P/S SetX 01 No(f) Engine Fly Wheel Side Oil seal X 01No(g)Engine MainBearing set X 01 No (h) C R Bearingstdset X01 No (j) Crank Shift lathe Grinder X 01 Job(k)Engine Valve Oil Seal X 08 Job(l)Fuel Pipe and nut bolt extra X 01 Job (m)Engine Coolant X05Ltr (n)Mobil spray Nozzle X 04 Nos (o) Radiator Cleaning X 01 Nos (p)Cylinder Head RepairX01 Nos (q)F.I.P repair X 01 Job(r) EngineOil X12Ltr(s)AirFilter ElementX01No(t) Dynamorepair X 01Job(u)PistonCooler Nozzle X 04 Nos (v) AVR x 01 Nos Engine full servicingcharge -01 Nos reassembling all the nuts and bolts to be required torque and testing complete all as directed by Engineer - in -Charge. |
| 4 | \"SCHEDULE `A\" PART -IV:-30 KVA Genr Set Engine Ser No. V4D9C7581 at Bn HQ, 36 AR\"\"Material, labour and servicing of 30 KVA Gen set (Engine Ser No. V4D9C7581) including draining out of diesel, draining out of engine oil from the sump ,flushing the sump and cleaning,including checking of all parts, cleaning Air filter, opening oil and fuel filter, replacing of defective items checking the performance of engine (Voltage, Frequency, RPM and Temperature) setting all the parameter and testing including replacing all worn out parts i:e(a)PistonRingset(std)X04 Nos (b)Engine head GasketX 01 No(c)Engine Gasket Set X 01 No(d) Mobil Filter spin type X 01 No(e)Fuel DieselFilter P/S SetX 01 No(f) Engine Fly Wheel Side Oil seal X 01No(g)Engine MainBearing set X 01 No (h) C R Bearingstdset X01 No (j) Crank Shift lathe Grinder X 01 Job(k)Engine Valve Oil Seal X 08 Job(l)Fuel Pipe and nut bolt extra X 01 Job (m)Engine Coolant X05Ltr (n)Mobil spray Nozzle X 04 Nos (o) Radiator Cleaning X 01 Nos (p)AVRX01 Nos (q)F.I.P repair X 01 Job(r) EngineOil X12Ltr(s)AirFilter ElementX01No(t) Dynamorepair X 01Job(u)PistonCooler Nozzle X 04 Nos (v)Engine full servicingcharge -01 Nos reassembling all the nuts and bolts to be required torque and testing complete all as directed by Engineer - in -Charge |
| 5 | \"SCHEDULE `A\" PART -V RO water filter of capacity 1000L at Bn HQ Veng, 36 Assam Rifles \"\"M & L for dismantling of existing 1000 LPH IRP including removal of existing old filter media of various sizes, unserviceable strainers etc and deposited to place where directed complete :- (a) Supply and filling Barakar sand of 16/32, 10/20mm size and Gravel of size 1\", 3/4\", 1/2\", 3/8\", 1/4\", 1/8\". (b)Petty Repair of MS vessels (c) Supply and fixing rubber gasket joints for all packing required places of IRP unit including nut-bolts (d) Supply and replacement of plastic damaged strainers (push Type) of approved quality and size wherever required (e) Replacement of existing MNO2 / Anthracite from oxidation chamber with new MNO2 or Anthracite lumps to be used as oxidizing agent (f) Supply and fix water pressure gauge duly calibrated of existing size complete (g) Supply and Installation of Electronic Dosing Pump (6 LPH) with 50Ltr Tank (h) Air Compressor with allied accessories (j) Repair or Replacement of Diaphragm Valves - 5 Nos. |
| 6 | \"SCHEDULE `A\" PART -VIIron Removal plant at Bn HQ Veng \"\" M & L for dismantling of existing 1000 LPH IRP including removal of existing old filter media of various sizes, unserviceable strainers etc and deposited to place where directed complete :- (a) Supply and filling Barakar sand of 16/32, 10/20mm size and Gravel of size 1\", 3/4\", 1/2\", 3/8\", 1/4\", 1/8\". (b)Petty Repair of MS vessels (c) Supply and fixing rubber gasket joints for all packing required places of IRP unit including nut-bolts (d) Supply and replacement of plastic damaged strainers (push Type) of approved quality and size wherever required (e) Replacement of existing MNO2 / Anthracite from oxidation chamber with new MNO2 or Anthracite lumps to be used as oxidizing agent (f) Supply and fix water pressure gauge duly calibrated of existing size complete (g) Supply and Installation of Electronic Dosing Pump (6 LPH) with 50Ltr Tank (h) Air Compressor with allied accessories (j) Repair or Replacement of Diaphragm Valves - 5 Nos. |
| 7 | \"SCHEDULE `A\" PART -VII Iron Removal plant at COB T Khongkhai, 36 AR \"\" M & L for dismantling of existing IRP including removal of existing old filter media of various sizes, unserviceable strainers etc and deposited to place where directed complete :- (a) Supply and filling Barakar sand of 16/32, 10/20mm size and Gravel of size 1\", 3/4\", 1/2\", 3/8\", 1/4\", 1/8\" (b)Petty Repair of MS vessels (c) Supply and fixing rubber gasket joints for all packing required places of IRP unit including nut-bolts (d) Supply and replacement of plastic damaged strainers (push Type) of approved quality and size wherever required (e) Replacement of existing MNO2 / Anthracite from oxidation chamber with new MNO2 or Anthracite lumps to be used as oxidizing agent (f) Supply and fix water pressure gauge duly calibrated of existing size complete (g) Supply and Installation of Electronic Dosing Pump (6 LPH) with 50Ltr Tank (h) Air Compressor with allied accessories (j) Repair or Replacement of Diaphragm Valves -5 Nos |
| 8 | \"SCHEDULE `A\" PART -VIII 250 KVA Transformer at Bn HQ Veng of 36 Assam Rifles \"\" Repair/ Maint of 250 KVA Transformer at Bn HQ Veng of 36 Assam Rifles including (a) Dismantling and taking out the existing UNSV Gang opertaing Switch both male and female devices from existing two pole structure as per direction ofEngr-in-Charge x 01 Job (b) Supply and fix HT 11 KV, out door type gang operated air-break switch suitable for horizontal or vertical mounting fixed type complete with 9 insulators of rating upto 630 Amps as per site requirement andas per direction ofEngr-in-Charge. (c) Supply and fix HT 11 KV, out door type gang operated air-break switch suitable for horizontal or vertical mounting fixed type complete with 9 insulators of rating upto 630 Amps as per site requirement andas per direction ofEngr-in-Charge x 01 Job. (c) Dismantling and taking out the UG Cable from connection for Transformer LV side to Fuse unit and fuse unit to panel board upto 400 Sqmm size necessary connected works will be done as per site requirement direction of Engr-in-Charge x 50 mtr (d) Supply and fixing UG Cable from connection for Transformer LV side to Fuse unit and fuse unit to panel board upto 400 Sqmm size necessary connected works will be done as per site requirement direction of Engr-in-Charge x 50 mtr . (e) Supply and fix Cut out with rewearable fuse link of complete of 500 Amps including taking down old unserviceable items from the circuit including necessary connection and testing all a specified and directed by Engr-in- Charge x 15 Nos (f) Supply and fix cable lugs copper of size 240 Sqmm including necessary connections of cable both end complete all as per direction of Engr-In-Charge x 16 Nos (g)Supply and fix cable lugs aluminum of size 125 Sqmm including necessary connections of cable both end complete all as per direction of Engr-In-Charge x 16 Nos (h) Cleaning with scrapers, preparing the old synthetic enamel paint surfaces of the 250 KVA transformer and applying one coat of synthetic paint on the surface of the 250KVA transformer x 01 Job (j) Free for filling topping up after dehydration and filtration of 250 KVA transformer (Oil will be supplied by the dept free for filing) x 40 ltr (k) Dismantling of 250 KVA transformer from site including transport to workshop and back and rewinding of old and defective HV & LV coils with super enameled copper wire as per orginal spec. |