| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 2 | Providing concrete for plain/reinforced concrete in open foundations (PCC M-10) complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 3 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in foundation complete as per drawings and technical specifications Clauses 1000 and 1202. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 4 | Plain/reinforced cement concrete in substructure (RCC Grade M-20) complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 5 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 6 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 7 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 8 | Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specification Clause 1205.5.7 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 9 | Providing and laying reinforced cement concrete in superstructure (RCC M-25) as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 10 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Sr No. 4.1 Ref No. 401. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 11 | Providing, laying, spreading and compacting stone aggregates of 45-63 mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 12 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 13 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 Sr No. 5.1 Ref No. 502. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 14 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Sr No. 5.2 Ref No. 503. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 15 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Sr no. 5.9 Ref No. 508. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 16 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 .Sr no. 5.12 Ref No. 510. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 17 | Supply and fixing of 1000 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 18 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 19 | Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 20 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. Please Enable Macros to View BoQ information |