|
| 1 | Hughes dry dock Services |
| 2 | Hughes dry dock Services (Including 04 days preparatory period) |
| 3 | Yard Services at Hughes Dry Dock |
| 4 | Dock cleaning charges (within 24 hours of docking charges) (1 time after docking of Ship) |
| 5 | Supply & Laying of suitable Dock Blocks both centre line and side blocks as per drawings during docking of the ship |
| 6 | Supply & laying of suitable wood packing (soft & hardwood) for Dock Block as per drawings during docking of the ship. |
| 7 | Supply & Positioning of Wooden Bottom Shoring as per drawings during docking |
| 8 | Assisting for docking and undocking excluding tug and pilotage |
| 9 | Mooring and line handling excluding tug and pilotage |
| 10 | Unmooring and line handling excluding tug and pilotage |
| 11 | Fire line pressurized line per day |
| 12 | Connection and disconnection of pressurized fire four lines |
| 13 | Sea water supply to ballast tanks |
| 14 | Connection and disconnection of Sea Water supply one line |
| 15 | Power supply (50hz & 3phase-110V, 230V,380V & 410Vfor 40 days)during docking period(Note: Billing will be as per actual consumption of Power.) |
| 16 | Connection and disconnection of Power supply one line |
| 17 | Fresh Water Supply per MT |
| 18 | Connection and disconnection of Fresh Water supply one line |
| 19 | Provision of Gangways |
| 20 | Fire/Security watch per day (To provide 24Hrs fire security watch by deploying minimum 5 fireman’s) |
| 21 | Yard Crane (with operator) –up to 20T capacity (Payments will as be per actual usage)40x8hrs |
| 22 | Yard Crane (with operator)–above 20T 115T capacity (Payments will as be per actual usage) |
| 23 | Yard Crane (with operator)–above 150T capacity (Payments will as be made at actual usage) |
| 24 | Yard Crane (with operator)–off 250T capacity (Payments will be as per actual usage) |
| 25 | Yard Fork lift (with operator) (5 Ton) in Dry dock- Qty -02 No.(Payments will be as per actual usage) |
| 26 | Cherry Picker (with operator) qtty 3 nos hire charges (Working hight 120 Ft) (Payments will be made at actual) |
| 27 | Hydra With operator (12 Ton Capacity) (Payments will be as per actual usage) |
| 28 | One Chiller Plant (200 TR) with flexible pipesIDLE charges - 1No |
| 29 | One Chiller Plant (200 TR) with flexible pipes RUNNING charges (Payments will be as per actual usage) 1 No |
| 30 | Scaffolding along with material (Payments will be made at actual) |
| 31 | Cleaning of Hughes Dry Dock as and when required. Note: Estimated cleaning considered as 04 nos during dry dock however billing as per actual consumption. |
| 32 | To provide Containers suitable for Office Work for onsite MDL Executives nearby to Hughes dry dock - 05 nos. |
| 33 | To provide Containers suitable for Material Storage nearby to Hughes dry dock - 03 nos. |
| 34 | Dedicated Toilet & Urinal arrangement nearby (in hygiene condition with cleaning on daily basis) nearby to Hughes dry dock suitable for approx 700 personnel per day |
| 35 | Removal of Galley Refuse (up to 100 kg per time) |
| 36 | Removal of Other Garbage (Including Copper Slag) |