| 1 | BROAD SCOPE: The scope for complete Dry Bottom Ash handling system (Bottom Ash and ECO Ash) shall include complete design, engineering, manufacture/supply, shop fabrication, assembly, testing & inspection at manufacturer’s works, maintenance tools & tackles, mandatory spares, spares for erection, start-up and commissioning as required, fill of lubricants & consumables, packing, despatch, transportation, delivery to site, unloading, intra site handling & storage at site, construction of Stores at site (Open & Closed), round the clock security at open storage yard , closed storage shed & erected material till completion of work, construction, erection, its supervision,Statutory requirement (If any), testing ,inspection, commissioning and handing over to Owner and Guarantee testing, including all associated Mechanical, Electrical and C&I, all auxiliary systems, Structural Steel Works, Electrical, Control & Instrumentation Works as specified in tender specification, amendments & agreements till placement of order & as necessary for completeness in all respects and for efficient & trouble free operation for 2X800 MW KODERMA THERMAL POWER PROJECT STAGE-II (As per Tender Specification) |