| 1 | Road WorkClearing and grubbing road land including uprooting wild vegetations, grass, bushes, shurbs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used etc. complete including cost. , conveyance, royalty, Cess & taxes of all materials & cost of all labour & T&P required for the work etc complete as per specification & direction of Engineer-in Charge. |
| 2 | Providing & laying 75mm compacted thickness of WBM specification with following size of IRC graded metal of approved quality from approved quarry and spreading on the road surface uniformly metal to specified thickness and hand packing the voids with small stones to proper camber and grade conveying moorum from stacks stacked at work site or at approved stacking yard including labour charges of moorum spreading over the metal surface filling the interstices of metal and consolidation with three wheeled steel Roller 8 to 10 tonnes in stage of proper grade & camber & turfedging including hire and running charges of Roller and all other machineries including all labour, T&P and cost, conveyance royalty & of all materials required for the work with Cess etc complete in all respect as per specification and direction of the Engineer-in-charge. |
| 3 | Providing & laying for surface dressing with 12Kg. Penetration grade of bitumen and 0.15 cum of 19mm nominal size chips per 10 sm and rolling with PRR including hire and running charges of PRR and including cost and conveyance, Royality, DMF (10% over Royality), EMF (5% over Royality), Addl Charges of chips etc complete in all respect as per technical specification & as per direction of Engineer-in-Charge. |
| 4 | Providing & applying tack coat with Bitumen Emulsion (RS-1) using emulsion distributor @ 2 Kg per 10 Sqm on the bituminous surface and cleaned with mechnial broom as per technical specification Clause 503 of MoRD & as per direction of Engineer-in-Charge. |
| 5 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of speficied grading premixed with bituminous binder of 60/70 penetration grade of bitumen , transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for Road & Bridge works and all other T&P articles including cost, conveyance, royality, DMF (10% over Royality), EMF (5% over Royality), Addl Charges, Cess, taxes of chips and bitumen & other required materials etc. complete as per specification and direction of the Engineer in charge. |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H specifications for Road and Bridge works (4th Revision) with cost of all labour, T&P and with cess, royality and as per direction of Engineer-in-charge. |
| 7 | Providing and fixing of semi reflective cautionary, place identification, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing as per Clause 1701.2.2 of MoRD and as per direction of Engineer-In-charge.600 mm equilateral Triangle Sign Board. |
| 8 | Supplying and installing of measurement stones including painting, lettering in accordance with the specifications and as approved by the engineer and as per direction of Engineer-In-Charge and as per clause 1703 of MoRD.KM Stone |
| 9 | 200 mtr Stone |
| 10 | Providing and fixing 15 cm dia and 1 m long guard post of RCC (1:2:4) including cost, conveyance royality, Cess, taxes of all materials, labour, T&P required for the work etc. complete as per specification and direction of the Engineer in charge. |
| 11 | Berm ConcreteEarth work in excavation in foundation in hard soil including hard moorum, stony earth mixed with boulders (except sheet rock & boulders requiring blasting) with all leads & lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads & lifts including cost of all labour, Cess & T&P and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge |
| 12 | Providing & filling good clean river sand of approved quality including watering to complete saturation & ramming complete including cost conveyance, royalty, DMF (10% over royalty), EMF (5% over royalty) & Addl. Charges, Cess & taxes of all materials & cost of all labour required for the work etc complete as per specification & direction of Engineer-in Charge. |
| 13 | Providing and laying plain cement concrete of M-15 of controlled qualityhaving a minimum compressive strength (in work test) of 150Kg/Cm2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using hard crusher broken granite materials of 40mm size and down graded consistence with strengthof approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete, watering and curing for 4 weeks, centering shuttering & finishing the exposed surface smooth with cost conveyance royality, DMF (10% over Royality), EMF (5% over Royality), Addl Charges labour with T&P & Cess etc required for the work. complete in all respect as per the specification and direction of Engineer-in- charge. Please Enable Macros to View BoQ information |