| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 10 km as per Technical Specification Clause 301.5(Earth work with 10.000 km Lead) |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet).S.I-692 |
| 3 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 4 | Cement Concrete with 40 mm gauge Brick Ballast, f.s.and cement in proportion 10:5:1, DSR 4.2.8.A (DSR Factor 6912.45x0.757x108/107 = 5281.62 |
| 5 | Brick masonry work in 1:4 cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 |
| 6 | Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 7 | PCC 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 4.1.3A (DSR Factor 7654.85x0.757x108/107 = 5848.87 |
| 8 | Providing and laying reinforced cement concrete in open foundation as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (R.C.C. Grade)For nominal mix 1:1.5:3 |
| 9 | Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 10 | Construction of un-reinforced, and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 |
| 11 | Diversion of water with help of pump set |
| 12 | S/F of sign board complete item |
| 13 | Total |
| 14 | GST Please Enable Macros to View BoQ information |