| 1 | Earth work in excavation of the foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading or stacking the spoils within a lead of 75Mtr as directed. The Item including necessary trimming the sides of tranches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete. Depth of excavation not exceeding 1500 mm. |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With earth obtained from excavation of foundation. |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directedwithin a lead of 75 m.a) In ground floor including roof. |
| 4 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site andremoving rubbish as directed within a lead of 75m.In ground floor including roof. (a) upto 150 mm. thick |
| 5 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directedwithin a lead of 75 m. including stacking of steel bars (a) In ground floor including roof |
| 6 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m stacking serviceable and unserviceable materials separately as per technical specification Cl 202 for Rural Roads of MORD (i) by mechanical means (b) Granular Courses |
| 7 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 8 | Supplying ready mixed concrete of M 15 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc.inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item.[cement to be supplied by the Manufacturer/ supplier]In ground floor and foundation. Withoutapproved concrete pump. |
| 9 | Supplying ready mixed concrete of M 30 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc.inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item.[cement to be supplied by the Manufacturer/ supplier]In ground floor and foundation. Withoutapproved concrete pump. |
| 10 | Supplying and laying in the specified pattern of Interlocking concrete block pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658:2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (As per clause no 6.30 of IRC : Sp: 63 (2018) , from BIS license manufacturer , with spacer nib (small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving block as per Cl No 3.26 of IS : 15658) and of specified size and shape with aspect ratio (the ratio of length to thickness of a paver block as per CL No 3.3 of IS : 15658) as per Table 2 of IS15658 with flexural strength / breaking load as per Annexure G of IS15658 on prepared base course of specified CBR as per table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a couson of compacted bedding sand of 25-35mm thick (Grading of bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver block with joint filling sand (the grading of joint filling sand will be as per clause 6.5.2 of IRC SP-63) and completing the edges with cut blocks as per clause no. 8.7 of IRC SP-63 (2018) with proper confinement of bedding and joint filling sand, compaction, leveling and filling up of the edge gap.120 mm thick GreyDentated or dumble shaped |
| 11 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints withlocal sand. |
| 12 | Brick work with 1st class bricks in cement mortar (1:6) |
| 13 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/stagingwhere necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:6 cement mortar.15 mm thick plaster |
| 14 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. |
| 15 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.TATA/SAIL/RINL. |
| 16 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work |
| 17 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 18 | Supply earth mover/ exacavator cum loader including fuel, permit, requisite operator, helper etc for 8 hrs. The rate is inclusive of all expenses complete. |
| 19 | Fixing S.H 90 lbs rail 1.50 min length after cutting, carrying (Within 5 km) and fixing in line and level as per the direction of Engineer-in-charge.(The rate is inclusive of the cost of carrying, loading, unloading, cutting the rails and fixing the same but excluding the cost of excavating foundation , concreting and painting.) Rail will be supply by KoPT. |
| 20 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in-charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. I) For structural members of specified sections weighing less than 22.5 Kg./m |
| 21 | M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approvedmake and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete.The rates are considered for height of erection 8m. /2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof.ii) For other Structural works like galleries etc. |
| 22 | Supplying, fitting and fixing retro-reflective warning & regulatory sign with imported reflective sticker of approved quality for lettering direction, arrow,symbol etc. pasted on 14 S.W.C plain galvanised steel of TATA make having clean cut edge & radiuses at all corners painting two coats of synthetic enamel paint over a coat of priming on both sides of the G.I sheet by spray painting with necessary bolting etc. The rate includes cost of reflective sign sticker, G.I sheet, fitting fixing , hoisting & placing in position on steel frame work with necessary tack welding in bolting complete as per approved drawing etc. & direction of Engineer-in-charge but excluding the cost of steel frame.a) Retro reflective sign on one side. |
| 23 | Labour for taking out (from fencing) line of wire (galvanised, strand or barbed) including the cost of taking out staples (by cutting or otherwise, as necessary). |
| 24 | Dismantling steel works in all types of sections upto a height of 5m above plinth level excluding cutting of rivet as per technical specifications alause 202 for rural roads of MORD, including dismembering |
| 25 | Loading, unloading and stacking by manual means. Loading in to trucks at the lifting point, unloading at destination, stacking properly in godown or yard etc. as directedincluding carriage by head load up to a lead of 50,m at each of the two points. Steel |
| 26 | Carriage of Steel materials over pucca road, Upto 5km |
| 27 | Dismantling of barbed wire fencing / wire meshfencing including posts, foundation concrete,backfilling of pit by manual means including disposalof dismantled material with all lifts and upto a lead of1000 m, stacking serviceable material andunserviceable material separately as per TechnicalSpecification Clause 202 for Rural Roads of MORD |
| 28 | Cutting/ Cleaning/ removing jungles, including uprooting/ removing of rank vegetation, cutting grass, bush wood cutting/ removing small tree saplings orbranches of trees failing under the cutting area at different area of dock and removing spoil upto a distance of 50 m outside the periphery of the area cleared as per direction including all lead, lifts cutting. instrument, labour etc. complete in all respect. |
| 29 | Priming one coaton steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.(This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) |
| 30 | Provide and paint with best quality synthetic enamale paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface if necessary. On timber plastered, steel or other metal surface with high gloss of approved quality.Two coats (with any shade except white) on steel surface.Withhi-gloss of approved quality |
| 31 | Hire Charges and running cost of crane(Hydra) upto 14 tonne capacity including cost of services of operating staff , cost of lubrication, Disel/Petrol on per day basis for 8 working hours within kolkata city & petroleum wharves, Budge Budge area all complete (the rate is inclusive of all exclusive GST) |
| 32 | Supplying lobours for taking out old paver blocks carefully, stacking the same in proper stack anddepositing the spoils as directed within a lead of 150m |
| 33 | Carefully lay old paver blocks in line and level to match with existing paved surface including providing bedding layer with minimum sand (50 to 80mm avg. thk.) over hard and compacted base & completed by7 heavy duty vibrator plate compaction(joints filled with fine sand) as per specification including all lead, lifts, materials, labours etc. complete in all respect. |
| 34 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.a) Pakur Variety(a) In Ground Floor including roof. |
| 35 | Providing and fixing exterior quality Aluminium Composite Panel (ACP) wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, cleats and strainless Steel screws forming groves at the periphery of ACP panel. Such grooves filled with foam and silicon sealant etc. complete with all materials (but including the cost of silicon sealant), labour, scaffolding and all other incidental charges complete in all respect as per specification and direction of Engineer-in-charge. (Mode of payment is on finished surface area of ACP) )- 3mm thick (0.25mm Al.+2.5mm LDPE +0.25mm Al. PVDF coating). |