| 1 | Manning and operation of DG Set 160 kVA - 01No),HT Panel 1250 Apms-02 Nos, 800 Amps-02 Nos, Transformer -250 KVA-02 Nos& Connected LT/Feeder pillar box Panels at UC-1 Substationbuilding Rambilli premises by one Skilled Electrician includingminor repair work to be carried out inDG sets,VCB & Transformer by technician for eight hours shift ( DG Sets to be operate during the uninterrupted power supply as per standred norms)Note:- No of Person required- 01 person (01Electrician ) 3 shift per day Ist shift (0600 Hrs to 1400 Hrs) = 01 ElectIInd shift(1400 Hrs to 2200 Hrs) = 01 ElectIIIrd shift(2200 Hrs to 0600 Hrs) = 01 Elect |
| 2 | Note for Sl No.1.0 to 8.0 :- The rate shall be quoted above deemed to be inclusive of the following:- (i) Visual Checking(a) All equipments/items to be visually checked by the operator and serviceability report to be filled in log sheet. Any fault or unserviceable of equipments to be informed to JE E/M otherwise EIC.(ii) Monitoring of Equipments.(a) Daily log sheet shall be maintained by the contractor & the log sheet shall be provided by the contractor as per Performa given by the department be inspected thoroughly before switching on.(b) Maintaining duty log sheet and checking all parameter of metering devices.(c) Checking of various meters for measurement of current, voltage etc, including recording of these readings in log sheet and also recording of any unwanted signal of spark, sound in switchgears/equipments etc. (d) Switchgear and equipments shall be properly cleaned. (e) Dress shall be provided for every shift operator (dress colour to be approve prior approval of Engr-in-Charge. (f) One mobile phone with sim to be provided at site for commnication and fault rectification. |
| 3 | (g) Minor complaints to be attend by the techanician given by the concerned Contractor.(h) Conveyance facility to be provided by the contractor in station premises for operation of valves at different locations.(j) Necessary tools/Shoes/Raincoat required for operation of valves & Pumpset shall be provided the concerned contractor to FGM and helper. (k) Helper in additional to pump-house,shall assist elctrician of substation in operation & upkeep UCs.Note:-It is mandatory that provision of statutory laws relating to minimum Wages as per GOIChief labour commissioner (C)New Delhi latest letter , EPF@ 12% of labour rate, Bonus @ 8.33 % , ESIC @ 3.25 % , GST @ 18% taxes as applicable shall be strictly adhered to by the contractor and his quoted rates shall be deemed to include these factors. If any bidders quotated their rates below minimum wages with EPF, ESIC , Bonus with applicable GST, such bid shall be treated as willfull negligence by the bidder and shall be considered non-bonafied and rejected during financial evaluation.(l)The contractor shall provide Bio-metric attendance machine for attendance of labours / staffs. The payment will be made on Biometric attendance report . |
| 4 | All as per item No 1.0 here-in-before butDG Sets (500 kVA - 01No), Transformers (500 KVA-02 Nos), HT Panel (1250 Amps -02 Nos, 800 Amps-08Nos) & Connected LT/Feeder pillar box Panels at UC-2. |
| 5 | All as per item No 1.0 here-in-before butDG Sets (250 kVA - 01Nos), Transformers (250 KVA-02 Nos) HT Panel (1250 Amps -02 Nos, 800 Amps-08Nos) & Connected LT/Feeder pillar box Panels at UC-3. |
| 6 | All as per item No 1.0 here-in-before but DG Sets (250KVA - 01Nos),(500 kVA - 02Nos), Transformers (250 KVA-02 Nos),(800KVA-02 Nos), (2000 KVA-02Nos) HT Panel (1250 Amps -02 Nos, 800 Amps-10Nos) & Connected LT/Feeder pillar box Panels at UC-4. |
| 7 | All as per item No 1.0 here-in-before but DG Sets (250 kVA - 01Nos),,Transformers33/11KV(12500 KVA-02 Nos),(7500KVA-02 Nos), Transformers 11/0.433 KV(250 KVA-01Nos) HT Panel 11KV (1250 Amps -02 Nos, 800 Amps-14 Nos) HT Panel 33 KV (1250 Amps-02 Nos , 800 Amps -08 Nos) & Connected LT/Feeder pillar box Panels at UC-5. |
| 8 | All as per item No 1.0 here-in-before but DG Sets (250 KVA - 01Nos),(750 KVA - 02Nos), Transformers (250 KVA-02 Nos),(1000KVA-02 Nos), (2000 KVA-02Nos)HT Panel (1250 Amps-02 Nos 800 Amps -10 Nos) & Connected LT/Feeder pillar box Panels at UC-6. |
| 9 | All as per item No 1.0 here-in-before butDG Sets (750 kVA - 03Nos),Transformers (1000 KVA-02 Nos),(1250KVA-02 Nos) HT Panel 11 KV (1250Amps-02 Nos, 800 Amp[s -10 Nos) & Connected LT/Feeder pillar box Panels at UC-7. |
| 10 | All as per item No 1.0 here-in-before butDG Sets (250 kVA - 01Nos),(500 kVA - 03Nos), ,Transformers 11/0.433 (250 KVA-02 Nos),(2000KVA-04 Nos), HT Panels (1250Amps-02 Nos, 800 Amps-10Nos) & Connected LT/Feeder pillar box Panels at UC-10 |
| 11 | Supply only toping of water coolents for radiator assembly. |
| 12 | Total Amount in Figures |
| 13 | Quoted Amount in Words |