| 1 | Preventive maintenance of 100/20T EOT Crane comprising of Brake Setting, checking of Brake Shoe Pad, drive inspection, inspection and Top-up of Gear-box oil, Lubrication of Snatch Boxes of 100T and 20T Hooks, greasing of Wire Ropes, DPT of Hooks, Checking of Limit Switches and tightness checking of Bridge-Carriage fasteners etc. as per Technical Specification and instructions from Engineer-in-Charge. |
| 2 | Load Testing of 100/20T EOT Crane inclusive of transportation of required load from WIP to PRPD and returning the same after completion of load testing. The rate shall includecharges for hiringHydra crane,Truck and manpower required for thecompletion of the above work. |
| 3 | Preventive maintenance of 20/5T EOT Cranes comprising of Brake Setting, checking of Brake Shoe Pad, drive inspection, inspection and Top-up of Gear-box oil, Lubrication of Snatch Boxes of20T Hooks, greasing of Wire Ropes, DPT of Hooks, Checking of Limit Switches and tightness checking of Bridge-Carriage fasteners etc. as per Technical Specification and instructions from Engineer-in-Charge. |
| 4 | Load Testing of 20/5T EOT Crane(Bldg-18)and 20TEOT Crane(Bldg-14) Crane inclusive of safe transportation of Loads with Cradle inside plant premises (within 500m with Departmental Hydra) as per technical specification and instructions from Engineer-in-Charge |
| 5 | Preventive maintenance of EOT Cranes ranging from 10-12T Capacity comprising of Brake Setting, checking of Brake Shoe Pad, drive inspection, inspection and Top-up of Gear-box oil, Lubrication of Snatch Boxes of 10-12T Hooks, greasing of Wire Ropes, DPT of Hooks, Checking of Limit Switches and tightness checking of Bridge-Carriage fasteners etc. as per Technical Specification and instructions from Engineer-in-Charge. |
| 6 | Load Testing of EOT Cranes ranging from 10-12T inclusive of internal transportation of Loads with Cradle inside plant premises(within 500m with Departmental Hydra) as per technical specification and instructions from Engineer-in-Charge |
| 7 | Preventive maintenance of 5T EOT Cranesin SFSP (Active area),Chilling plant, Stores, Bldg-1 & Bldg-15comprising of Brake Setting, checking of Brake Shoe Pad, drive inspection, inspection and Top-up of Gear-box oil, Lubrication of Snatch Boxes of 5T Hooks, greasing of Wire Ropes, DPT of Hooks, Checking of Limit Switches and tightness checking of Bridge-Carriage fasteners etc. as per Technical Specification and instructions from Engineer-in-Charge. |
| 8 | Load Testing of 5T EOT Cranes located in SFSP (Active area),Chilling plant, Stores, Bldg-1 & Bldg-15 inclusive of internal transportation of Loads with Cradle inside plant premises(within 500m with Departmental Hydra) as per technical specification and instructions from Engineer-in-Charge |
| 9 | Overhauling and Load Testing of 1T capacity MO Trolley Craneslocated at SFSP (Active area) as per Technical specification. |
| 10 | Servicing and Load Testing of up to2T capacity Hand operated Trolley Crane located at De- contimationfacility and Solid waste area (Active area)as per Technical specification. |
| 11 | Servicing andLoad Testing of Chain pulley block Hoist up to 2T capacity as per Technical specification. |
| 12 | Supply and application of 2 coats of Red Oxide primer followed by 2 coats of Enamel Paint of approved make and colour for Crane Bridge and Trolley Structures after cleaning inclusive of supply of paint and primer, arrangement of height passes , erection of scaffoldings etc. as per technical specification and instructions from Engineer-in-Charge |
| 13 | Miscellaneous material handling works related to preventive maintenance & load testing of EOT Cranes |