|
| 1 | REPAIR/MAINT OF BATH/TOILET AND 01 NO RCC WASH BASIN AT COB DADAM |
| 2 | 1/2 Brick wall in cement Motor (1:4). |
| 3 | Providing & laying plastering 15mm thick in CM(1:4) |
| 4 | Providing & fixing PVC solid doors shutter with chowkhat incl hinges, 02 Nos tower bolt & 02 Nos sandles (0.8x2 mtr). |
| 5 | Finishing even & smooth with floating coat of cement slurry. |
| 6 | Providing & laying ceramic non skid tiles colours laid down existing floor over screed bed cement motor 1:4 & tiles fixed with cement slurry and joint filled with colour pigment. |
| 7 | Providing & fixing GI Pipe medium grade 15 mm dia without fittings like GI Tee, nipples, bends, socket completes. |
| 8 | Providing & fixing bib cock brass 15 mm dia (PTMT). |
| 9 | Providing & fixing looking mirror PVC frame 40x40 CM. |
| 10 | Providing & laying RCC (1:2:4) 50 mm thick. |
| 11 | Providing & laying MS reinforcement 8 to 12mm dia 3% of 0.122 |
| 12 | Use & waste form work to RCC slab. |
| 13 | Providing & laying ceremic glized tiles on WHB. |
| 14 | PERIODICAL SERVICE OF T-V ACCN NO.P/04 |
| 15 | Providing & laying 2 coat of oil bound distemper on existing surface. |
| 16 | Providing & laying two coat of syn enamal paint on door/window/cup board. |
| 17 | Providing & applying 1.5 mm thick POP on wall and ceiling. |
| 18 | REPAIR OF GENR SET 63 KVA |
| 19 | Replacement of liner |
| 20 | Replacement of piston with ring |
| 21 | Replacement of engine valve |
| 22 | Replacement ofvalve guide |
| 23 | Replacement ofvalve lock |
| 24 | Replacement of gasket |
| 25 | Replacement of house clamp |
| 26 | Replacement of valve oil seal |
| 27 | Replacement of bearing set |
| 28 | Replacement of banzo washer kit |
| 29 | Repair of FIP |
| 30 | Repair of nozzle |
| 31 | Serviceing of cylinder head |
| 32 | Repair of radiator |
| 33 | Overhauling of 63 KVA Genr set |
| 34 | Rebinding of 30 KVA alternator 3 phase, rebinding with copper wire & varnishing, replacement of 2x bearing & 2x bush and replacement of AVR. |
| 35 | Rebinding of 12.5 KVA alternator 3 phase, rebinding with copper wire & varnishing, replacement of 2x bearing & 2x bush. |
| 36 | Replacement of self starter of 7.5 KVA Genr set. |
| 37 | Rebinding of 3 phase12.5 HP electrict motor with copper wire and replacing of 2 Nos bearing. |
| 38 | REPAIR OF AC |
| 39 | Dismantling of 01 Nos 1.5 Ton AC & fixing only01 No 1.5 Ton Split AC. |
| 40 | Repair/replacement of mother board 02 Nos Split AC 1.5 Ton. |
| 41 | REPAIR BADMINTON COURT |
| 42 | Providing & fixing hard wood kiln season wood chemically treated as in floor frame. |
| 43 | Providind & laying 15mm thick in CM(1:4). |
| 44 | Providing & applying 2 coat of syn enamel paint over a coat of odinary payment |