Tender For Fencing With Culvert And Pipeline.; 1 Providing Chain Link Fencing @Sports Ground in Meledayalam Pt 2 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. 3 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 4 Cement concrete in 1:2:4 mix using 20 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. 5 Chain fensing (2x2) using 10kg galvanized iorn wire) including cost and conveyence all material at site and labour charges etc completed 6 Rcc Post (0.15x0.15x2.1) 7 Supply and Fixing Steel Door including all charges 8 Towards labour Charges for fixing Chain Link Fencing 9 Fixing of Name Board including cost, painting, Lettering, installation etc. 10 Photographic charges for taking photos in various stages before execution, during execution and after execution 11 Providng Pipeline Work @ PDS Shop in Meledayalam Pt 12 Earthwork excavation with alead upto 10m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small sized boulders and hard gravelly soil 13 Supply and delivery of following size of PVC pipes and specials as per IS 4985 with ISI mark and manufacturar brand 14 32mm PVC Pipe 15 Solvent Cement 16 Conveying of the following classification of PVC pipes lowering into the trenches laying to proper grade alignment with PVC coupler and specials 17 Refilling with excavated earth other than sand including allcharges with standard specification 18 Photographic charges for taking photos in various stages before execution, during execution and after execution 19 Providng Pipeline Work @ Anganwadi Building in Meledayalam Pt 20 Earthwork excavation with alead upto 10m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small sized boulders and hard gravelly soil 21 Supply and delivery of following size of PVC pipes and specials as per IS 4985 with ISI mark and manufacturar brand 22 32mm PVC Pipe 23 Solvent Cement 24 Conveying of the following classification of PVC pipes lowering into the trenches laying to proper grade alignment with PVC coupler and specials 25 Refilling with excavated earth other than sand including allcharges with standard specification 26 Photographic charges for taking photos in various stages before execution, during execution and after execution 27 Construction of RCC Slab Culvert @ Colony Mariyamman Kovil St in Meledayalam Pt 28 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. 29 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. 30 Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications 31 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation 32 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks 33 Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab 34 Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc. 35 Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc. 36 Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works 37 Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, 38 Fixing of Name Board including cost, painting, Lettering, installation etc. 39 Photographic charges for taking photos in various stages before execution, during execution and after execution 40 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package} Please Enable Macros to View BoQ information