|
| 1 | Providing Chain Link Fencing @Sports Ground in Meledayalam Pt |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 4 | Cement concrete in 1:2:4 mix using 20 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. |
| 5 | Chain fensing (2x2) using 10kg galvanized iorn wire) including cost and conveyence all material at site and labour charges etc completed |
| 6 | Rcc Post (0.15x0.15x2.1) |
| 7 | Supply and Fixing Steel Door including all charges |
| 8 | Towards labour Charges for fixing Chain Link Fencing |
| 9 | Fixing of Name Board including cost, painting, Lettering, installation etc. |
| 10 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 11 | Providng Pipeline Work @ PDS Shop in Meledayalam Pt |
| 12 | Earthwork excavation with alead upto 10m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small sized boulders and hard gravelly soil |
| 13 | Supply and delivery of following size of PVC pipes and specials as per IS 4985 with ISI mark and manufacturar brand |
| 14 | 32mm PVC Pipe |
| 15 | Solvent Cement |
| 16 | Conveying of the following classification of PVC pipes lowering into the trenches laying to proper grade alignment with PVC coupler and specials |
| 17 | Refilling with excavated earth other than sand including allcharges with standard specification |
| 18 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 19 | Providng Pipeline Work @ Anganwadi Building in Meledayalam Pt |
| 20 | Earthwork excavation with alead upto 10m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small sized boulders and hard gravelly soil |
| 21 | Supply and delivery of following size of PVC pipes and specials as per IS 4985 with ISI mark and manufacturar brand |
| 22 | 32mm PVC Pipe |
| 23 | Solvent Cement |
| 24 | Conveying of the following classification of PVC pipes lowering into the trenches laying to proper grade alignment with PVC coupler and specials |
| 25 | Refilling with excavated earth other than sand including allcharges with standard specification |
| 26 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 27 | Construction of RCC Slab Culvert @ Colony Mariyamman Kovil St in Meledayalam Pt |
| 28 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 29 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 30 | Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications |
| 31 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation |
| 32 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks |
| 33 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab |
| 34 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc. |
| 35 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc. |
| 36 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works |
| 37 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 38 | Fixing of Name Board including cost, painting, Lettering, installation etc. |
| 39 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 40 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |