|
| 1 | M&L for preparing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with mechanical equipment, to remove all loose dirt etc complete all as specified and as directed. |
| 2 | M & L for Applying evenly a priming/tack coat with bituminous primer of paving bitumen at5 kg per 10 square metre with bitumen grade VG-10 on blacktop surface using mechanical sprayer complete all as specified and as directed. |
| 3 | M&L for premix asphaltic semi-dense concrete 30mm consolidated thickness with 5.5% binder content (paving bitumen any penetration of grade VG-30) by weight of total mix, mixed in hot mix plant & laid by using mechanical paver rolled and compacted to required camber and gradient using 8 to 10 tonne power roller complete all as specified ans directed.Note: The work shall be executed by using hot mix plant and mechanical paver. |
| 4 | M&L for premixed bituminous macadam (consolidated thickness 75mm or less) using with 4% binder content (paving bitumen any penetration of Grade VG-30) by weight of total mix, mixed in hot mixed plant and laid by using mechanical paver and rolled and compacted to required gradient and camber using 8 to 12 tonne power roller complete all as specified and as directed.Note: The work shall be executed by using hot mix plant and mechanical paver. |
| 5 | Material and labour for Preparation of road surface and applying thermoplastic reflective paint in marking of minimum 2.5mm thick single coat as in centre line and edge line road marking of 150/100 mm width using \"HOT MARK\" thermoplasticmodern propelledroad marking machine as directed including all ingredients such as blinder, glass beads Titanium dioxide calcium carbonate inter fillers thermoplastic requirement for glass beads shall be the Table No 800.4 of MORTH specification including spraying of glass beads etc all as per manufacture instructions and as specified and directed. |
| 6 | S&F in repair solar road delineator 6 LEDs of colour red/ yellow housed in plastic body, LEDs, solar-cells, battery and light sensor well protected inside, polycarbonate sheet; device protected with powder coated wire mesh, cage. System mounted over 47 mm dia steel tube powder coated of length 600 mm having sheet foot for firm grip to ground. Delineator to have additional reflective bands. System workable for 2-3 days (nights) after full charge for 8-10 hours.Note: Delineators with extra height shall also be provided e.g. of height 750, 900 OR 1000mm (without any extra cost) all as directed by GE. |
| 7 | S&F in repair solar road stud having 3 LEDs of colours unbreakable Poly carbonate shell & clear facings designed for maintenance free operation, 100% water proof design confirms to IP67, Dimension: 125 X 125 x 25mm with Dual Shank of 65 mm.High Efficiency mono-crystalline Solar panel 3 V / 120 mA., One Ni-Mh LSD rechargeable battery (1.2V/800 mA) high temperature, Six Super bright LEDs with 14,000 mcd, View distance: Up to 1000m, Flash rate: 2Hz or according to customers requirements, Bearable weight: 20 Tons, Color: Red, Amber, Blue, Green and White, Working time: 36 to 40 hours successively after the battery is fully charged, The electronic circuit is encapsulated with the battery in the body of the Solar Stud, A non-invasive switch (optional) to avoid battery drainage during storage and transportation, Charging time: five to six hours/day, Working temperature: - 40° ~ 75°C, Lifetime: Three to five years, Easy installation, no maintenance, Brightness sensitive auto-switch automatically turns on at night and turns off at dawn, High visibility LED\"s help ensure easy and safe night driving, Ideal for highways, parking lots, roads and similar isolated or stand-alone traffic applicationscomplete as per MORTH/IRC specifications and manufacture\"s instruction, complete all as specified and directed. |
| 8 | S&F in repair aluminium road studs oftwo way reflective, dimensions 110 x 128 x 30 mm, aluminium Alloy body, Reflective Panel- Amber, Red or White Weight : 530 complete aluminium coated of approved quality, complete all as specified and directed. |
| 9 | NOTE : SCHEDULE OF CREDIT (Amount on page No 26 shall be deducted offline from the total quoted amount to arrive at the net contract sum to be considered for acceptance.) |