Erection of Tubular/rail or PCC pole strut in cement concrete 1:3:6 ( 1 cement : 3 Coarse Sand : 6 Graded Stone aggregate 40 MM nominal size) foundation including excavation and refilling and secures with holding clamp bolt nuts etec as required.
2
Stay Pit Digging
3
Transportation of poles from road side to pole pit for a lead of 1 Km.
4
Shifting of other materials to pole pit.
5
Stringing of ACSR rabbit conductor three conductor long 1 KM x 3 wire
6
Supply and Erection of Galvanized stay set for 11KV Over head line complete with 19/20mm dia x 1.8 mtr long stay rod, anchor plate of size 45cm x 45cm x 7.5mm thick , thimble, stay clamps, turn buckle (20mm x 600mm) complete with stay wire 7/4.00 mm dia GI stay wire & 11KV strain insulator & concrete 1:3:6 ((1 cement: 3 coarse sand:6 graded stone aggregate 40mm nominal size) foundation including exacavation and refilling etc. as required.)
7
Supply and Erection of pin insulator Complete with large Steel Hard GI Pin Nuts and washers etc. as required.
8
Supply and Erection 11 KV Disc Insulator with galvanised strain clamp, Bolt, Nuts and washer etc. as required.
9
Running Earth 8 SWG wire
10
3.3 KV, 5 KA Lighting Arrestor with Bracket for 3.3 KV overhead line
11
Maintenance Free earthing system/ground enhancement materials as per technical specification and as per IEE809( 14.5D) standard , including measurement of soil resistance after completion of work consisting as follows : Providing & Fitting of Copper bounded maintenance free earth rod ( 5/8 inch 10\"feet) 02 GEM Bags.
12
Installation of earthing system as per specification
13
Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.