|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Dismantling R.C.C. work including stacking of material within 60 meter lead all complete as directed by the Engineer in charge. |
| 3 | Dismantling Brick masonry work with Cement Mortar including stacking of material within 60-meter lead all complete as directed by the Engineer in charge. |
| 4 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M complete (Manual). |
| 5 | Laying brick ballast of size 25-40 mm i/c all cost labour, T&P etc. but excluding cost of brick all complete as directed by the Engineer in charge. |
| 6 | Supply and laying Plain cement concrete (P.C.C.) in 1 : 2 : 4 using size (10-20) mm graded crushed aggregate i/c all cost of material, Labour, T&P etc. all complete as directed by the Engineer in charge. |
| 7 | Brick masonry with cement mortar of ratio 1:4 i/c all cost of material all labour, T&P and etc all complete as directed by the Engineer in charge. |
| 8 | Providing ordinary centring and shuttering of ply wood or steel for RCC work i/c all cost material, Labour T&P etc. all complete as directed by the Engineer in charge. |
| 9 | S/Laying reinforcement steel at site per M.T. including bending, binding, cutting and placing in position of reinforcement i/c cost of material, labour and T&P etc.all complete as directed by the Engineer in charge. |
| 10 | Supply and laying Cement concrete (M-25) in 1:1:2 i/c all cost of material, Labour, T&P etc. (Reinforced cement concrete) all complete as directed by the Engineer in charge. |
| 11 | Struck Deep pointing in Cement Mortar of ratio 1:2 i/c all cost of material, labour T&P etc. all complete as directed by the Engineer in charge. |
| 12 | Earth work in filling and stg. of damaged banks of canals/ Filling rain cuts/ damaged service road etc i/c lift upto 1.5 m & lead upto 1.0 Km distance, labour, T&P etc all complete as directed by the Engineer in charge. |
| 13 | Two coat of water proof cement paint Weather coat of approved quality on new surface to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper all complete as directed by the Engineer in charge. |
| 14 | Writing letter including cost of material for sign board etc. i/c labour etc all complete as directed by the Engineer in charge. |
| 15 | Providing and Fixing R.C.C. (1:1:2) WHEEL GUARD of size (0.30*0.30*1.20) m incd all material labour T&P etc all complete as directed by the Engineer in charge. |
| 16 | Brick on edge floor with M-150 brick laid dry joints sand filled including preparation of proper slope and its ramming including supply of all materials. labour and T&P etc. required for proper completion of the work. Please Enable Macros to View BoQ information |