| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Dismantling R.B. or R.C.C. work including stacking of material within 60 meter lead all complete as directed by the Engineer in charge. |
| 3 | Dismantling Brick or stone masonry work with Cement Mortar including stacking of material within 60-meter lead all complete as directed by the Engineer in charge. |
| 4 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M complete (Manual). |
| 5 | Laying brick ballast of size 25-40 mm i/c all cost labour, T&P etc. but excluding cost of brick all complete as directed by the Engineer in charge. |
| 6 | Brick masonry with cement mortar of ratio 1:4 i/c all cost of material all labour, T&P and etc all complete as directed by the Engineer in charge. |
| 7 | Supply and laying Plain cement concrete (P.C.C.) in 1 : 2 : 4 using size (10-20) mm graded crushed aggregate i/c all cost of material, Labour, T&P etc. all complete as directed by the Engineer in charge. |
| 8 | Supply and laying Cement concrete (M-25) in 1:1:2 i/c all cost of material, Labour, T&P etc. (Reiforced cement concrete) all complete as directed by the Engineer in charge. |
| 9 | S/Laying reinforcement steel at site per M.T. including bending, binding, cutting and placing in position of reinforcement i/c cost of material, labour and T&P etc.all complete as directed by the Engineer in charge. |
| 10 | Struck Deep pointing in Cement Mortar of ratio 1:2 i/c all cost of material, labour T&P etc. all complete as directed by the Engineer in charge. |
| 11 | 12 mm thick Cement Plaster in ratio 1:4 (1 Cement : 4 Coarse Sand) on brick work i/c all cost of material, Labour, T&P etc. all complete as directed by the Engineer in charge. |
| 12 | Providing ordinary centring and shuttering of ply wood or steel for RCC work i/c all cost material, Labour T&P etc. all complete as directed by the Engineer in charge. |
| 13 | Providing and Fixing R.C.C. (1:1:2) Wheel Guard of size (0.30*0.30*1.20) m incd all material labour T&P etc all complete as directed by the Engineer in charge. |
| 14 | Writing letter including cost of material for sign board etc. i/c labour etc all complete as directed by the Engineer in charge. |
| 15 | Earth work in filling and stg. of damaged banks of canals/ Filling rain cuts/ damaged service road etc i/c lift upto 1.5 m & lead upto 1.0 Km distance, labour, T&P etc all complete as directed by the Engineer in charge. |
| 16 | Finishing wall with one coat of water proof cement paint Weather coat of approved quality on previously new surface with this paint to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. |
| 17 | Brick on edge floor with M-150 brick laid dry joints sand filled including preparation of proper slope and its ramming including supply of all materials. labour and T&P etc. required for proper completion of the work. Please Enable Macros to View BoQ information |