|
| 1 | Dismentaling of old brick work in drain etc all complet |
| 2 | Dismentaling of old Interlocking. road etc all complet |
| 3 | Earth Work in Excavation for foundations in Silty soil /malva/ garbej including dressing and ramming of bottom and disposal of surplus excavated earth as directed by Engg.-In-Ch.SI 251 |
| 4 | Earth Work in cutting in ordinary soil including dressing and ramming of bottom and disposal of surplus excavated earth as directed by Engg.-In-Ch.SI no.253 |
| 5 | Providing and laying P.C.C. 1:4:8 (cement,finesand, 40mm gauge b/ballast) etc all complet. SI 275 |
| 6 | M-150 class Brick work over base concreate in Cement Mortar 1:3 including all material, labour, T&P in foundation work below plinth laveel complete . SI no.307 |
| 7 | 12/15 mm thick Plaster with 1:3 mix (cement& C/sand mortor) etc all complet . SI 587(3) |
| 8 | Pro & Laying of C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grite over drain etc all complet.si (279b) |
| 9 | R.C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grit to cover the crossing over drain etc all complet.SI NO.284 |
| 10 | M.S. Iron work for R.C.C. cover with cutting and bindining etc all complet.SI NO 504 |
| 11 | S/L/R/C of G.S.B. stone grite with water and dust 2.38-6.7 mm gauge consolidation including road roller 8-10 K-N etc all complet. |
| 12 | P/L 80 mm paver Interlocking tiels rabber molded including fine sand coussning and making camber in road etc all complet. |
| 13 | Providing and fixing barigating on both side of trench and dismentling etc all complet. |
| 14 | supplu and laying of following size PVC pipe including their jointing material and cartage to site of ect |
| 15 | Add jointing material as abodia of pipe line etc all comp |
| 16 | interconnetion of old line to new with complete work |
| 17 | DisposalCartage of earth up to 4.0 km distance loding and unloding charge including etc all complet. |
| 18 | Head loading of material (30 m each chain)3 chain with loading unloading etc all complet |
| 19 | S/fixing of name board with frame of b/w,plaster and Photographi work. |
| 20 | P/L Soil material labour all com |
| 21 | Deduction brik work |
| 22 | Deduction brik bat Please Enable Macros to View BoQ information |