| 1 | TRANSPORTATION OF DC, RIG MACHINE & ITS T&P & Erection, Dismantle Rig Machine from divisional store to T.W. site 1x1x50 of ring & assonated. Complete in all respect including all material, T&P labour etc. |
| 2 | AIR COMPRESSOR Transportation of Air compressor from previous site to tubewell site by tractor and Erection at site & dismantle back to store 1x2x50 Km & Transportation of compressor T&P by truck of store 1x2x50 Km. Complete in all respect including all material, T&P labour etc. |
| 3 | O.P. UNIT, Transportation of O.P. Unit from previous site to tube well site by tractor and Erection of op unit & at site return from site to store 1x2x50 Km, Transportation of O.P. Unit T&P from previous site to tube well site by tractor and return trip of empty from site to store 1x2x50 Km. Complete in all respect including all material, T&P labour etc. |
| 4 | Drilling of pilot bore DRILLING 200mm dia bore from G.L. to 120m BGL |
| 5 | Reaming 625mm dia bore from GL bgl to 80m BGL |
| 6 | Reaming 450mm dia bore from 80M bgl to 120m BGL |
| 7 | M.S. tube well assembly with all required parts like plane pipe (as required up to 50% of plain pipes) rings, well cap, ball plug, clamp, reducer, Central guide, support structure etc. as required and as per type and design. Complete in all respect including all material, T&P labour etc. 300 mm dia size |
| 8 | M.S. tube well assembly with all required parts like plane pipe (as required up to 50% of plain pipes) rings, well cap, ball plug, clamp, reducer, Central guide, support structure etc. as required and as per type and design. Complete in all respect including all material, T&P labour etc. 200 mm dia size |
| 9 | 300mm dia MS ERW Plain/Slotted pipe from G.L. to 80m BLG. |
| 10 | 200mm dia MS ERW plain/slotted pipe from 80m BLG to 120m BGL |
| 11 | PEA-GRAVEL Supply of 1.6mm to 4.8mm size gravel duly screened and washed as per IS 4097 |
| 12 | DEVELOPMENT OF TUBEWELL Development of tubewell by 250 PSI Compressor as per IS 11189 Development of Tube well by compressor |
| 13 | DEVELOPMENT OF TUBEWELL BY O.P. UNIT AS PER IS 2800 Development of Tubewell by 3 Cusec O.P. Unit |
| 14 | TEST Chemical and Bacteriological test |
| 15 | TEST Verticality and yield test of Tubewell |
| 16 | SITC of 25KVA Stabilizer. |
| 17 | KSB Three phase submersible pump set 30 H.P. Rate as per by jem |
| 18 | SITC of main pulping & Valves with 24 mtr 100 mm Column pipe, Electronic type Chlorinating plant power wiring, earthing, printing, tools set, wiring of pump house (internal & external) chain pulley block and gauges complete in all respect material, T&P labour Switch gear item complete suitable to 30 H.P. pumping plant including submersible cable of suitable size and length along with provision of atomization system of above pumping, Main piping & valve for above pump with 24m 100mm dia column pipe. Valves P.N. rating 1.0 as per IS & Pressure guage and depth gauge along with 6mm dia air line fitting & 2 Ton capacity 4.5 m life spur geared chain puley block tested on 3 tone load as per IS 3832 Special tools & spanner. |
| 19 | 3M Long heavy duty column pipe |
| 20 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 Mtr. Including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. (including Royality) PWD SOR 251 |
| 21 | P.C.C 1:4:8 PWD SOR 281 |
| 22 | R.C.C. work with cement approved coarse sand and 2 cm. Gauge approved stone grit in propottions of 1:2:4 in lintels of door and windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. PWD SOR 283 |
| 23 | M.S. (tor steel or plain) in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. PWD SOR 504 |
| 24 | M - 150 Brick work in 1:4 ( 1 Cement & four corse sand) ( of 1.25 F.M.) morter. PWD SI No 305 |
| 25 | Earth Filling in foundation all complete |
| 26 | 12 mm thick plaster in 1:4 cement and coarse sand mortar. PWD SOR 13.11C |
| 27 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR code no 13.80 |
| 28 | Distempering (First coat) with oil bound distemper of approved brand and manufacture & of required shade on undecorated wall surfaces to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J and N Shalimar, Asian Paints after thoroughly brushing the surface free from mortar droppings and other foreign materials and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials, labour, T&P etc. PWD SOR No 649 |
| 29 | M.S. or iron work in angle Iron Door and window frame including cutting, welding & wastage including supply of all material, labour T&P etc. required for proper completion of the work. PWD SOR 503 (A) |
| 30 | 320 miter DI pipe line as per attach estimate |
| 31 | Laying & Providing Sing Board Size (3x2) Fit Please Enable Macros to View BoQ information |