Tender for Construction And Rehabilitation Of Comprehensive Sewer System In Central Zone Of Nagpur (Package - Cp4) , Excavation For Foundation / Pipe Trenches, Manholes, Chambers & All Works In Earth, Soils Of All Types, Sand, Gravel And Soft Murum, Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below, Stacking And Spreading As Directed, Normal Dewatering, Preparing The Bed For Foundation And Excluding Backfilling, Etc. Complete. (Bd-A- 1/259) Including Barricading, Danger Lighting Etc Soils Of All Types, Sand, Gravel And Soft Murum, , 0 To 1.5 Mts. Depth , 1.5 To 3.0 Mts. Depth , 3 To 4.5 Mts. Depth , 4.5 To 6 Mts. Depth , 6.0 To 7.5 Mts. Depth , 7.5 To 9.0 Mts. Depth , Excavation For Foundation / Pipe Trenches, Manholes, Chambers & All Works In Earth In Hard Murum And Boulders, W.B.M. Road Including Removing The Excavated Material Upto A Distance Of 50 M Beyond The Area And Lifts As Below, Stacking And Spreading As Directed By Engineer-In-Charge, Normal Dewatering, Preparing The Bed For Foundation And Excluding Backfilling, Etc. Complete. (Bd-A-3/259) Including Barricading, Danger Lighting Etc , 0 To 1.5 Mts. Depth , 1.5 To 3.0 Mts. Depth , 3 To 4.5 Mts. Depth , 4.5 To 6 Mts. Depth , 6.0 To 7.5 Mts. Depth , 7.5 To 9.0 Mts. Depth , Excavation For Foundation / Pipe Trenches, Manholes, Chambers & All Works In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road Including Removing The Excavated Material Upto A Distance Of 50 M Beyond The Area And Lifts As Below, Stacking As Directed By Engineer-In-Charge, Normal Dewatering, Preparing The Bed For Foundation And Excluding Backfilling, Etc. Complete. (Bd-A- 4/259) Including Barricading, Danger Lighting Etc , 0 To 1.5 Mts. Depth , 1.5 To 3.0 Mts. Depth , 3 To 4.5 Mts. Depth , 4.5 To 6 Mts. Depth , 6.0 To 7.5 Mts. Depth , 7.5 To 9.0 Mts. Depth , Excavation For Foundation/Pipe Trenches, Manholes, Chambers & All Works In Hard Rock And Concrete Road By Chiselling, Wedging, Lin