| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. SSR 2018-19,( Item No.2.18) |
| 3 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard Proctor density after laying them in layers of 20 cm.to 30 cm. with Power roller.(Item No. 2.24) |
| 4 | Supplyingtrap/granite/quartzite/gneissstonemetalofrequiredsize by bringingthe boulders/ Rubbleat theroad sidebreaking themto requiredgradationincludingconveyingtheboulders/Rubbleand stackingthebrokenmetaletc.complete.(Priorapprovalofsample stackofbrokenmetalbytheEx.Engineerisnecessarythedateof approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).( ItemNo. 50.56) |
| 5 | Supplyingtrap/granite/quartzite/gneissstonemetalofrequiredsize by bringingthe boulders/ Rubbleat theroad sidebreaking themto requiredgradationincludingconveyingtheboulders/Rubbleand stackingthebrokenmetaletc.complete.(Priorapprovalofsample stackofbrokenmetalbytheEx.Engineerisnecessarythedateof approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken) ( Item No. 50.57) |
| 6 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. SSR 2018-19,Item No.2.29a |
| 7 | Supplying soft murum at the road site, including conveying and stacking complete.SSR 2018-19,Item No.2.29b |
| 8 | Spreading 80/40mmmetalforroadworkincludingsectionongetc complete as directed by Engineer in charge . (Item No. 50.58) |
| 9 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete.SSR 2018-19,Item No.2.30 |
| 10 | Compactingthesubgrade/gravel/oversizemetal(200mmloose) layersforallwidthwithPowerrollerhavingweight8to10MT. including necessary, labour, materials and artificial watering complete. (Item No. 50.59) |
| 11 | Compacting the sub grade / gravel / size metal (100 mm loose) layers forallwidthswithPowerrollerhavingweight8to10MT.including necessary, labour, materials and artificial watering complete.40 MM Metal ( Item No. 50.61) |
| 12 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc.complete. SSR 2018-19,Item No.2.31 |
| 13 | Providingandfixingboarddisplayinginformation,suchas\"Nameof work, Tender cost, Name of Contractor, Work completion and liability period etc\", having rectangular shape of 1.20m x 0.90m size made out 18gauge(1.25mm)thickmildsteelsheetpaintedwithonecoatof Zinc chromate stoving primer and two coats of enamel paint on front sideandgreystoveenamelonbacksideandborder/messages/ symbols etc. with approved colour shade paint complete, on M.S.angleofsize35x35x3mmframewithproperlycrossbraced M.S.anglesofsize35mmx35mmx3mmdulypaintedincludingTwo M.S.angleironpostsofsize65mmx65mmx6mm,3.65mlong painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge (Item No. No. 6.36) |
| 14 | Add For Royalty |
| 15 | Add For Testing |
| 16 | Add For Insurance |
| 17 | Add For GST |