| 1 | Routine work of operation of departmental bulldozers in three relay shifts round the clock for Coal feeding, Coal shifting and other work assigned time to time in Coal Handling Plant, Parichha and operation of 01 Nos. BEML Pay-loader model BL-9H as per site requirement by deploying dozer operators as per scope of work in each shift round the clock |
| 2 | Checking & mainWork of Spraying of water for coal dust suppression during coal shifting, feeding and compacting in Coal stack yard area of CHP 2X210 MW and 2x250MW by with help of hose pipes and nozzles by engaging number of labours as per site requirement, round the clock on when and where required basis during Dozer’s operation.tenance schedule No. A as per scope of work |
| 3 | Daily Routine maintenance work on dozer |
| 4 | Checking & maintenance schedule No. A as per scope of work |
| 5 | Checking & maintenance schedule No. B as per scope of work |
| 6 | Checking & maintenance schedule No. C as per scope of work |
| 7 | Servicing & Overhauling of alternator |
| 8 | Rewinding of alternator |
| 9 | Fabrication of canopy & replacement of its cover |
| 10 | Replacement of seat cover with foam & Rexene |
| 11 | Attending Oil Leakage From Tilt Cylinder |
| 12 | Attending Oil Leakage From Lift Cylinder |
| 13 | Attending Fault Of Steering system control valve |
| 14 | Attending Fault of Transmission control valve |
| 15 | Replacement Cutting edge. (01 set) |
| 16 | Replacement End bits. (01 set) |
| 17 | Replacement Sprocket (all teeth of both side) |
| 18 | Replacement Hose in hydraulic/ transmission/ steering system |
| 19 | Replacement Hose in Radiator |
| 20 | Attending fault of steering system |
| 21 | Cleaning of fuel tank & removal of choking from fuel pipeline |
| 22 | Cleaning & repairing of hydraulic tank |
| 23 | Cleaning & repairing of radiator assembly |
| 24 | Repairing & fitting of track gaurds |
| 25 | Repairing/servicing of servo valve/transmission control valve/steering control valve of hydraulic system |
| 26 | Replacement of packing/dust seal of recoil spring |
| 27 | Replacement of damaged sprocket nut &bolt(with material supply) |
| 28 | Fitting of single-track chain on dozer (either side) |
| 29 | Retracing of chain on dozer (either side) |
| 30 | Replacement/Re-fitment of track guard of dozer |
| 31 | Replacement/Re-fitment of track chain cover of dozer |
| 32 | Taking out broken bolt from the body of track chain& bolting with supplied nut& bolt |
| 33 | Adjustment of gear system |
| 34 | Fitting of spacer in track chain of dozer (either side) |
| 35 | Repairing & Reconditioning of dozer blade by welding with manganese electrode |
| 36 | Replacement/reconditioning of idler |
| 37 | Replacement/repairing of Hydraulic pump/ Transmission pump/ Steering pump/ water pump / engine Lube oil pump |
| 38 | Over Hauling of lift cylinder of dozer blade |
| 39 | Over Hauling of tilt cylinder of dozer blade |
| 40 | Reconditioning/servicing of lube oil coolers |
| 41 | Checking, replacement and testing of complete wiring of dozer |
| 42 | Replacement/Re-fitment of universal joint |
| 43 | Replacement of both floating seal of final drive (either side) |
| 44 | Replacement of radiator/radiator core |
| 45 | Supply and fitting bulb and glass |
| 46 | Replacement of one set (1 set=4roller) track roller of BEML make Bulldozer BD-155 |
| 47 | Replacement of one set (1 set=7 roller) trackroller of BEML make Bulldozer BD-155 |
| 48 | Face Hardening of BEML Make Dozer’s Blades |
| 49 | Overhauling of Starter Motor, BEML Make |
| 50 | Complete Servicing of Steering and Brake System of BEML Bulldozer BD-155 |
| 51 | Changing First pinion of final drive of BEML bulldozer BD-155 |
| 52 | complete overhauling of cylinder head |
| 53 | Demounting & mounting of dozer engine |
| 54 | Overhauling of Turbocharger, BEML Make. |
| 55 | Overhauling of Torque Converter, BEML Make |
| 56 | Service charge of complete overhauling of Engine(BS6D170-1) |
| 57 | complete overhauling of transmission Assy of BEML Make Dozer dozer Transmission assembly of BEML make Bulldozer (model BD-155). |
| 58 | Overhauling of Fuel Injection Pump, BEML Make. |
| 59 | Demounting &mounting of transmission assembly /torque converter from dozer. |
| 60 | Overhauling/breakdown of final drive assembly of BEML make BD-155 Bulldozer both side |
| 61 | Deputation of experts ex Beml service engineers for maintenance of Dozer model no BD-155.( One Job = 1 day) |
| 62 | Machining work of crank shaft/engine block |