Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #52189298

Tender For Provision Of Improvement & Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Development Works For Cob Ziphu Of Ar Bn

Issued by Statutory Bodies & Commissions/Committees · phek, Nagaland
Tender Value
6.37 Crore
Estimated cost
Bid Submission
27 Nov 2025
0 days left
EMD
12.74 Lakhs
Bank guarantee accepted
Document Fee
1500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
phek → Nagaland
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Provision Of Improvement & Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Development Works For Cob Ziphu Of Ar Bn

BOQ

Name of Work : Provision of Improvement & Enhancement of old existing temporary shelters and ancillaries including infrastructural development works for COB Ziphu of AR Bn
Sl. No. Item Description
1SCHEDULE ‘A’ PART-I ( BUILDINGWORKS )
2Supply & Constr of Pre fabricated fast erectable modularPUF shelter ( 18.30m x 7.60 m size) for 20 men SM Bk all as per GeM specification and drawings including provn of plinth /Fdn with Vitrified Tiles flooring , plinth protection, False ceiling, Electrification, Furniture and as directed by Engineer-in-charge. Drawing No. DGAR/COB/01 (Sheet No. 1/10 to 10/10)
3Supply & Constr of Pre fabricated fast erectable modularPUF shelter ( 10.64m x 6.10 m size) forSingle Officer/JCOs accnall as per GeM specification and drawings including provn of plinth /Fdn with Vitrified Tiles flooring , plinth protection, False ceiling, Electrification, Furniture, water supply & Sanitary fittings, MS water tank Staging with 500 Ltrs capacity PVC water storage tank and as directed by Engineer-in-charge. Drawing No. DGAR/COB/03 (Sheet No. 1/10 to 10/10)
4Supply & Constr of Pre fabricated fast erectable modularPUF shelter ( 18.30m x 6.10 m size) forKoteall as per GeM specification and drawings including provn of plinth /Fdn with PCCflooring , plinth protection, Electrification, Furniture and as directed by Engineer-in-charge. Drawing No. DGAR/COB/04 (Sheet No. 1/9 to 9/9)
5Supply & Constr of Pre fabricated fast erectable modularPUF shelter ( 18.30m x 6.10 m size) forStore all as per GeM specification and drawings including provn of plinth /Fdn with PCCflooring , plinth protection, Electrification, Furniture and as directed by Engineer-in-charge. Drawing No. DGAR/COB/04 (Sheet No. 1/9 to 9/9)
6Supply & Constr of Pre fabricated fast erectable modularPUF shelter ( 18.30m x 7.60 m size) for Signal Centre/MI Room/Coy Office all as per GeM specification and drawings including provn of plinth /Fdn with Vitrified Tiles flooring , plinth protection, False ceiling, Electrificationand as directed by Engineer-in-charge. Drawing No. DGAR/COB/01 (Sheet No. 1/10 to 10/10)
7Supply & Constr of Pre fabricated fast erectable modularPUF shelter ( 20.88m x 9.10 m size) forCH/DH all as per GeM specification and drawings including provn of plinth /Fdn with Vitrified Tiles flooring , plinth protection, False ceiling to Dining Hall, Electrification, Furniture, water supply fittings , MS water tank Staging with 1000 Ltrs capacity PVC water storage tank and as directed by Engineer-in-charge. Drawing No. DGAR/COB/02 (Sheet No. 1/11 to 11/11)
8Supply & Constrof Prefabricated Sentry Post /Watch tower including plinth /foundation PCC flooring (Tech Specications & drawings as specified in NIT). Drawing No DGAR/ENGR/COB/115sheet no 01/4 to 4/4 attached in tender.
9Constr of (7.20m x 2.20 m size ) 6 men Toilet/BathBlockall as per specification anddrawingsincluding provn of plinth /Fdn with Vitrified Tiles flooring & plinth protection, Electrifications, water supply & Sanitary fittings,MS water Tank Stand with PVC water Tank 1000 ltrs capacity, One Toilet Seatto be EWC Seat and as directed by Engineer-in-charge. Drawing No. DGAR/Engr/COB/114 (Sheet No. 1/3 to 3/3)
10SCHEDULE ‘A’ PART-II ( SECURITY FENCING ) 580.00 mtrs ( Drg No. STD/Engr/COB/116sheet No. 1/2 - 2/2)
11Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
12Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal sizederived from natural sources)
13Centering and shuttering including strutting, propping etc. and removalof form for Columns, Pillars, Piers, Abutments, Posts and Struts
14Providing andfixing at site Angle Iron Post & Struts of 65x65x6mmsize including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia etc completeas per drawings
15Fencing with Welded steel wire fabric fencingwith posts of specified materials and standard design of size 75mm x75 mmusing 4 mm dia GI wire .
16Extra for providing and fixing MS flat iron 40x6 mm size Horizontally & Vertically for supporting of wire fabric/ chain link fencing .
17Painting with aluminium paint of approved brand and manufactutre to give an even & smooth shade Two or more coats on new work onangle irom post , Flat iron & struts
18Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron \"Y\" shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge
19Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
20Painting with aluminium paint of approved brand and manufactutre to give an even & smooth shade Two or more coats on new work on Chain link fencing/ Fabric
21SCHEDULE ‘A’ PART-III ( PAVERS BLOCK ROAD ) 515.00 mtrs
22Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
23Supplying ,Laying, spreading and compacting stone aggregate of 90 mm to 45 mm size of WMB with moroum as binding materials including 13.2 mm size stone aggregate , watering and consolidating with power roller of 8 to 10 tonne capacity
24Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal sizederived from natural sources)
25Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.
26SCHEDULE ‘A’ PART-IV ( RETAINING WALL ) 120.00 mtr
27Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
28Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. with mix of1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources)
29Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
30Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. Cement mortar 1:6 (1 cement : 6 coarse sand)
31Providing and laying cement concrete in Coping on retaining walls1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
32Raised and cut pointing on stone work with cement mortar 1:2 (1 cement :2 fine sand):
33Supplying and stacking at sitestone aggregate of 20 mm size
34Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 75 mm diameter
35Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. with mix of1:2:4 (1 Cement : 2 coarse sandderived from natural sources : 4 graded stone aggregate 20 mm nominal sizederived from natural sources)
36Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering with mix1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal sizederived from natural sources)
37SCHEDULE ‘A’ PART-V ( STORM DRAINAGE ) 110.00 mtr
38Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:All kinds of soil
39Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
40Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering with mix1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal sizederived from natural sources)
41Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. with mix of1:2:4 (1 Cement : 2 coarse sandderived from natural sources : 4 graded stone aggregate 20 mm nominal sizederived from natural sources)
42Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
43providing 12 mm thick Cement plaster of mix 1:4 ( 1 cement :4 fine sand)
44SCHEDULE ‘A’ PART-VI ( FOOT PATH WITH CHEQUERED TILES ) 110.00 mts
45Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:All kinds of soil
46Supply and laying stone aggregate of 90 to 45 mm size of WBM with moroum as binding materials including 13.2 mm size stone screening sorrting , watering, spreading, compacting stone aggregate in uniform thickness and consolidation with power road roller of 8 to 10 tonne capacity with proper gradient and camber
47Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. with mix of1:2:4 (1 Cement : 2 coarse sandderived from natural sources : 4 graded stone aggregate 20 mm nominal sizederived from natural sources)
48Centering and shuttering including strutting, propping etc. and removalof form for sides of concrete etc
49Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Dark shade pigment using ordinary cement
50SCHEDULE ‘A’ PART-VII(SEWAGE DISPOSAL)
51Construction of 50 Users SEPTIC TANK all as per standard specification and drawing No. DGAR/Engr/355 Sheet No. 1/1
52Construction of 20 UsersSEPTIC TANKall as per standard specification and drawing No. DGAR/Engr/355 Sheet No. 1/1
53Construction ofSOAK PITall as per standard specification and drawing No. DGAR/Engr/355 Sheet No. 1/1
54Construction ofMANHOLEall as per standard specification and drawing No. DGAR/Engr/355 Sheet No. 1/1
55Provision of 110 mm dia PVC (SWR) sewage pipe line from Toilet to Manholes, Septic Tank & Soak Pit including PCC 1:3:6 haunching
56SCHEDULE ‘A’ PART-VIII(SITE DEVELOPMENT / EARTH WORK)
57Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil

AI Tender Summary

OUR REF NO 52189298
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 6.37 Crore
LAST DATE 27-11-2025
Authority
Authority Name Assam Rifles
Work Description Tender For Provision Of Improvement & Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Development Works For Cob Ziphu Of Ar Bn
Basic Detail
Tender No VIII.11014/9223/5 Sect/26 COBs/Engr/2025
Bidding Type Tender
Location
City phek
State Nagaland
Key Dates
Publish Date 06 Nov 2025
Submission Date 27 Nov 2025
Open Date 28 Nov 2025
Finance
Tender Value 6.37 Crore
Tender Fee 1500
EMD 12.74 Lakhs
Exemption Not Available
Document List
1a81be2b-3ddb-48d1-afc3-751e41887088.html
BOQ_929570.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 06, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 27, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 28, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

1a81be2b-3ddb-48d1-afc3-751e41887088.html

xls

BOQ_929570.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender