}

Tender For Installation Of New Mgps At Dhh Phulbani Converted To Mtch (Icu, Ot, Surgery, Casualty Ot, Surgery Hdu), phulbani-Odisha

Tender Notice

52183888
Tender For Installation Of New Mgps At Dhh Phulbani Converted To Mtch (Icu, Ot, Surgery, Casualty Ot, Surgery Hdu)
Tender
Indian
Odisha
Phulbani
18-11-2025

Tender Details

Tender For Installation Of New Mgps At Dhh Phulbani Converted To Mtch (Icu, Ot, Surgery, Casualty Ot, Surgery Hdu)- 1 GAS PIPE LINE 2 OXYGEN SYSTEM 3 Semi-automatic Oxygen Controls control panel(flow 1200 lpm) 4 Semi- Automatic pneumatically operated oxygen control panel. Visual indication of the manifold is provided by 3 guages within control panel, Indicating Pressure of the right & Left hand bank and the supply pressure from control panel to distribution system with sensing faciliteies to provide visual signals na other anciliary services such as heaters. Pannel should be fitted with audio alarm indication for changeover of empty cylinder. The entire manifold will be hydraulically tested at 130 Kg/Cm2 pressure, duly degreased foroxygen Service, and supplied in sealed cover, ready for assembly at site etc. complete as required.(Make:- MEDI UNITIED)(Note : Excluding Supply of cylinder). 5 Oxygen Manifold - 2 banks x 6 cylinders. 6 Oxygen manifold of Size (6 working + 6 Standby) for Indian type bulk cylinders, high pressure copper annealed tail pipes complete with middle frame, chains for individual bulk oxygen cylinder, NRVs and 32 nos. pig tail pipes. it should be suitable to withstand a working pressure of 145 kg/cm2 and should be tested at 300 kg/cm2. etc. complete as required.(Make:-MEDI UNITIED) 7 Oxygen Manifold (Emergency) - 2 banksx 2 cylinder 8 Oxygen manifold of Size (2 working + 2 Standby) for Indian type bulk cylinders, high pressure copper annealed tail pipes complete with middle frame, chains for individual bulk oxygen cylinder, NRVs and 12 nos. pig tail pipes. it should be suitable to withstand a working pressure of 130 kg/cm2 and should be tested at 300 kg/cm2. etc. complete as required.(Make:-MEDI UNITIED) 9 Gas Outlets with probes - Oxygen 10 Oxygen Outlets as Per standards, Terminal units shall be capable of single-handed insertion and removal of the medical gas probe. The wall mounted first fix assembly shall consist of brass pipeline termination block with copper stub pipe secured between a back plate and a gas specific plate to allow limited radial movement of the copper stub to align with the pipeline. The gas specific plate shall be permanently fixed to the backplate etc. complete as required.(Make:-MEDI UNITIED) 11 Oxygen Flow meters 12 Oxygen flowmeter complete with humidifier bottle, The flow meter must be constructed with chromium plated brass body, extremely robust, to take care of the day to day usage demand. Flow meter cartridge type knob : easy to maintain, offers optimum adjustment quality and superior designing and engineering to provide high level of accuracy, with no significant affect from restrictions caused by down-stream equipments. The flow meters should be 0-15 LPM range for oxygen. etc complete as required. (Make:-AZAD/AQUATIC/SULEKHA) 13 NITROUS OXIDE SYSTEM 14 Semi - automatic Nitrous Oxide Controls(500lpm) 15 Semi- Automatic pneumatically operated N2O control panel. With heater, The entire manifold will behydraulically tested at 250 Kg/Cm2 pressure, duly degreased , etc complete as required. (Make:- MEDI UNITIED) 16 N2O Manifold - 2 banks X 2 Cylinder 17 (2working + 2 Standby) size of N2O manifold complete with middle frame, chains, NRVs 12 nos. pig tail pipes, Manifold should have high pressure copper annealed tail pipes with one end having brass bull nose suitable for Nitrous Oxide cylinders and other end suitable for Manifold non- return Valves. Each manifold will have one terminal header and a NPT connection for the Automatic Control Panel. etc. complete as required. (Make:-MEDI UNITIED) 18 Nitrous oxide manifold - Emergency 1 Banks X 1 Cylinders 19 (1 working + 1 Standby) size of N2O manifold complete with middle frame, chains, NRVs 6 nos. pig tail pipes, Manifold should have high pressure copper annealed tail pipes with one end having brass bull nose suitable for Nitrous Oxide cylinders and other end suitable for Manifold non- return Valves. Each manifold will have one terminal header and a NPT connection for the Automatic Control Panel. etc. complete as required.(Make:-AZAD/AQUATIC/SULEKHA) 20 Gas Outlets with probes - Nitrous Oxide 21 Nitrous Oxide outlets as Per standards, Terminal units shall be capable of single-handed insertion and removal of the medical gas probe. The wall mounted first fix assembly shall consist of brass pipeline termination block with copper stub pipe secured between a back plate and a gas specific plate to allow limited radial movement of the copper stub to align with the pipeline. The gas specific plate shall be permanently fixed to the backplate, etc. complete as required.(Make:-MEDI UNITIED) 22 Duplex Compressed Air System 23 Compressed air system complete with oil free air compressor (1 nos. x 28.8cfm) Model - BFT100C-10-** or similer type air compressors equipped and fittings thereof. etc. complete as required.(MAKE:-MEDI UNITIED 24 Curtis/Hitachi) 25 Compressed M.Air- 4 Bar outlets as Per standards , Terminal units shall be capable of single-handed insertion and removal of the medical gas probe. The wall mounted first fix assembly shall consist of brass pipeline termination block with copper stub pipe secured between a back plate and a gas specific plate to allow limited radial movement of the copper stub to align with the pipeline. The gas specific plate shall be permanently fixed to the backplate, etc. complete as required.(Make:-MEDI UNITIED) 26 Duplex Vacuum System , -450 Hg, 27 DUPLEX Vacuum Central system complete with rotary vane Vaccum pumps (2 Nos X 7.5 KW) Model - BVLS100DE each pump should be reciproting base frame mounted with motor and 1 No 1000 ltrs. Capacity vacuum reservoir, The Vaccum System should include three medical Vaccum pumps each with electrical motors, silencers, bacteria filters They should be capable of removing more than 99.9% of oil and smoke particles from the exhaust. etc. complete as required.(MAKE: ANEST IWATA/IR) 28 Outlets with probes - Vacuum 29 Vacuum outlets as per standards, Terminal units shall be capable of single-handed insertion and removal of the medical gas probe. The wall mounted first fix assembly shall consist of brass pipeline termination block with copper stub pipe secured between a back plate and a gas specific plate to allow limited radial movement of the copper stub to align with the pipeline. The gas specific plate shall be permanently fixed to the backplate, etc. complete as required..(Make:-MEDI UNITIED) 30 Ward Vacuum with regulator and jar (600 Ml) .(MakeMEDI UNITIED) 31 Theater Suction jars with regulator (theatres,2*2000 ml) .(Make:-MEDI UNITIED) 32 Copper pipe: 33 Medical Grade copper pipe with required copper fittings, All pipes shall be drawn half hard temp., solid drawn, seamless, phosphorous deoxidised, non-arsenic and degreased copper pipe conforming to EN BS: 13348:2008/ASTM B819 standard ,EN 1057:1996 (originally BS 2871-1971 Part 1 (Table X) and chemical composition as per BS-6017 of 1981 table 2, The supplies of copper pipe would be accompanied with manufacturers test certificate for the physical properties of copper pipes and their Chemical composition. The supply of pipes be further substantiated with inspection certificate from the third party like SGS/Lloyds Register. etc. complete as required. (MAKE:-Janya Extrusion/Mandev tube/Rajco Metals) 34 Zonal Valve Service ( Valves with Box)(Make:-MEDI UNITIED 35 2gas+1Vac 36 Isolation Valve service (Make: Matrix/ Zoloto/ Paxx) 37 12 mm dia 38 15 mm dia 39 28 mm dia 40 42 mm dia 41 Area Alarm service ( Digital) (Make:-MEDI UNITIED) 42 1 Gas ( 1 O2 ) 43 3 Gas ( 1 O2 + 1 Vac + 1 MA4) 44 Low pressure Antistatic Hose 45 Bed Head Panels (Size - 1000 X 300 X 110 mm) (Make:-MEDI UNITIED) 46 Pure extruded aluminium made with powder coat finish, having 5 Nos gas outlets, 2 Nos electric panels having 4 nos of 6/16 Amp switches and 4 Nos of electrical sockets ( 6/16 Amp) Make - Legrand or similer type, Provision for Nurse call display, SS IV pole with holder and utility basket etc. 47 Kit conversion for Nitrous Oxide 48 Kit conversion for Oxygen 49 Combined electric control panel for Air compressor and Vacuum pumps 50 Automation Electrical control panel is made of MS Sheet having thickness 16 SWG and should be epoxy powder coated. The electrical control panel would be equipped with auto manual selector, 4 nos. Star-Delta starters each compatible to 10 HP motors for compressors and 4 nos. DOL starters compatible to 20 HP each electric motor for Vacuum pumpsThe electrical control panel would be further equipped for triplex/cascade system for vacuum pumps & Air Compressors and also be equipped with safety equipment for the air compressors.(MAKE:- MEDI UNITIED) 51 Elecctrical Cabling in Gas Plant Room & Other Misselenous Work 52 Installation of piping shall be carried out with utmost cleanliness. Only pipes, fittings and valves which have been de-greased and fittings brought in polythene sealed bags shall be used at site. Pipe fixing clamps shall be of nonferrous or non-deteriorating plastic suitable for the diameter of thepipe. All joints shall be made of copper to copper and brazed by silver brazing filler materialwithout use of any flux. All brazing shall be done by using a brazing rod CP 104 (5% silvercopper phosphorous brazing alloy) and copper-to-brass or gunmetal shall only be joints using brazing rod AG203 (43% Silver-copper-zinc-brazing alloy) manufactured to EN-1044.Inert gas welding technique should be used by oxygen free Nitrogen gas inside copper pipes whilebrazing to avoid carbon deposition.Adequate supports shall be provided while layingpipelines to ensure that the pipes do not sag. Suitable sleeves shall be provided wherever pipes cross through walls / slabs. All pipe clamps shall benon-reactive to copper.After erection, the pipes will be flushed and thenpressure tested with dry air at a pressure equal to 1.5 times of the working pressure or 150 psig, whichever is higher for a period of not less than 24 hours.All the piping system shall be tested in the presence of the site-engineer or his authorized representative.PAINTINGAll exposed pipes should be painted with two coats of synthetic enamel paint and colour codification should be as per IS : 2379 of 1963. 53 Ms Support Structure with fabrication For Medical Gas Pipelines (Oxygen , Vaccum , Surgical Air , Medical Air , CO2 , Nitrus Oxide) from central medical gas plant to main building & riser in overhead system which will be connect from gas plant to main building . The details are given below.1. Minimum height of overhead structure 17/20 Ft 2. Weidgth 1/1.5 Mtrs3. Structural Strength as per the civil drawing , as per the distance according to civil drawing .4.Pipeline Support system which will be covered by perforated GI tray . (Structural steel work riveted, bolted or welded in built upsections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per direction of EIC) Please Enable Macros to View BoQ information

Key Value

Document Fees
INR 10000 /-
Tender Value
INR 94.66 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail