Tender For Permanent Restoration Work Under Package No. Rj-28-07/Permanent Restoration/2025-26 - Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.Ordinary soil Upto 3 m depth A/R to Bhawarki 3 A/R to Jeewad 4 A/R to Ramjanipura 5 Piplai to Bad Mohanpur 6 NH 11B to Bhotai 7 A/R to Palasod 8 A/R to Gurjar Thikariya 9 Kherli Bichhochh to Bairada Binjari 10 A/R to Nananwas 11 A/R to Surgarh to Ladpura 12 A/R to Gari Gopalpura 13 Piplai to Badi Jhopari 14 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 15 SH-24 to Khurra mataji roadvia phulwaraup to district border 16 A/R to Naroli Chor 17 A/R to Sumel 18 A/R to Goth 19 A/R to Sancholi 20 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104P.C.C grade M 10Nominal mix 1:3:6 21 A/R to Bhawarki 22 A/R to Jeewad 23 A/R to Ramjanipura 24 Piplai to Bad Mohanpur 25 NH 11B to Bhotai 26 A/R to Palasod 27 A/R to Gurjar Thikariya 28 Kherli Bichhochh to Bairada Binjari 29 A/R to Nananwas 30 A/R to Surgarh to Ladpura 31 A/R to Gari Gopalpura 32 Piplai to Badi Jhopari 33 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 34 SH-24 to Khurra mataji roadvia phulwaraup to district border 35 A/R to Naroli Chor 36 A/R to Sumel 37 A/R to Goth 38 A/R to Sancholi 39 Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104. Random Rubble MasonryIn 1:4 cement mortar 40 A/R to Bhawarki 41 A/R to Jeewad 42 A/R to Ramjanipura 43 Piplai to Bad Mohanpur 44 NH 11B to Bhotai 45 A/R to Palasod 46 A/R to Gurjar Thikariya 47 Kherli Bichhochh to Bairada Binjari 48 A/R to Nananwas 49 A/R to Surgarh to Ladpura 50 A/R to Gari Gopalpura 51 Piplai to Badi Jhopari 52 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 53 SH-24 to Khurra mataji roadvia phulwaraup to district border 54 A/R to Naroli Chor 55 A/R to Sumel 56 A/R to Goth 57 A/R to Sancholi 58 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row, Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 1000 MM dia 59 A/R to Bhawarki 60 A/R to Ramjanipura 61 Piplai to Bad Mohanpur 62 NH 11B to Bhotai 63 A/R to Palasod 64 A/R to Gurjar Thikariya 65 Kherli Bichhochh to Bairada Binjari 66 A/R to Nananwas 67 A/R to Surgarh to Ladpura 68 A/R to Gari Gopalpura 69 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 70 SH-24 to Khurra mataji roadvia phulwaraup to district border 71 A/R to Naroli Chor 72 A/R to Sumel 73 A/R to Goth 74 A/R to Sancholi 75 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row, Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 300 MM dia 76 A/R to Gari Gopalpura 77 Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503Boulder/Quarry stone weighing not less than 40 kg (specfic gravity not less than 2.65) 78 A/R to Bhawarki 79 A/R to Ramjanipura 80 Piplai to Bad Mohanpur 81 A/R to Gurjar Thikariya 82 Kherli Bichhochh to Bairada Binjari 83 A/R to Gari Gopalpura 84 Plastering with cement mortar (1:4), 20 mm thick on Stone work. 85 A/R to Bhawarki 86 A/R to Jeewad 87 A/R to Ramjanipura 88 Piplai to Bad Mohanpur 89 NH 11B to Bhotai 90 A/R to Palasod 91 A/R to Gurjar Thikariya 92 Kherli Bichhochh to Bairada Binjari 93 A/R to Nananwas 94 A/R to Surgarh to Ladpura 95 A/R to Gari Gopalpura 96 Piplai to Badi Jhopari 97 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 98 SH-24 to Khurra mataji roadvia phulwaraup to district border 99 A/R to Naroli Chor 100 A/R to Sumel 101 A/R to Goth 102 A/R to Sancholi 103 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.675 mm thick 104 A/R to Bhawarki 105 A/R to Jeewad 106 A/R to Ramjanipura 107 Piplai to Bad Mohanpur 108 NH 11B to Bhotai 109 A/R to Palasod 110 A/R to Gurjar Thikariya 111 Kherli Bichhochh to Bairada Binjari 112 A/R to Nananwas 113 A/R to Surgarh to Ladpura 114 A/R to Gari Gopalpura 115 Piplai to Badi Jhopari 116 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 117 SH-24 to Khurra mataji roadvia phulwaraup to district border 118 A/R to Naroli Chor 119 A/R to Sumel 120 A/R to Goth 121 A/R to Sancholi 122 Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 123 A/R to Bhawarki 124 A/R to Ramjanipura 125 Piplai to Bad Mohanpur 126 NH 11B to Bhotai 127 A/R to Palasod 128 A/R to Gurjar Thikariya 129 Kherli Bichhochh to Bairada Binjari 130 A/R to Nananwas 131 A/R to Surgarh to Ladpura 132 A/R to Gari Gopalpura 133 Piplai to Badi Jhopari 134 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 135 SH-24 to Khurra mataji roadvia phulwaraup to district border 136 A/R to Naroli Chor 137 A/R to Sumel 138 A/R to Goth 139 A/R to Sancholi 140 Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.For Grading-III Material 141 A/R to Bhawarki 142 A/R to Ramjanipura 143 Piplai to Bad Mohanpur 144 NH 11B to Bhotai 145 A/R to Palasod 146 A/R to Gurjar Thikariya 147 Kherli Bichhochh to Bairada Binjari 148 A/R to Nananwas 149 A/R to Surgarh to Ladpura 150 A/R to Gari Gopalpura 151 Piplai to Badi Jhopari 152 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 153 SH-24 to Khurra mataji roadvia phulwaraup to district border 154 A/R to Naroli Chor 155 A/R to Sumel 156 A/R to Goth 157 A/R to Sancholi 158 Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.By Mechanical Means with all lead (only 1 KM) 159 A/R to Bhawarki 160 Piplai to Bad Mohanpur 161 A/R to Palasod 162 A/R to Gurjar Thikariya 163 Kherli Bichhochh to Bairada Binjari 164 A/R to Nananwas 165 A/R to Surgarh to Ladpura 166 SH-24 to Khurra mataji roadvia phulwaraup to district border 167 Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. 168 A/R to Bhawarki 169 A/R to Jeewad 170 A/R to Ramjanipura 171 Piplai to Bad Mohanpur 172 NH 11B to Bhotai 173 A/R to Palasod 174 A/R to Gurjar Thikariya 175 Kherli Bichhochh to Bairada Binjari 176 A/R to Nananwas 177 A/R to Surgarh to Ladpura 178 A/R to Gari Gopalpura 179 Piplai to Badi Jhopari 180 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 181 SH-24 to Khurra mataji roadvia phulwaraup to district border 182 A/R to Naroli Chor 183 A/R to Sumel 184 A/R to Goth 185 A/R to Sancholi 186 Construction ofun-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 150 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawingand MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately) 187 A/R to Bhawarki 188 A/R to Jeewad 189 A/R to Ramjanipura 190 Piplai to Bad Mohanpur 191 NH 11B to Bhotai 192 A/R to Palasod 193 A/R to Gurjar Thikariya 194 Kherli Bichhochh to Bairada Binjari 195 A/R to Nananwas 196 A/R to Surgarh to Ladpura 197 A/R to Gari Gopalpura 198 Piplai to Badi Jhopari 199 Batoda Barnala Kherli BamanwasMorasagar Raisna Garhkeda Nadoti Road MDR-247 200 SH-24 to Khurra mataji roadvia phulwaraup to district border 201 A/R to Naroli Chor 202 A/R to Sumel 203 A/R to Goth 204 A/R to Sancholi