|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in- harge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(b) Thick |
| 2 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.(c) Hard soil mixed with Kankar / boulders, Morrum |
| 3 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm. |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm. |
| 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using.(ii)Tor or ribbed bars (IS :1786 |
| 6 | Side shuttering including propping etc. complete (to achieve finish F 2 for : ( c) Retaining wall, counterfort, abutment, wing walls up stream or downstreamslope facings of dams and open faces of construction joints etc |
| 7 | Dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. |
| 8 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.(b) In cement mortar |
| 9 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. (B) Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 10 | Supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete.(b) Plastic Bag |
| 11 | Labour charges for making coffer dam/ring bund (under flowing / stagnate water pool) by loading transporting earth filled cement bags dropping at required locations in water including lead up to 3 km and lift up to 8 meter from NSL complete (excluding cost of earth filled cement bags). |
| 12 | Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de watering wherever required and all applicable taxes and levies etc. complete in all respect Earth / Soil |
| 13 | Labour charges including watering for puddle work to obtain minimum dry density as 90 % of M.D.D |
| 14 | (a) Drilling holes of 35 mm diameter for anchor rods. i) Upto 1.50 m. depth. |
| 15 | (b) Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete. |
| 16 | ( c) Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. |
| 17 | ProvidingandLayinginpositionofCementconcreteNominalmix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto 20mm |
| 18 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materialsof thickness: 20mm |
| 19 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-wateringwherever required. |
| 20 | Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio.In Cement sand mortar 1:3 |
| 21 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.(d)In cement sand mortar 1:6 Masonry work in superstructure |
| 22 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm |