Tender for Joynals House To Pathagore Pull Via Uttarpara Within Memari-Ii Block, Length-1.48 Km--1.01 Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD 1.02 Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site,spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works) 1.03 Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site,spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works) 1.04 Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Borrow pit /pre work post work measurement) 1.05 Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Borrow pit /pre work post work measurement) 1.06 B. By Mix in Place Method : Construction of granular sub-base by providing graded material,mixing by mix in place method with Rotavator at OMC,spreading in uniform layers with Motor grader on prepared surface in proper grade and camber,compacting with vibratory roller to achieve the desired density,including lighting, guarding,barricading, including cost of all materials,machinerytools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision) 1.07 Water Bound Macadam Base Course Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing,rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision) 1.07 Water Bound Macadam Base Course Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing,rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision) 1.09 Interlocking Concrete Block Pavement - 80 mm thick Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm over 30mm thick bedding sand and joint filler conforming to table 1500.6 as per drawings and including cost of Curing, Barricading, Lighting, Guarding complete as per Technical Specification vide Clause 1504 of Specification for Rural Roads (1st Revision), MORD. Construction wing will add cost of (I) complete rate of interlocking blocks & edge blocks vide item no. 6.6 for I.00 sqm multiplying by 80/150 +(ii)cost of sand for 0.03 cum for arriving complete rate per Sqm. Construction wing will add cost of (I) complete rate of interlocking blocks & edge blocks vide item no. 6.6 for I.00 sqm multiplying by 60/150 + (ii) Cost of sand @ 0.03 cum for arriving