Tender For Installation And Implementation Of It Enabled Day And Night Illuminated Led Acrylic Graphical Stuffs And Special Effects Including Design, Technological Beautification And Other Peripheral Development At Municipality Binka Nac Office, With The Municipality Theme, On Engineering, Procurement & Construction (Epc) Mode Contract. Proposed Site: 60Ft X 15Ft , Part 7: Installation And Implementation Of It Enabled Day And Night Illuminated Led Acrylic Graphical Stuffs And Special Effects Including Design, Technological Beautification And Other Peripheral Development At Municipality Binka Nac Office, With The Municipality Theme, On Engineering, Procurement & Construction (Epc) Mode Contract. Proposed Site: 60Ft X 15Ft , Technical Specifications Electrical Ss Pole Special Designed Fancy Garden Lights With Body And Head Lightings As Required Of Total Heights Of Minimum 2.8 Feet Height. , Ss304 Pole Special Designed Laser Carved Fancy Street Lights With Full Body And Head Lightings As Required Of Total Height Minimum 12 Ft. ? The Pole Will Be Of Ss304 Of 2.5 Dia. And 10Ft Height. Out Of Which 8 Will Be The Body With Day And Night Illuminated. ? The Body Of The Pole Out Of Which 8 Feet Will Be Made Up Of 3Mm Acrylic Sheet (Of Required Colour And Design) With It Enabled Acp Router/ Laser Carved (Of Required Colour And Design) Would Be Based Over 1X 1 Square Pipe Of Ss304 For Border Frames Of Size- 8X8 And Of 8Ft Height. 8 Nos. Of Led Rod Of 3.5 Height Of 22 Watts Each To Be Installed Inside It For Illumination (Of Required Colour). ? At The Top, A Head Light With Aluminum Casting Of Minimum Of 30 Height Will Be Placed. A Driver Based Led Of 50 Watt Of Warm White Color Will Be Used For The Top Illumination. ? The Bottom End Part Of The Pole Of Fancy Light Post Will Be Covered With Designed Multi-Layer Frp Base (With Pot-Like Design) Of Dimension - 10 Base Dia. And 4 Top Dia., Having Golden Colour. Additionally, 2Nos. Of Multi-Layer Frp Designed Rings Of 3 Height & 4 Dia., Will Be Provided Over The Base Pole, For Better Look. ? The Entire Pole Will Be Supported With Required Civil And Mechanical Foundation As Required. Underground Foundation Supported With A 2 Depth X 1 Length X 1 Breadth Reinforced Cement Concrete Civil Foundation And Plinth As Required Inside The Ground. Underground Base Will Be Made By Digging 2Ft Underneath, And Filling It With Concrete And Securing The Concrete With A Baseplate. The Frp Base Design Will Be Joined With The Base Plate With Nut Bolts. ? Base Plate At Bottom Would Be Of 10 Mm Thickness X 10 X 10 Size Ms Plate. ? Nuts Would Be Of Minimum 8/10 Mm * 4 Numbers And The Required Height Would Be Of 2 Feet As Required. Ring Size Would Be Of 8/10 Mm Rods, With Base Plate Of 8/10 Mm. ? The Foundation Of The Street Pole Is Depending Upon The Available Conditions. ? The Dimensions Mentioned In This Specification Are Tentative Only May Differ A Bit. , Led Tree Of Minimum 10-12 Feet In Height Will Be Installed In The Proposed Site. The Branches Will Be Made Up Of Ms/Gi. Artificial Leaves All Over The Tree Of Desired Colour (Pink) Will Be Supported By Module Led Lights For Illumination. Qty- 1Set. , Led Lighted Butterfly Tree Of Minimum 12 Feet In Height Will Be Installed In The Proposed Site. It Should Have Atleast 15Branches In Total. The Branches Will Be Made Up Of Ms/Gi. The Butterfly On Top Of All Branches Will Be Made Of Ms With Waterproof Paint Over It, To Prevent Rusting. Additionally, All The Butterflies Will Be Illuminated With Led Strip Light. , Underground Wiring -- Underground Wiring Would Be Required By Laying The 1.5 Core 2Mm Wire Through The Pvc Underground Pipes As Required. Pipe And Wire As Needed To Provide Connections To Focused Green Halogen Lights To Trees, Garden Lights, Street Lights And To Connect The Led Digital Electronics, Led Trees, Led Acrylic Trees Etc. The Necessary Mccb, Rccb, Timers, Connectors, Underground Wirings And Other Elaborate Arrangements Will Be Made As Required. , Focusing Lights To Be Made Focus To The Artifacts And Peripheral Trees, As Required. The Peripheral Trees In The Background Will Be Decorated With Special Light Effects, Led Rope Light Of Different Colours Around The Branches, To Give A Heavenly Appearance During The Night. Decorative Lanterns, Balls, Designed Objects Will Be Hanged To The Trees Of Different Colors. , Artifacts Statue Of One Man And Woman Of 6Ft Height(Live-Size) Standing And Lifting A Illuminated Globe Structure It Will Be Made Up Of Multi-Layer Frp With Water Resistant And Partial Heat Proof Properties. , Statue Of Four Women Of Live-Size Wearing The Municipality Uniform - Three Standing And One Sitting. It Will Be Made Up Of Multi-Layer Frp With Water Resistant And Partial Heat Proof Properties. A Set Of 4 Statues. , Civil Garbage Cleaning Of The Whole Site Of 900 Sq. Ft. , Soil Filling In The Whole Site Around 2700 Cu. Ft. , Platform To Hold The Led Tree Of 3Ft X 3Feet X 4Ft (2 Ft Will Remain Underground). The Platform Will Be Made Of Reinforced Cement Concrete And External Brick Work, With Proper Finishing Along With Plastering And Painting As Required. 3 Dpc On Top Of The Platform For Smooth Finish. 10Mm Ms Vertical Rods And 8Mm Ms Horizontal Rods To Be Provided, In The Foundation To Act As Ribbing To Give Extra Support In The Foundation. The Platform Will Be Supported By Pillars As Required. The Tree Will Be Grouted With Reinforced Cement Concrete For A Rigid Stay Within The Platform. , Platform To Hold The Butterfly Tree Of 3.5Ft X 3Feet X 4Ft (2 Ft Will Remain Underground). The Platform Will Be Made Of Reinforced Cement Concrete And External Brick Work, With Proper Finishing Along With Plastering And Painting As Required. 3 Dpc On Top Of The Platform For Smooth Finish. 10Mm Ms Vertical Rods And 8Mm Ms Horizontal Rods To Be Provided, In The Foundation To Act As Ribbing To Give Extra Support In The Foundation. The Platform Will Be Supported By Pillars As Required. The Tree Will Be Grouted With Reinforced Cement Concrete For A Rigid Stay Within The Platform , Cut-Off Wall Will Be Made Of Reinforced Cement Concrete With External Brick Work To Install The Ss Railing To Safeguard The Artefacts Of 150 R. Feet Length X 1Ft Height Above The Ground And 1.5Ft Underground X 10Mm Width. 12Mm Thick Plastering (1:6 Ratio) On 3 Sides Of The Cut Off Wall. 3 Dpc On Top Of The Wall To Place The Ss Railing As Required. The Cut-Off Wall Will Be Supported By 10Mm Ms Vertical Rods And 8Mm Ms Horizontal Rods In The Foundation To Act As Ribbing To Provide Extra Support In The Foundation. The Cut Off Wall Will Be Supported By Pillars As Required. The Ss Railing Will Be Grouted For A Rigid Stay On The Cut Off Wall. , Special 3D Painting Of The Cut-Off Wall With Traditional Designs Of 450 Sq. Ft Approx. , The Entire Location Will Be Surrounded With Ss Railing Raised Over 1Ft Of Cut-Off Wall. Ss Railing Of 2 Dia. Vertical Pipes (Columns) Of 3Ft Height Supported By ¾ Ss Pipes Of 3 Or 4 Rows To Be Placed Horizontally In Between The Vertical Columns. The Main Top Horizontal Pipe Will Be Of 2 Dia. Ss Railing Will Be Installed Over A Running Feet Of 150 Ft. The Master Pillars Of 3 Dia Would Be Placed At 9 Feet Apart And Would Have Designed Ball On Top. The Idlers Vertical Stand Would Be Provided In Order To Provide Support To The Horizontal Pipes. The Horizontal Pipes Would Have The Balls Fitted On It To Provide Extra Lucrative Look. , Horticulture: - Plantation Of Mexican Grass In The Whole Site Of Around 750 Sq. Ft. Prior To That Soil Levelling, Compaction, And Anti Demit Treatment And Plantation Of Grass And Trees. , Plantation Of Other Design Trees And Other Flower Plants As Required In The Whole Site. , Detailed Design And Maintaining The Changes As Required Of The Projects. , Consultation And Engineering Supervision. , Complete Transportation, Handling, Storage And Hence Then Installation As Required. , Contingency And Risk Consideration. , Miscellaneous And Overheads As Required. , Annual Maintenance Contract For 1 Year, Which Does Not Include The Garden Watering And Maintenance Of The Horticulture. Please Enable Macros To View Boq Information