| 1 | Maintenance of the road from Moovanur - Kuruvikarankulam - Peramangalam road Km 0/0-1/0. Earth work Excavation in all soils like HSC Soil with initial lead and lift including all other labour charges asper SS 20 A for 100% compaction by power roller etc., completed Km 0/0-1/0 |
| 2 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Km 0/0-1/0 |
| 3 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be therefor etc.com. Km 0/0-1/0 |
| 4 | Provision for HM stones etc., |
| 5 | Provision for KM stones |
| 6 | Provision for Sign board etc., |
| 7 | Provision for Nme board stones |
| 8 | Maintenance of the road from Puthanampatti to Thenur road Km 0/0-2/0 Earth work Excavation in all soils like HSC Soil with initial lead and lift including all other labour charges asper SS 20 A for 100% compaction by power roller etc., completed Km 0/0-2/5 |
| 9 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 Km 0/ - 2/0 |
| 10 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Km 0/0-2/6 |
| 11 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 12 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 13 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be therefor etc.com. Km 0/0-1/0 |
| 14 | Provision for HM stones etc., |
| 15 | Provision for KM stones |
| 16 | Provision for Sign board etc., |
| 17 | Provision for Nme board stones |
| 18 | Maintenance of the Road from Pulivalam to Kattukulam Road Km 0/0 - 5/1 Earth work Excavation in all soils like HSC Soil with initial lead and lift including all other labour charges asper SS 20 A for 100% compaction by power roller etc., completed Km 0/0-2/5 |
| 19 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 Km 0/ - 5/0 |
| 20 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Km 0/0-5/1 |
| 21 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 22 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 23 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be therefor etc.com. Km 0/0-1/0 |
| 24 | Provision for HM stones etc., |
| 25 | Provision for KM stones |
| 26 | Provision for Sign board etc., |
| 27 | Provision for Name board stones |
| 28 | Maintenance of the Road from Pulivalam to Goldencity road in Km 0/0 - 1/00 Earth work Excavation in all soils like HSC Soil with initial lead and lift including all other labour charges asper SS 20 A for 100% compaction by power roller etc., completed Km 0/0-2/5 |
| 29 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 Km 0/0 - 1/0 |
| 30 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Km 0/0-1/0 |
| 31 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 32 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 33 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be therefor etc.com. Km 0/0-1/0 |
| 34 | Provision for HM stones etc., |
| 35 | Provision for KM stones |
| 36 | Provision for Sign board etc., |
| 37 | Provision for Name board stones |
| 38 | Maintenance of the Road from Jayankondan to Jambunathapuram - Perur road Km 0/0 - 1/304 Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Km 0/0-1/0 |
| 39 | Km 1/0-1/304 |
| 40 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be therefor etc.com. Km 0/0- 0/8 |
| 41 | Km 1/0-1/304 |
| 42 | Provision for HM stones etc., |
| 43 | Provision for KM stones etc., |
| 44 | Provision for Sign board etc., |
| 45 | Provision for Name board stones |
| 46 | Maintenance of the Road from Jayankondan to Rasipuram road Km 0/0 - 1/208 Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Km 0/0-1/0 |
| 47 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Km 0/0-1/0 |
| 48 | Km 1/0-1/208 |
| 49 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be therefor etc.com. Km 0/0- 0/8 |
| 50 | Km 1/0-1/304 |
| 51 | Provision for HM stones etc., |
| 52 | Provision for KM stones etc., |
| 53 | Provision for Sign board etc., |
| 54 | Provision for Name board stones |
| 55 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |