Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #52169907

Tender For Rural Road Maintenance 2025-2026-Thiruverumbur Village Panchayat & Panchayat Union Road Maintenance Works In Palangangudi & Navalpattu Panchayat Thiruverumbur Union Of Tiruchirappalli District For The Year 2025 -26

Issued by Local Bodies · thiruverumbur, Tamil Nadu
Tender Value
11.55 Lakhs
Estimated cost
Bid Submission
07 Nov 2025
0 days left
EMD
14000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
thiruverumbur → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Rural Road Maintenance 2025-2026-Thiruverumbur Village Panchayat & Panchayat Union Road Maintenance works in Palangangudi & Navalpattu Panchayat Thiruverumbur Union of Tiruchirappalli District for the Year 2025 -26

BOQ

Name of Work:- Rural Road Maintenance 2025-2026
Sl. No. Item Description
1Maintenance of Vadakku Theneripatti Road in Palanganangudi Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
2Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
3Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
4Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
5Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
6Providing for HM Stone
7Provision for Name Board Charges
8Maintenance of South Theneripatti to Palanthinnikulam road Palanganangudi Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
9Earth work Excavation in all classes of soils except hardrock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all Labour charges and incidental charges such as shoring, Strutting, providing coffer dams, Bailing out of water as per 20A
10Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
11Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
12Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
13Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
14Providing For HM Stone
15Providing for KM Stone
16Name Board Charges
17Maintenance of Thiruvalluvar Salai 9th main street in Palanganangudi Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
18Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
19Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
20Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
21Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
22Providing for HM Stone
23Name Board Charges
24Maintenance of Pallivasal Street main road Palanganangudi Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
25Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
26Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
27Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
28Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
29Providing for HM Stone
30Provision for Name Board Charges
31Maintenance of TNUDP Main Road in Navalpattu Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
32Earth work Excavation in all classes of soils except hardrock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all Labour charges and incidental charges such as shoring, Strutting, providing coffer dams, Bailing out of water as per 20A
33Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
34Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
35Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
36Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
37Providing for HM Stone
38Providing for KM Stone
39Name Board Charges
40Maintenance of TNUDP Anna Nagar Abdul Kalam Road in Navalpattu Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
41Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
42Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
43Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
44Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
45Providing for HM Stone
46Name Board Charges
47GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 52169907
AUTHORITY Local Bodies
TENDER VALUE 11.55 Lakhs
LAST DATE 07-11-2025
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender For Rural Road Maintenance 2025-2026-Thiruverumbur Village Panchayat & Panchayat Union Road Maintenance works in Palangangudi & Navalpattu Panchayat Thiruverumbur Union of Tiruchirappalli District for the Year 2025 -26
Basic Detail
Tender No A2/3969/2025
Bidding Type Tender
Location
City thiruverumbur
State Tamil Nadu
Key Dates
Publish Date 05 Nov 2025
Submission Date 07 Nov 2025
Open Date 07 Nov 2025
Finance
Tender Value 11.55 Lakhs
Tender Fee Ref. Documents
EMD 14000
Exemption Available
Document List
951b054c-84a5-4259-a053-a5cec7fb7102.html
BOQ_741427.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 05, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 07, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 07, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

951b054c-84a5-4259-a053-a5cec7fb7102.html

xls

BOQ_741427.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders