Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #52169865

Tender For Thiruverumbur Village Panchayat & Panchayat Union Road Maintenance Works In Krishnasamuthiram , Thirunedunkulam, Kuvalakudi, Vengur Panchayat Thiruverumbur Union Of Tiruchirappalli District For The Year 2025 -26

Issued by Local Bodies · thiruverumbur, Tamil Nadu
Tender Value
7.72 Lakhs
Estimated cost
Bid Submission
07 Nov 2025
0 days left
EMD
8000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
thiruverumbur → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Thiruverumbur Village Panchayat & Panchayat Union Road Maintenance Works In Krishnasamuthiram , Thirunedunkulam, Kuvalakudi, Vengur Panchayat Thiruverumbur Union Of Tiruchirappalli District For The Year 2025 -26

BOQ

Name of Work:- Rural Road Maintenance 2025-2026
Sl. No. Item Description
1Maintenance of Vengur Vadakku theru in Vengur Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
2Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
3Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
4Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
5Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
6Providing for HM Stone
7Provision for Name Board Charges
8Maintenance of Veedhivadangam Main Road in Kuvalakudi Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
9Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
10Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
11Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
12Providing for KM Stone
13Name Board Charges
14Maintenance of Tanjore Road Ezhil Nagar VOC Bridge in Krishnasamuthiram Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
15Earth work Excavation in all classes of soils except hardrock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all Labour charges and incidental charges such as shoring, Strutting, providing coffer dams, Bailing out of water as per 20A
16Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 kg of Bitumen for 1 cum of metal mixed in hot mix plant laying at site
17KM 1/0 - 2/0
18Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 kg of Bitumen for 1 cum of metal mixed in hot mix plant laying at site
19KM 1/0 - 2/0
20Providing and laying Tack coat over the BT surface using 3.00Kg of bitumen emulsion RS-1 for 10sqm. for preparatory to another bituminous emulsion for 10sqm. Including cost of bituminus emulsion which will be supplied by the department at section stoers and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of Bituminus emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of Most Specification .
21KM 1/0 - 2/0
22Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
23Providing for HM Stone
24Providing for KM Stone
25Name Board Charges
26Maintenance of Thirunedungulam Sivan Kovil Road in Thirunedungulam Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
27Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
28Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
29Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
30Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
31Providing for HM Stone
32Provision for Name Board Charges
33Maintenance of Kumaresapuram Pillayar Kovil theru in Krishnasamuthiram Panchayat. Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,
34Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
35Providing and laying Tack coat over WMM surface(treated with primer) using 3.00Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
36Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
37Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
38Providing for HM Stone
39Name Board Charges
40GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 52169865
AUTHORITY Local Bodies
TENDER VALUE 7.72 Lakhs
LAST DATE 07-11-2025
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender For Thiruverumbur Village Panchayat & Panchayat Union Road Maintenance Works In Krishnasamuthiram , Thirunedunkulam, Kuvalakudi, Vengur Panchayat Thiruverumbur Union Of Tiruchirappalli District For The Year 2025 -26
Basic Detail
Tender No A2/3969/2025 2
Bidding Type Tender
Location
City thiruverumbur
State Tamil Nadu
Key Dates
Publish Date 05 Nov 2025
Submission Date 07 Nov 2025
Open Date 07 Nov 2025
Finance
Tender Value 7.72 Lakhs
Tender Fee Ref. Documents
EMD 8000
Exemption Available
Document List
4607b5f9-c14a-43b4-bed1-5df78b4f903e.html
BOQ_741435.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 05, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 07, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 07, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

4607b5f9-c14a-43b4-bed1-5df78b4f903e.html

xls

BOQ_741435.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders