| 1 | ITEM No.1: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 2 | B) STBT TO HISAMNGR TO DHANEGAON |
| 3 | ITEM No.2: Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 4 | B) STBT TO HISAMNGR TO DHANEGAON |
| 5 | ITEM No.3: Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete.With fine aggregate ( Crushed sand VSI Grade)A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 6 | B) STBT TO HISAMNGR TO DHANEGAON |
| 7 | ITEM No.4: Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)a)80 mm Metal, By breaking Boulders (Hand broken). A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 8 | B) STBT TO HISAMNGR TO DHANEGAON |
| 9 | ITEM No.5: Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)(a)40 mm Metal, By breaking Boulders (Hand broken). A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 10 | B) STBT TO HISAMNGR TO DHANEGAON |
| 11 | ITEM No.6: Supplying hard murum/ kankar at the road site, including conveying and stacking complete. A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 12 | B) STBT TO HISAMNGR TO DHANEGAON |
| 13 | ITEM No.7: Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 14 | B) STBT TO HISAMNGR TO DHANEGAON |
| 15 | ITEM No.8: Spreading hard murum/ soft murrum/ gravel or kankar for side width complete A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 16 | B) STBT TO HISAMNGR TO DHANEGAON |
| 17 | ITEM No.9: Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Vibratory roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 18 | ITEM No.10: Providing and constructing 50 mm. thickModifiedPenetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 30%crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of spcified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat at the rate of 0.30 Kg Sqm.(on existing bitumen surface) (VG-30 bulk bitumen raes are considered to arrive at rates) A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 19 | ITEM No.11: Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.50kg/10 sqm.VG-30 bulk bitumen A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 20 | ITEM No.12: Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( over BT Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 21 | ITEM No.13: Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials & bitumen of VG-30 gradepreparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 22 | ITEM No.14: Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, plywood/steel formwork, laying/ pumping, A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 23 | B) STBT TO HISAMNGR TO DHANEGAON |
| 24 | ITEM No.15: Providing and fixing …………meter stone as per I.R.C. standard including fixing in standard size ……... block including curing, painting lettering etc. complete.[A] R.C.C. 200 metre stones in C.C. 1:4:8 A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 25 | ITEM No.16: Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc., having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 26 | B) STBT TO HISAMNGR TO DHANEGAON |
| 27 | ITEM No.17: Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed.B) STBT TO HISAMNGR TO DHANEGV |
| 28 | ITEM No.18: Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Manual Means B) STBT TO HISAMNGR TO DHANEGV |
| 29 | ITEM No.19: Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Manual Means B) STBT TO HISAMNGR TO DHANEGV |
| 30 | ITEM No.20: Providing cast in situ / ready mix M10 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer)with SCADA with Natural / VSI standard Artificial Sand, cement 4.05 bags/cumt) B) STBT TO HISAMNGR TO DHANEGV |
| 31 | ITEM No.21: Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. B) STBT TO HISAMNGR TO DHANEGV |
| 32 | ITEM No.22: Supplying soft murum at the road site, including conveying and stacking complete. B) STBT TO HISAMNGR TO DHANEGV |
| 33 | ITEM No.23: Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. B) STBT TO HISAMNGR TO DHANEGV |
| 34 | ITEM No.24: Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. B) STBT TO HISAMNGR TO DHANEGV |
| 35 | : ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges ofRs.141.34/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor. B) STBT TO HISAMNGR TO DHANEGAON |
| 36 | ROYALTY FOR OTHER MINERALS A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 37 | B) STBT TO HISAMNGR TO DHANEGAON |
| 38 | TEST REPORT A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 39 | B) STBT TO HISAMNGR TO DHANEGAON |
| 40 | ADD GST 18 % B) STBT TO HISAMNGR TO DHANEGAON |
| 41 | A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 42 | ADD Lbour insurance 1 % A) BT RENEWAL TO HISAMNGR TO DHANEGAON |
| 43 | B) STBT TO HISAMNGR TO DHANEGAON |