| 1 | Demolition of Brickwork or PCC block built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. |
| 2 | M&L for Brick work with sub class ‘B’ brick, straight or curved as plan exc 6m mean radius built in cement mortar 1:6, complete all as specified and directed. |
| 3 | Taking down cement plaster on brick or stone walls etc, including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and directed. |
| 4 | M&L rendering 15 mm thick on other than fair faces of brick wall of manhole, septic tank and manhole of brick work / concrete surfacesor one side of lathing in cement mortar 1:4 finishing even and smooth without using extra cement, complete all as specified and directed. |
| 5 | M&L Rendering 15mm thick Cement plaster with (1:4) cement mortar to fair faces of brick wall of /manhole /septic tank and wall of brick / concrete surface finished ,even & Smooth (without using extra cement) as directed& using WPC @ 2% by weight of cement, complete all as specified and directed. |
| 6 | Supply only integral water proofing compound, complete all as specified and directed. |
| 7 | M&L forPrepration of newly plastered surfaces of wall and applying two coat of cement base paint over of alkali resistant priming paint,including dark blue colour of pippar/Rcc/brick facia, complete all as specified and directed. |
| 8 | Demolition of cement concrete in ground floors and pavings below or above ground level not exceeding 15cm thicknessand including removing the debris outside the MOD land, complete all as specified and directed. |
| 9 | M&L for 75 mm thick PCC 1:3:6 type C-2 as in plinth protection/floor sub base etc, complete all as specified and directed. |
| 10 | Demolition and breaking up drain pipes (Salt glazed ware, AC or reinforced concrete) set in cement mortar 150mm internal dia of pipe, including removing the debris of demolition/breaking items outside the MOD land, complete all as specified and directed. |
| 11 | All as per item No.10 above but dia of pipe 200mm. |
| 12 | Excavation in trenches n.exc 1.5m wide and not exceeding 1.5m deep and getting out in hard/dense soil, complete all as specified and directed. |
| 13 | M&L for RCC pipes class NP2 of 150mm dia laid and jointed with collars, complete all as specified and directed. |
| 14 | All as per item No.13 above but dia of pipe 200mm. |
| 15 | M&L for PCC 1:4:8 type D2 using 40mm graded stone aggregate as in bed to drain pipe including packing to drain pipe and hunching against sides of pipe for 150mm dia pipes, complete all as specified and directed. |
| 16 | All as per item No.15 here in before but for 200mm dia pipes. |
| 17 | M&L for cutting into existing manholes for connecting new drains making good to pipe and rendering,cutting out existing benchingfor and forming branch channel (1/2 or 3/4section) in cement concrete 1:2:4 type B1 using 20mm graded stone aggregate finished smooth and reforming benching as required for 150mm dia pipes, complete all as specified and directed. |
| 18 | All as per item No.17 here in before but for 200mm dia pipes. |
| 19 | Returning filling including spreading, levelling watering and well ramming in layers n.exc 25cm each in hard/dense soil, complete all as specified and directed. |
| 20 | Removing excavated material soils exc 1.50km but n.exc 5km and depositing where directed out side the MOD land, complete all as specified and directed. |
| 21 | M&L extra for forming fair finishing to drain channel 30cm inner girth in cement concreting using extra cement including forms, mould mitred/stopped end etc, complete all as specified and directed. |
| 22 | S&F in replacement of PVC (SWR) pipes single socketed, in any length with rubber ring joints, step clamps, including all fittings (Any type of \"T\"/tee, bend, Y, Branch piece single/double, couplers, reducers, vent coil, access door, junction single/double, equal/unequal, any type of trap etc), 75mm dia, fixed to walls/floor/trenches etc and height of buildings upto G+5, including taking down, complete all as specified and directed. |
| 23 | All as per item No.22 here in before but for 110mm dia pipes. |
| 24 | S&Fin repairs PVC(SWR) floor trap/Gully Trap 75mm outlet dia plain with grating including jointing with solvent cementinculding cutting outwall /concrete and finishing of surface to match existing surface, complete all as specified and directed. |
| 25 | M&L providing cement concrete (1:2:4) type B-1 using 20mm graded crushed stone aggregate as in bands, copings, bed plates, kerbs, water froughs and the like including weathering slightly rounded or charmfered angles and throating, complete all as specified and directed. |
| 26 | Demoletion of reinforced cement concrete (reinforcement cut as required to facilitate demoletion of any description and in any position not otherwise specifically provided for, complete all as specified and directed. |
| 27 | M&L for RCC(1:2:4), type B1 (using 20 mm graded stone aggregate) Precast cement concrete cover slab for manhole and similar article with plain face, set in cement mortar 1:4, complete all as specified and direceted. |
| 28 | M&L for mild steel TMT bars 8 to 10 mm dia and over cut to length, bent to shape required, including cranking beinding spirally hopping and binding wisth and dincluding mild steel wire (annelid not less than 0.9mm dia) as in stirrups etc, complete all as specified and direceted. |
| 29 | Dismantling floor, path, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, including removing the debris out side the MOD land, complete all as specified and directed. |
| 30 | M&L for providing PCC (1:4:8) type D2 (using 40 mm graded stone aggregate), 75 mm thick as in sub base below pavings, floors, paths etc, complete all as specified and directed. |
| 31 | M&L for Hard core of gauge not exc 63 mm deposited spread and compacted in layers not exc 15 cm, complete all as specified and directed. |
| 32 | M&L chequered cement concrete tiles rubber finish 30cmx 30cmx 25mm thick,set, jointed & pointed in neat cement slurry in floors with grey cement and pigments over & including 20mm thick screed in cement mortar 1:6, complete all as specified and directed. |
| 33 | Providing and laying 60mm thick factory made chamfered edge cement concrete paver block of M-35 grade with approved colour, design&patternasinfootparth,parks, lawns, drive ways or light traffic parking etc., ofrequiredstrength,thickness&size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over and including 50mm thick compacted bed of fine sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratorycompactionbyusingplate vibrator,fillingthejointswithsandand cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand;, complete all as specified and directed. |
| 34 | Removing the manhole cover (CI or RCC) opening any type of manhole rectangular/ circular of depth not exceeding 3m taking out liquid/sludge/solid contents from the manhole with by mechanical pumping / mechanical means only making it fully functional to the entire satisfaction of Engineer-in Charge including removal of sludge /solid contents outside the cantonment area and deposited where directed in borrow pits and covering the borrow pits with 15 cm thick layer of earth / soil and re-fixing the manhole cover to its orginal position, complete all as specified and as directed .Note: 1. Working shall be carried out in foul conditions.2. Sewage/ sludge shall be removed in closed container mounted on vehicle.3. Contractor has to provide all necessary safety gears & protective equipment to the labours engaged.4.Work shall be carried out as and when required.5.Wk will be done only when one supervisor is present on site who will be responsible for ensuring safety of the labours engaged. |
| 35 | Removing the manhole cover/gully trap cover (CI or RCC) opening any type of manhole rectangular/ circular of depth not exceeding 3m taking out liquid/sludge/solid contents from the sewage line of 75/100/150/200/300 mm dia pipe with by mechanical pumping / Mechanical means only making it fully functional to the entire satisfaction of Engineer-in Charge including removal of sludge /solid contents outside the cantonment area and deposited where directed in borrow pits and covering the borrow pits with 15 cm thick layer of earth / soil and re-fixing the manhole cover to its orginal position complete all as specified and as directed.Note : (i) Work shall be carried out in foul condition(ii) Sewage shall be removed in closed container.(iii) Length of pipeline shall be measured from centre to centre of manhole and cleaning of manholes is inclusive in cleaning of pipe line.(iv) Manhole of depth more than 3m shall be measured and paid seperately under relevent item.(iv) Contractor has to provide all necessary safety gears & protective equipment to the labours engaged.(v) Wk will be done only when one supervisor is present on site who will be responsible for ensuring safety of the labours engaged. |
| 36 | Removing the manhole cover (CI or RCC) opening any type ofrectangular/circular and bailing out (dewatering) of water, sewage (sludge), liquid semi liquid and solid suspended contents and floating matters of manhole, septic tank, soakage well, sewage plants/sumps of any size and depth of any size and any capacity by mechanical pumping / mechanical means only by plugging inlets as required, desludging and getting out mud/sludge/slit/clay/sand and all other foreign organic and inorganic materials from septic tank,soakage well, any depth of getting out muddy sludge slit and all other foreign particle materials and removing out side cantonment area (MD Land) deposited where directed in borrow pits and covering the borrow pit with 15cm thick layer of earth/soil including carrying it outside the cantonment area and refixing thecover to its original position and removing and depositing out of defence land and making sewage system and manholes fully functional to the entire satisfaction of Engineer-in-Charge, complete all as specified and directed.Note :- 1. For measurement of cubic content of sludge please refer PS Clause No 24.12. Work shall be carried out in foul conditions.After dewatering, sewage systems shall be allowed to dry . 3. Sewage/ sullage shall be removed in closed container mounted on vehicle.4. Work shall be carried out as and when required.5. Work will be done only when one supervisor is present at site who will be responsible for ensuring safety of the labours engaged. |
| 37 | Cleaning of shurbs /bushes arround the septic tank, filter bed, manholes and along the sewage line & near building etc, complete all as specified and directed. |
| 38 | M&L for desludging of greas trap, liquid, semi liquid and solid suspended contents and floating matters from the grease trap by mechanical pumping/sewage suction machine by plugging inlets as required; desludging and getting out mud/ sludge/ silt/clay/sand/grit etc and all other foreign organic and inorganic materials, getting out muddy sludge, silt and all other foreign particle material, grass, bushes, vegetation etc and removing outside the cantonment area deposited where directed in borrow pits and covering the buried pit with 15cm thick layer of earth/soil and refixing the cover to its original position and making oxidation pond fully functional to the entire satisfaction of Engineer-in-Charge, Complete all as specified and directed. Note:1 Work in foul conditions.After dewatering, bed shall be allowed to dry. 2. Sewage/ sullage shall be removed in closed container mounted on vehicle.3. Work will be done only when one supervisor is present at site who will be responsible for ensuring safety of the labours engaged. |
| 39 | Bailing out (dewatering) of water and removing sewage (sullage), liquid, semi liquid and solid suspended contents and floating matters from the sump of size 6.70m x 3.45m having approximate depth upto9 metre (double chamber) by mechanical pumping by plugging inlets as required; desludging and getting out mud/ sludge/ silt/clay/sand/grit etc and all other foreign organic and inorganic materials, getting out muddy sludge, silt and all other foreign particle material, grass, bushes, vegetation etc and removing outside the cantonment area and deposited where directed in borrow pits and covering the borrow pits with 15 cm thick layer of earth / soil and refixing thecover to its original position complete all as directed by Engineer-in-Charge and re-fixing the cover to its original position and making oxidation pond fully functional to the entire satisfaction of Engineer-in-Charge, Complete all as specified and directed. Note:1 Work shall be carried out in foul conditions. After dewatering, bed shall be allowed to dry. 2. Sewage/ sullage shall be removed in closed container mounted on vehicle.3. Work will be done only when one supervisor is present at site who will be responsible for ensuring safety of the labours engaged. |
| 40 | Cleaning of blockage/Nahani Trap/Floor trap/WC etc including removing and refixing the grating in same position with cement mortar complete all as specified and directed. NOTES FOR SEWAGE WORKS :-(i) The contractor or his representative will report to Engr-in-Charge daily at 0900hrs to receive complaints pertaining the sewage cleaning and same will be attended and rectified on the same day. (ii)If complaints are not attended within 48 hrs, a panel recovery @ Rs 1000/- per complaint will be recovered from the contractor\"s dues.(iii)The complaint slip will be handed over to the concerned JE within 48 hrs after completion of work.(iv)No any worker/Safaiwala will enter in the Septic tank/sewage tank/manhole etc and if dewatering & sludging is required to be removed for cleaning, mechanical method ie pumping will be carried out and material shall be removed in closed containers/tanks for removal outside MOD land and this aspect is deemed to be included in the quoted rates of the contractor and nothing extra is admissible on this account.(v) Work shall be carried out as and when required.(vi) Work will be done only when one supervisor is present at site who will be responsible for ensuring safety of the labours engaged. |
| 41 | M&L for non skid jointless cerermic coloured tiles(Ist quality) 7 to 8 mm thick (Square/rectangular) area of each tile exc 0.11 Sqm but not exceeding 0.18 Sqm in neat cement slurry and pointed in white or coloured cement with pigment over and including 15 mm thick screed bed in cement motar 1:6, complete all as specified and directed. |
| 42 | M&L for glazed ceramic coloured tiles (Ist quality) 300 x 450mm x 6-7mm / 300 x 200mm x 7mm thick on vertical surfaces as in skirting / dado, set and jointed with neat cement slurry and pointed in white/coloured cement to match the shades of tiles over and including 10mm thick rendering in cement mortar 1:4, complete all as specified and directed. |
| 43 | Demolition of cement conc exc 15cm thickness but above ground flooras in sunken floor, complete all as specified and directed. |
| 44 | M&L for cement concrete type E - 2, 1:5:10 (using 40 mm graded stoneaggregate) as in sunken flooringc, complete all as specified and directed. |
| 45 | M&L for applying two coats of water proofing coating on the entire surface of sunken portion all as per manufacturers instructions, complete all as specified and directed. |
| 46 | M&L for 15mm thick cement screed in cement mortar 1:3 admixed with integral water proofing compound SIKA / STP / FOSROC’s complast X 421 IC @ 130ml per bag of cement including a bonding coat of SIKA / FOSROC”s Nito bond AR cement slurry/STP NO 1 liquid @ 200ml per bag or as per manufacturer\"s instructions, complete all as specified and directed. |
| 47 | S&F in repairs vitreous china squatting pan orissa pattern n 540x440mm white with traps including provn of concrete bedding and all necessary connection excluding flusing cisten and flush pipe, complete all as specified and directed. |
| 48 | S&F in repair of Vitreous China wash down water closet pan (pedestal pattern), white (excluding fixing bolts, flushing cistern and flush pipe, complete all as specified and directed. |
| 49 | S&F in repair EWC seat cover PVC white colour including all fitting arrangements, complete all as specified and directed. |
| 50 | S&F in repair Health faucet (ABS Body) mild steel chromium plated suitable for 15mm dia pipe with 1.50 metre long flexible tube andABS wall hook including making connections and fixed in position, complete all as specified and directed. |
| 51 | S&F in repair PVC valveless 10 liters, syphonic action type, flushing cistern, low level, white, with inlet, ball valve, float and handle including brackets, complete all as specified and directed. |
| 52 | Supply and fix in repair rotational moulded polyethiline water storage tank, (cylindrical /vertical) with closed top hosited and fixed in position all as specified in SSR Part I of 500 Ltrs Capacity, including suitable Brass floaty valves high pressure of with polythene float and fly nut complete screwed of iron pipe or PVC ferrule and fixed ofsize 20/25mm bore, complete all as specified and directed. |
| 53 | S&F in repair of Brass float valves high pressure of with polythene float and fly nut complete screwed of iron pipe or PVC ferrule and fixed ofsize 20mm bore, complete all as specified and directed. |
| 54 | M&L for cleaning water tank of capacity not exceeding 500 ltr and removing all scale and dirt etc from tanks and from mouths of circulating pipes etc complete all as specified and directed (Cleaning date should be written on tank after cleaning), complete all as specified and directed. |
| 55 | M&L for cleaning water tank of capacity n exc 1000 ltr and removing all scale and dirt etc from tanks and from mouths of circulating pipes etc complete all as specified and directed (Cleaning date should be written on tank after cleaning), complete all as specified and directed. |
| 56 | S&F in repairPVC flexiblewaste pipe dia32/40 mm of any description of length not exc 1.2m, complete all as specified and directed. |
| 57 | Dismantling wrought iron or mild steel work of any description not otherwise provided for, complete all as specified and directed. |
| 58 | S&F Mild Steel work in framed , trussed, purlins,columns, crane gantries, rails, stairs, and fastenings and heavy bracket framing (Beam, tee, angle, channel, RHS/SHS or flat sections) including distance pieces, cleats etc, complete all as specified and directed. |
| 59 | Dismantling of barbed wire fence any size and discription fixed with fencing post, complete all as specified and directed. |
| 60 | S&F galvanised 2 strand steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacing and straining and fixing to any type of standard rails straining bolts including securing or tying at crossing with and provision of galvanised mild steel wire staples or steel etc as directed (each line wire to be measured), complete all as specified and directed. |
| 61 | All as per item No 60 above but in restraining resecuring including making good. |
| 62 | S&F in repair MS galvanised punched tape concertina coil of 600mm coil dia or any other coil dia size any type of strands rails etc including provision of mild steel (annealed) binding wire as in repairs, complete all as specified and directed. |
| 63 | S&F in repairs chain link MS galvanised fencing any size and type including lines wires, straining bolts including binding wires etc, complete all as specified and directed.Note :-The weight of the chain link fencing after arrival at site shall be ascertained by a Board of Officers to be detailed by the Accepting Officer before incorporation in the work. |
| 64 | M&L for preparation of new steel surface and applying two coats of synthetic enamel paint over one coat of red oxide primer, complete all as specified and directed. |