| 1 | Earth work Excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m etc., complete as directed by the site in-charge. |
| 2 | Laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1:3:6) (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) including laying and curing etc., complete as directed by the site in-charge.. |
| 3 | Laying in position specified grade of reinforced cement concrete (R.C.C. Footing), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (1:1.5:3) (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) etc., complete as directed by the site in-charge. |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: (1:1.5:3) (1 cement: 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) etc., complete as directed by the site in-charge. |
| 5 | Centering and shuttering including strutting, propping and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts etc., complete as directed by the site in-charge. |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treated bars of grade Fe-500D or more including cost, conveyance, loading and unloading of material and labour charges etc., complete as directed by the site in-charge. |
| 7 | Laying in position specified grade of reinforced cement concrete (Beam), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (1:1.5:3) (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) etc., complete as directed by the site in-charge. |
| 8 | Centering and shuttering including strutting, propping and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers etc., complete as directed by the site in-charge. |
| 9 | Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar (1:6) (1 cement : 6 coarse sand) including laying, curing, cost of the material, labour charges, transportation charges, loading & unloading charges etc., complete as directed by the site in-charge. |