| 1 | Office |
| 2 | Earth work in excavation in ordinary soil upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of workcolumn footing for wall less column pedastal appron short sides septic tank |
| 3 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.Appron short sides under floor rest room septic tank |
| 4 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labourand T&P etc required for proper completion of workappron septic tank |
| 5 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage inplinth beam i/c supply of all material,labour and T&P etc.including all complete of workmumty beams short sides |
| 6 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage incolumn i/c supply of all material,labour and T&P etc.including all complete of workfor parapet wallmummy column |
| 7 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage insuspended floor slabi/c supply of all material,labour and T&P etc.including all complete of workformummy columnseptic tank |
| 8 | Mild steel or iron work such as reinforced including supply of all material labour and t&p etc required for proper completion of work taking inheavy beam 1.00% taking in column 1.20% taking in slab 1.25% |
| 9 | M-150 brick work in 1:6 with cement,fine sand in foundation and plinthmortar in super structure including supply of all material,labour and T&P etc.required for proper completion of workappron wall short side |
| 10 | M-150 brick work in 1:4 with cement,coarse sandmortar in super structure including supply of all material,labour and T&P etc.required for proper completion of workparpet wall short side less mumtyarea less column mumty wall toilet wall less d1 lessVparpet wall short & partion wall |
| 11 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work parapet wall mumty area less d ass side septic tank short side |
| 12 | supply and fixing 6-8 mm thick Vitified tiles size 600x600mm of first qualtiy in floor & wall or skirtting with 1.3 cement coarse sand motor with white cement slurry jointuing and polisihng including and supply oa all material labour and t&p etc required for p[roper completion fo work office rest room hall cill cill |
| 13 | supply and fixing 6mm thick china glazed tiles of first quality in floor & wall or skitring with 1.3 cement coarse sand morotr withy white cement slurry jointing and polishing including supply of all material labour t&p etc reuired for completion of work long wallshort wall toilet wall toom hall stair case wall staircase wall entrance door |
| 14 | Providing and laying \"brick coba\"/ (Mud Phaska)12mm thick laid with M-150 class brick bat coba 7.50cm thick with gap of 15mm to each other,over 20mm thick base ofcement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry withtop mashed false square 30cm x30cm and side wall parapet shall be mono tythic plasterwall upto 30cm higher incluing supply of all materials ,labour and T&P etc. required for proper completion of the work |
| 15 | Providing & Applying wall putti on new surface with two coat approved brand including supply of all material,labour and T&P etc.required for proper completion of workas per plaster area president room short wall toilet wall short wall rest room wall short wall toilet wall short wall rest room wall short wall hall short side down beam staircase opening entrance door outer side plaster add ceilling area staircase flight |
| 16 | Finishing wall with water proof cement paint weather coat apex of approved make and quality with two coat to given even shed i/c prepareing surface including supply of all material,labour and T&P etc.required for proper completion of workadd ceilling area add celiing area stair case flight outer side plaster |
| 17 | Applying two coat enaimel paint over priming coat on wood or steel and other metal surface including supply of all material,labour and T&P etc required for proper completion of work entrance door |
| 18 | Providing & Fabrication of Hollow pipes Gate & windows in Appolo pipes including welding rubbing including supplyof all material,labour and T&P etc.required for proper completion of work mumty door |
| 19 | Supply and fixing PVC false ceillingincluding supply of all material,labour and T&P etc required for proper completion of work office rest room |
| 20 | Supply and fixing PVC Wall panneling including supply of all material,labour and T&P etc required for proper completion of workcomputer room |
| 21 | Supply andFixing Air conditioner in 2 Ton of approved Make and quality supply of all materials ,labour and T&P etc. required for proper completion of the work |
| 22 | Supply and fixing Stainless steel railling in 304 grade including supply of all material,labour and T&P etc.required for proper completion of work |
| 23 | Providing & laying 18mm thick gang saw cut,miror polished for staircase polshingincluding supply of all material,labour and T&P etc.required for proper completion of work front railling landing |
| 24 | Providing Edge moulding to 18mm thick granite stone in staircaseincluding supply of all material,labour and T&P etc.required for proper completion of work front railling |
| 25 | supply of table making with ply board in L shape including all complete of work |
| 26 | supply of boss chair |
| 27 | supply of visitor chair |
| 28 | Add for Internal & External Electrification fittings inc ceilling fan@ 10.00% on Total A |
| 29 | Add for Sanitary and Internal plumbing fitting |
| 30 | gst |