| 1 | Inter lockin tiles and Drain |
| 2 | Dismantling of old and damage Interlocking tiles including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-17/697) side gali |
| 3 | Disposal of dismantling material up to 5km lead inc loading/unloading including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-3/231a) |
| 4 | Earth work in filling upto 5km distance lead with catageroy royality for levleing dressingincluding supply of all material,labourand T&P etc required for proper completion of work. Deduction 12.50% settlement |
| 5 | Concrete in 1:6:12 with cement fine sand brick ballast of 4cm gaudgeincluding supply of all material,labour and T&P etc.required for proper completion of work. (chpt-5/273) drain base |
| 6 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-6/307) both side drain base |
| 7 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-13/582a) drain wall |
| 8 | Laying cc work in 1:2:4 with cement coarse sand and stone ballast of 2 cm gaudge including supply of all material labour completion of work (chpt /5/279a) Drain cc |
| 9 | Providing,laying,spreading 22.4-53mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of workas per item no1 |
| 10 | Cement concrete with 2cm gauge approved stone grit,coarse sand and cement in proporation of 1:1.5:3 in pavement for c.c road coarse and fine aggregate cinfirming to IS standard mixed in concrete mixture laying and fixing of 125 micron thick polytheen film,wedges ,steel plates including supply of all material,labourand T&P etc required for proper completion of work (Chpt-20,New9(1) same area as per item no 1 |
| 11 | Supply and fixing of iron work such as heavysize iron forchannelincluding supply of all material,labour and T&P etc required for proper completion of work (chpt 10/503) channel |
| 12 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone ballast of 2cm guage in raft and wall i/csupply of all material,labourand T&P etc required for proper completion of work (Chpt-5/284a) drain cc |
| 13 | supply and fixing of iron work such as reinforced steel including supply of all material labour and t&p etc required for proper completion of work (as per sale) |
| 14 | add sign board of granite stone |
| 15 | gst |