| 1 | Key Personnel |
| 2 | Team Leader Cum Senior Highway Engineer |
| 3 | Senior Bridge Engineer |
| 4 | Highway cum Pavement Engineer |
| 5 | Material-cum-Geo-technical Engineer – Geologist |
| 6 | Senior Survey Engineer |
| 7 | Sub Professional Staff |
| 8 | Traffic and Safety expert |
| 9 | Environmental Specialist |
| 10 | Quantity Surveyor / Documentation Expert |
| 11 | Land Acquisition Expert |
| 12 | Utility Expert |
| 13 | Support Staff |
| 14 | Office Manager |
| 15 | Typist |
| 16 | Office Boy |
| 17 | Night watchman |
| 18 | Transportation (Fixed Rate on rental basis)The vehicles cost shall include th cost of rental, driver, operation, mintenance, repairs & insurance etc. |
| 19 | Toyota Innova Crysta or equivalent (1 Nos.) (Not more than 06 Months Old) 10*1=10 months |
| 20 | Swift Dzire or equivalent (1Nos.)(Not more than 06 Months Old) 10*1=10 months |
| 21 | Duty Travel to Site (Fixed Costs) Professional and Sub-Professional Staff . The employer may require the Key Personnel to visit the Employer’s head quarter & Site / Employer’s Representative Office /other authorities. The quoted amount should include travel fare for 20 round trip to Employer’s Head Office and 20 round trip to Employer’s Representative Office (including Hotel charges, travel costs etc. Complete). |
| 22 | Office Rent (Fixed Costs) – Minimum 400 sqm area of office shall be rented |
| 23 | Office Rent (Fixed Costs) – Minimum 400 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete. |
| 24 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 25 | Office Supplies Drafting |
| 26 | Supplies Computer |
| 27 | Running Costs |
| 28 | Domestic and International Communication |
| 29 | Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) |
| 30 | The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre- loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. |
| 31 | Reports and Document Printing |
| 32 | Monthly Report (03 per month -103=30 Nos) |
| 33 | Inception Report & QAP |
| 34 | Environment and Social Impact Screening Report |
| 35 | Draft Feasibility Report |
| 36 | Final Feasibility Report |
| 37 | Strip Plan with L.A. Reports |
| 38 | Draft LA and Clearances I Report |
| 39 | Final LA and Clearances I Report |
| 40 | Draft Environmental Assessment report & RAP |
| 41 | Final Environmental Assessment report & RAP |
| 42 | Draft Detailed Design Report &Drawings etc. |
| 43 | Draft EMP |
| 44 | Draft Bidding Documents |
| 45 | Final Detailed Project Report with Bill of Quantities, Cost Ss, Updated Drawings etc |
| 46 | Final EMP |
| 47 | Final Bidding Documents |
| 48 | Draft 3(a) ,3(A) and 3(D)notification for land acquisition( 3 copies each) |
| 49 | LA & Clearances II Report |
| 50 | Survey Equipment with Survey Party and Vehicle etc complete |
| 51 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer |
| 52 | Detailed topographic surveys using mobile/ aerial LiDAR or better technology |
| 53 | Road and Bridge Inventory |
| 54 | FWD Test and Pavement Evaluation |
| 55 | Roughness Survey |
| 56 | Axle Load Survey |
| 57 | Material Survey and Investigation |
| 58 | Sub-grade Investigation |
| 59 | Traffic Survey |
| 60 | Socio-economic & Census Survey/Studies |
| 61 | Land Acquisition Studies |
| 62 | Any other investigations/surveys |
| 63 | *Sub-Soil Investigation (Boring) |
| 64 | a) Boring in all type of soils (other than hard rock) 1500m (for project of length <110 Km) or 2000 m (for project of length >110 Km) qty in mtr |
| 65 | b)Boring in hard rock, 200 mtr (for project of length <110 Km) or 300 mtr (for Project of length >110 Km) qty in mtr |
| 66 | Net work Survey of the existing Highways as a repositoryfor civil work as per directions from Authority. |
| 67 | GPR Survey for detection of under ground utilities |
| 68 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fixboundarypillarsalongtheproposedalignmentontheextreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
| 69 | Land acquisition Team including support staff: |
| 70 | Ex-Land Revenue Inspector/Officer or equivalent |
| 71 | Ex-Kanoogo/Girdwar or equivalent |
| 72 | Ex-Patwari or equivalent |
| 73 | Typist |
| 74 | Peon |
| 75 | Logistics for Land acquisition Team: |
| 76 | Computer including necessary peripherals (2x8=16) |
| 77 | Printers (2x8=16) |
| 78 | Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1x8=8) |
| 79 | Remuneration of exptrite staff including per diem allownces |
| 80 | Staff-1 |
| 81 | Staff-2 |
| 82 | Staff-3 |
| 83 | Staff-4 |
| 84 | Staff-5 |
| 85 | Staff-6 |