| 1 | Earth work excavation of foundation trench in hard soil including dressing and levelling the bed with initial lead of 50m. and 1.5 m. initial lift including all costs of labour materials required for the work etc. complete and as per direction of Engineer in charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
| 3 | Cement concrete (1:4:8) with 4 cm. crusher broken hard granite metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering, curing for seven days with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
| 4 | Brick work with Flyash Bricks in foundation & plinth in cement mortar (1:6) including cost of all material and labour required for the work etc. complete and as per direction of Engineer-in charge. |
| 5 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying etc complete & as per direction of Engineer-in- charge.Ground Floor |
| 6 | Supplying and labour charges for cutting bending binding & tying the grills of HYSD rod and placing the grills in proper position including cost of MS rod ( SAIL ) with all taxes royalty and labour required for the work etc. complete and as per direction of Engineer-in charge. |
| 7 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismentaling then after casting including cost of materials required for the work etc. complete and as per direction of Engineer-in-charge. a) Column base, plinth band |
| 8 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismentaling then after casting including cost of materials required for the work etc. complete and as per direction of Engineer-in-charge. b) Lintel and wall beam |
| 9 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismentaling then after casting including cost of materials required for the work etc. complete and as per direction of Engineer-in-charge. c) Column and beam |
| 10 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismentaling then after casting including cost of materials required for the work etc. complete and as per direction of Engineer-in-charge. d) Slab, chajja and landing |
| 11 | Brick work with Flyash Bricks in super structure in cement mortar (1:6) including cost of all material and labour required for the work etc. complete and as per direction of Engineer-in charge. |
| 12 | 12mm thick cement Plaster in CM (1:6) over brick work including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. |
| 13 | 16mm thick cement plster (1:6) over Brick work including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. |
| 14 | 20 mm thick plastering in cement mortar (1:4) including cost of all material and labour required for the work etc. complete and as per direction of Engineer-in-charge. |
| 15 | Fixing Kota tiles in floors, treads steps and landing on 25 mm thick bed of cement mortar (1:1) joint with neat cement slurry etc and as per direction of Engineer-in-charge. |
| 16 | Fixing Kota tiles in dado, Riser on cement mortar (1:3) joint with neat cement slurry etc and as per direction of Engineer-in-charge. |
| 17 | Fixing of chequered tiles in floors, tread steps and landing on 25mm thick bed of cement mortar (1:1) joint with neat cement slurry etc. complete and as per direction of Engineer-in-charge. |
| 18 | Fixing and fitting of ceramic floor tile with neat cement slurry etc and as per direction of Engineer-in-charge. |
| 19 | Fixing and fitting of ceramic wall tile with neat cement slurry etc and as per direction of Engineer-in-charge. |
| 20 | Supplying fitting fixing of M.S Doors, windows & grills in proper position including cost of all materials and labour required for the work etc. complete and as per direction of Engineer-in-charge. |
| 21 | Supplying fitting and fixing of Aluminium Door including all cost and as per direction of Engineer-in-charge. |
| 22 | Painting two coats of enamel paint over a coat of red oxide Primer on new works including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. |
| 23 | Wall painting two coats with approvedshed of plastic emulsion paint over 1 coat of wall primer including cost of materials and labours etc. complete and as per direction of Enginner-in-charge. |
| 24 | Finishing wall two coats with approved weather coat over 1 coat of wall primer including cost of materials and labours etc. and as per direction of Engineer-in-charge. |
| 25 | Supplying, fitting & fixing of Stainless steel of 304 grade in hand railling using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe beacing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc complete & as per direction of Engineer -in- charge. |
| 26 | Add for Electrification Work As Per Estimate Attached |
| 27 | Water Supply & Sanitation |
| 28 | Transparency Board & Inauguration board Please Enable Macros to View BoQ information |