| 1 | Loading, Carriage and unloading of poles from store to work site or vice-versa. |
| 2 | Erection of Double pole structure by digging of pit by hydra. |
| 3 | Erection of repaired/new S.T. Pole size 9.0 Mtr. To 13.00 Mtr. With the help of crane including of Pit back filling and ramming. |
| 4 | Grouting of pole with cement brick ballast and coarse sand as per standard specification. |
| 5 | Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 6 | Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paintincluding cost of Ist Class enamel paint. |
| 7 | Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications. |
| 8 | Dismentalling of Damaged S.T. Pole of very Critical Position with the help of crane after removing all the accessories from damaged pole and its all related work including digging of pit or by cutting with gas cutter. |
| 9 | Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
| 10 | Fabrication/modification of MS Item as per requirement of site. |
| 11 | Fixing of MS Channel (100x50x6) mm 2.4 / 2.8/ 0.35 mtr. Long/T-off channel. |
| 12 | Dismentalling of binding wire from insulators and loosening of the ACSR Dog conductor on each pole then lowering down the ACSR Dogconductor & rolling into bundles. |
| 13 | Loading, Carriage and unloading of ACSR Dog Conductor from store to work site or vice-versa. |
| 14 | Laying, Stringing & Tensioning of ACSR Dog Conductor and for making jumpers on riser. |
| 15 | Taking out 33kv and 11 kV 3x70 to 3x300 XLPE Cable/LT Cable except service cable from cable drum before laying and transportation of the cables from store to work site or vice-versa. |
| 16 | Digging of Trench for laying of 11 KV and 33 KV cable in Normal soil in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 17 | Digging of Trench for laying of 11 KV and 33 KV cable in Khadanja soil in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 18 | Digging of Trench for laying of 11 KV and 33 KV cable in Mettalic Soil in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 19 | Laying of 33 KV/11 KV XLPE cables in above digged trench covering with bricks and back filling and proper ramming upto pole as per standered. |
| 20 | Supply and Laying of HDPE PIPE (Size 140/200 mm dia) as per Respo Norms |
| 21 | Supply and Laying of HDPE PIPE through HDD Method (Size 140/200 mm dia) as per Respo Norms |
| 22 | Lyaing of G.I. Pipe/MS Pipe/ Old & Used Pole Pcs |
| 23 | Fixing of G.I. Pipe/MS Pipe/Old & Used Pole Pcs. |
| 24 | Laying of cable in above digged trench in HDPE Pipe 140/200 mm dia / G.I. Pipe/MS Pipe/ Old & Used Pole Pcs |
| 25 | Digging of Pit 2x2x1 mtr. for laying of cable through HDD Method. |
| 26 | Laying of 33 KV/11 KV 3x300/400/185 sq.mm XLPE Cable through HDD Method upto Pole. |
| 27 | Laying of 33 KV/11 KV 3x300/400/185 sq.mm XLPE Cable in Air Pole to Pole. |
| 28 | Making and Digging of Pit 2x2x1 mtr. for Making straight through joint. |
| 29 | Mounting of cable box on pole/ cable support structure / in VCB |
| 30 | Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 31 | Making of H.T. Jumpers from 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 32 | Mounting of 33 kV / 11kV Pin Insulator |
| 33 | Erection of 33kV /11 kV Disc Fitting with disc string |
| 34 | Dismantling of M.S. Channel/X-arm/Guarding angle |
| 35 | Erection of Bracing set |
| 36 | Chopping of tree branches lying in the route of existing line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site. |
| 37 | Fixing of danger board on erected poles |
| 38 | Fixing of G.I. Barbed wire |
| 39 | Loading, carriage and unloading of Aearial Bunched Cable from store to work site or vice-versa. |
| 40 | Laying of LT Aerial Bunched Cableincluding fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Poleetc. |
| 41 | Dismantling of L.T./H.T. A.B. Cable and rolling into bundles |
| 42 | Opening of L.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work. |
| 43 | Making H.T./LT Section points by brackets, clamps & insulator, Tightening of Line, binding of conductor & proper connection. |
| 44 | Making of L.T. Jumpers from 3 Phase 4 Wire L.T. O.H. line for erection work. |
| 45 | Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. |
| 46 | Mounting & Erection of three phase distribution box of AB Cablewith Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. |
| 47 | Opening and reconnection of consumer service connections after replacement of line/ poles etc. |
| 48 | Supply and Fixing concrete Stone Route marker of 300 mm width x 150 mm thick x 650 mm height embedded in earth at least 300 mm below and 350 mm above ground level at every 100 m along the length of the cable with RCC concreting as per standard specification. |
| 49 | Re-arrangement of 33 KV/11KV existing line / Cables |
| 50 | Re-sagging of conductor, on old line after erection of pole, binding of conductor etc. |
| 51 | Connecting of newly erected network with KESCo mains including testing, commissioning and energization of the same completely. |
| 52 | Installation of RMU |
| 53 | Making plinth and Grouting ofRMU |
| 54 | Energisation of RMU |
| 55 | Erection of TPMO |
| 56 | Erection of LT Circuit 500V/500A |
| 57 | Erection of DO Fuse set |
| 58 | Making Plinth of Distribution Transformers |
| 59 | Shifting of Distribution Transformers |
| 60 | Dismental of \"A\"/ \"B\"/ \"C\" Panel |
| 61 | Fabrication & erection of Distribution T/F Fencing |
| 62 | Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 80 feet long with socket cutter, earth wire 7/14 SWG, Nut & bolts with connection of pipe to distribution T/F Neutral or Body all material shall be provided by contractor with cost of all material. |
| 63 | Laying of LT XLPE 1x400 sqmm cable T/F to ACB |
| 64 | Road restorationcharges for areas other than RoW of UP Bridge Corporation (if any) |
| 65 | Carriage of all concerning stock material from KESCo Store to site or vice-versa including Cable Drum. |