Name of Work: Construction of RCC Drain for disposal of Rain Water of Village Jhanjhari at I.A Unnao Site-2, Distt.-Unnao
Sl. No.
Item Description
1
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Add to items 300-301.5 for every additional 30 m lead or part of 30 m. or for for every additional 1.50 m.lift or part of 1.50 m.0.00 - 1.50M
2
Same as above item for - 1.50 - 3.00M
3
Providing and laying cement concrete 1:4:8 (1 Cement, 4 coarse sand, 8 graded stone ballast 40 mm. nominal size) Including supply of all materials, labour and T&P etc. required for proper completion of the work and curingcomplete also including cost of form work in foundation & floors.
4
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement contentin design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mixor bear the cost of extra cement.
5
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not Included in over all rates) brought to required shape as necessary including bending for proper completion of the work and ircluding supply of all steel and wastage & over lapping & hooks.
6
Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete
7
Centering and shuttering including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
8
Centering and shuttering including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.