|
| 1 | Cleaning jungle including up rooting of rank vegetation grass, bush, wood, trees and sapling girth uoto 30 cms. Measured at the height of 1Mitar above ground level and removal of rubbish up to a distance of 50 M. Out side the periphery of area cleared. item No. 259 SOR 2022 |
| 2 | Dismantling birick work or stone work in line or cement mortar and in including stacking or materials as directed by the Engineer- in- charge with in a distance of 60 meter (200 feet) item No. 692 SOR 2022 |
| 3 | Brick recoverd from Dismantling damage park baundry wall |
| 4 | Brick Bats recoverd from Dismantling damage park baundry wall |
| 5 | Earth work in cutting or in embankment in ordinary soil mixed to be in the form of regular pits not exceeding 1/2 meter (20\") depth and earth work in embankment to be in 20cm (8\"\") layers including ramming and dressing the surface to required lavels and slopes and also including 1.50M (5ft) lifts and 30M (100ft) lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 08kmdistance as directed by the Engineer in charge (PWD SI No-253A+231a)/2022 |
| 6 | Dismantling Cement concrete or brick or granolithic floors Including base concrete and Including stacking of dismantled materials as directed by the Engineer Incharge with in a distance of 60 mater. SOR 697/2022 |
| 7 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.5 m lead upto 30m and including filling watering and ramming of excavated earth into the tranches or into the space between the building & the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the E/I. upto a distance of 30M from the foundation trenches. (where machine can not reach/move). For building work only.(PWD SI No-251)/2022 |
| 8 | Cement Concrete with 4cm. Guagebrick ballast fine sand of 1:25 F:M and cement in proporation of 8:4:1 in foundation and under floors including supply of all meterials. labour T&P etc all complete. (SI.No-275/2022) |
| 9 | M-150 brick work in 1:6 cementand six fine sand of 1:25 F.M. motar) in foundation and plinth including supply of allmaterials, labour and T&P etc. required for proper completion of work. (S.I.No.303)/2022 |
| 10 | M-150 brick work in 1:4 cementand coarse sand mortar in super structure including necessary cutting and moulding of brick as required thickness of walls nat to be less than 1-1/2 brick thick wall including all materials, labour and T&P etc. required for proper completion of work. (S.I.No.307A+309)/2022 |
| 11 | M-150 brick work in 1:4 cementand coarse sand mortar in super structure including necessary cutting and moulding of brick as required thickness of walls nat to be less than 1 brick thick wall including all materials, labour and T&P etc. required for proper completion of work. (S.I.No.307A+309+310)/2022 |
| 12 | M-150 brick work in 1:3 cementand coarse sand mortar in super structure including necessary cutting and moulding of brick as required thickness of walls nat to be less than 1/2 brick thick wall including all materials, labour and T&P etc. required for proper completion of work. (S.I.No.307A+309+310A)/2022 |
| 13 | Dimantling existing plaster including Disposal of refuse as directed by the Engineer in charge with in a distance of 60 meet (200 feet) SOR N0 706/2022 |
| 14 | 12 mm. thick plaster with 1 : 4 (one part cement & Four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of all material , labour , T & P etc. required for proper completion of the work. S.I.No.584/2022 |
| 15 | Finishing walls with Acrylic Smooth exterior paint of required shade :13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqmover and including priming coat of exterior primer applied on previsully paint on old surface.@ 2.20 kg/10 sqm) DSR 13.46.1/2023 |
| 16 | 40 mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1\"5 (1 cement: 5 corse sand ) with joints finished flush, red sand stone 11.28.1 DSR2010 |
| 17 | Cement Concrete with 2cm, guage approved blaste ballast coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of work. (S.I.No.279A)/2022 |
| 18 | Mild steel or iron work of small size and sections such as holding down bolts, hold fast, tle. roads, gratings etc (when not includied in an over all rates) wrought to reuired form including of supply of steel, bolts, nuts and wastage etc and fixing.required for proper completion of work. (S.I.No.502) |
| 19 | Supply & fixing of RCC benchs Sopha modle. |