Supply, Installation And Commissioning Of X-Ray Photoelectron Spectrometer , Supply, Installation And Commissioning Of X-Ray Photoelectron Spectrometer , X-Ray Photoelectron Spectrometer , Uv Photon Spectroscopy (Ups) , N2 (99.9999 % Purity) Cylinder , Ar Cylinder , Compressed Air Gas Cylinder , He Gas Cylinder , Double Stage Brass Regulators , Gas Purification Panel And Manifold For Gas Which Can Switch Empty Cylinder To Filled Cylinder , Ups 20 Kva With 2 Hours Backup , 1.5 Ton Acs , Stabilizers For Acs , Chiller For Water Cooling , Computer System With Latest Os (Windows) , Laptop For Data Analysis , Consumables , Copper Gaskets Of All Sizes , Filament Assembly For In-Lens High Energy Flood Source , Filament Assembly For In-Lens Low Energy Flood Source , Filter Catridge For Water Circuit , Ar Bottles For Sputtering With Cleanable Gas Lines , Uhv Tools , Spanners And Allen Keys Etc Of All Sizes , Kf Components For Roughing Pumps (Flanges, Lock Keys, Gaskets, L- Connectors, Big-To-Small Connectors, Bellows Etc) , Multimeters , Backing Pump Oil , Suitable Thermocouples For Temperature Measurement As Mentioned In Main Specifications (Serial No. 26) , Standards For Calibration , 50 L Dewar , Silicon Wafers P-Type And N-Type, 3 Inch Diameter (50 Nos. Each) , Carbon Tapes , Al Foil Rolls , Titanium Sublimation Pump Filament Kit (Includes 3 Filaments Per Kit) , Molecular Mesh For Oil Trapping In Roughing Pump (In Case Of Rotary Pump) , Viton O-Ring , Non-Comprehensive Annual Maintenance Chargesfor1st Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 2Nd Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 3Rd Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 4Th Year After The Warranty Period Of 3 Years , Non-Comprehensive Annual Maintenance Chargesfor 5Th Year After The Warranty Period Of 3 Years