Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon steel PIPE, API 5L Gr.B,SMLS,BW, B36.10,50NB,SCH 40 |
| 2 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon steel PIPE, API 5L Gr.B,SMLS,BW, B36.10,100NB,SCH 80 |
| 3 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon steel PIPE, API 5L Gr.B,SMLS,BW, B36.10,200NB,SCH 80 |
| 4 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless Steel PIPE, ASTM A312 TP304L,SMLS,BW, B36.19,150NB, SCH 40S |
| 5 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor600#, WNRF FLANGE,CARBON STEEL, B16.5, ASTM A105,50 NB |
| 6 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor600#, WNRF FLANGE,CARBON STEEL, B16.5, ASTM A105,100 NB |
| 7 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor600#, WNRF FLANGE,CARBON STEEL, B16.5, ASTM A105,200 NB |
| 8 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor600#, BLIND FLANGE,CARBON STEEL, B16.5, ASTM A105,100 NB |
| 9 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor600#, WNRF FLANGE, STAINLESS STEEL,B16.5, ASTM A182 F304L,150 NB |
| 10 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorSPECTACLE BLIND FLANGES,600#, RF, B16.5, ASTM A105 ,200 NB |
| 11 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,90 deg ELBOW, LR, SCH 40, B16.9, A234 WPB, BW,50 NB |
| 12 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,90 deg ELBOW, LR, SCH 80, B16.9, A234 WPB, BW,100 NB |
| 13 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,90 deg ELBOW, LR, SCH 80, B16.9, A234 WPB, BW,200 NB. |
| 14 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,45 deg ELBOW, LR, SCH 80, B16.9, A234 WPB, BW,200 NB |
| 15 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor Carbon Steel,EQUAL TEE, SCH 80, B16.9, A234 WPB, BW,100 NB |
| 16 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor Carbon Steel,EQUAL TEE, SCH 80, B16.9, A234 WPB, BW,200 NB |
| 17 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,REDUCING TEE, SCH 80, B16.9, A234 WPB, BW,100 x 50 NB |
| 18 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,REDUCING TEE, SCH 80, B16.9, A234 WPB, BW,200 x 100 NB |
| 19 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,NIPPLE BEP, SCH.80, API 5L Gr.B, SMLS, 100LG,20 NB |
| 20 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,NIPPLE OET, SCH.80, API 5L Gr.B, SMLS, 100LG,20 NB |
| 21 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractor Carbon Steel,HALF CPLG., 3000#, B16.11, A105, SW,20 NB |
| 22 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCarbon Steel,CAP.,3000#,B16.11, A105, THRD, 20 NB |
| 23 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless Steel,90 deg ELBOW, LR, SCH.40S, B16.9, A403 WP304L, BW ,150 NB |
| 24 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless Steel,45 deg ELBOW, LR, SCH.40S, B16.9, A403 WP304L, BW ,150 NB |
| 25 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless steel,EQUAL TEE, SCH.40S, B16.9, A403 WP304L, BW 150 NB |
| 26 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless steel,NIPPLE BEP,SCH.40S, A312 TP304L, SMLS, 100LG,20 NB |
| 27 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless steel,NIPPLE OET,SCH.40S, A312 TP304L, SMLS, 100LG, 20 NB |
| 28 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless steel,HALF CPLG., 3000#, B16.11, A182 F304L, SW,20 NB |
| 29 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorStainless steel,CAP, 3000#, B16.11, A182 F304, THRD,20 NB |
| 30 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorGasket,600#, AISI 304 CNAF , SPW, ANSI B16.20,50 NB |
| 31 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorGasket,600#, AISI 304 CNAF , SPW, ANSI B16.20,100 NB |
| 32 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorGasket,600#, AISI 304 CNAF , SPW, ANSI B16.20,150 NB |
| 33 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorGasket,600#, AISI 304 CNAF , SPW, ANSI B16.20,200 NB |
| 34 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorA193 GR.B7 STUD BOLT & A194 Gr.2H HEX NUTS,M16 x 110 |
| 35 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorA193 GR.B7 STUD BOLT & A194 Gr.2H HEX NUTS,M22 x 145 |
| 36 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorA193 GR.B7 STUD BOLT & A194 Gr.2H HEX NUTS,M30 x 195 |
| 37 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorA193 GR.B7 STUD BOLT & A194 Gr.2H HEX NUTS,M30 x 235 |
| 38 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorA193Gr.B8T CL.2 STUD BOLT & A 194-8C HEX NUTS,M24 x 170 |
| 39 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCARBON STEEL GATE VALVE, 800#, API602, BODY A105, TRIM-8, SW,20 NB |
| 40 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCARBON STEEL GATE VALVE,600#, API600, BODY- A216 Gr.WCB,TRIM- 8, FLGD, 50 NB |
| 41 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCARBON STEEL GATE VALVE,600#, API600, BODY- A216 Gr.WCB,TRIM- 8, FLGD, 100 NB |
| 42 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorCARBON STEEL GATE VALVE,600#, API600, BODY- A216 Gr.WCB,TRIM- 8, FLGD, 200 NB |
| 43 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorSTAINLESS STEEL GATE VALVE, 800#, API602, BODY- A182 Gr. F304L,TRIM- 2, SW,20 NB |
| 44 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorSTAINLESS STEEL GATE VALVE, 600#, ANSI B16.34, BODY- A351 Gr.CF8,TRIM- 2, FLGD,150 NB |
| 45 | Supplyincludingthird party inspection, transportation,unloading at site,storing at owners storage point etc. of the following piping items.All necessary tools& tackles and man power required for unloading the consignment and stacking the items at store shall be included in the quoted rate.Supply of all other materials required for completion of work shall be in scope of contractorSTAINLESS STEEL GLOBE VALVE, 600#, ANSI B16.34, BODY- A351 Gr.CF8, FLGD 150 NB |
| 46 | The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting, up, tack welding,cleaning, chipping, preheating, placing of wind shields and / wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds . This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supportsFor branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforecement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld.The rates does not cover stress releaving, radiography/Ultrasonic/DP testsPayment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached.Payment for non specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest avilable size / thicknessMATERIAL: CS, B36.10, API 5L Gr.B,SMLSButt welding & Fillet Welding (identified along with size / size range below - socket welding, slip on welding, branch welding) - With / without reinforcement.Size : 20 NB , Thickness/Schedule: SCH 80 |
| 47 | The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting, up, tack welding,cleaning, chipping, preheating, placing of wind shields and / wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds . This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supportsFor branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforecement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld.The rates does not cover stress releaving, radiography/Ultrasonic/DP testsPayment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached.Payment for non specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest avilable size / thicknessMATERIAL: CS, B36.10, API 5L Gr.B,SMLSButt welding & Fillet Welding (identified along with size / size range below - socket welding, slip on welding, branch welding) - With / without reinforcement.Size : 50 NB , Thickness/Schedule: SCH 40 |
| 48 | The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting, up, tack welding,cleaning, chipping, preheating, placing of wind shields and / wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds . This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supportsFor branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforecement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld.The rates does not cover stress releaving, radiography/Ultrasonic/DP testsPayment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached.Payment for non specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest avilable size / thicknessMATERIAL: CS, B36.10, API 5L Gr.B,SMLSButt welding & Fillet Welding (identified along with size / size range below - socket welding, slip on welding, branch welding) - With / without reinforcement.Size : 100 NB , Thickness/Schedule: SCH 80 |
| 49 | The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting, up, tack welding,cleaning, chipping, preheating, placing of wind shields and / wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds . This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supportsFor branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforecement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld.The rates does not cover stress releaving, radiography/Ultrasonic/DP testsPayment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached.Payment for non specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest avilable size / thicknessMATERIAL: CS, B36.10, API 5L Gr.B,SMLSButt welding & Fillet Welding (identified along with size / size range below - socket welding, slip on welding, branch welding) - With / without reinforcement.Size : 200 NB , Thickness/Schedule: SCH 80 |
| 50 | The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting, up, tack welding,cleaning, chipping, preheating, placing of wind shields and / wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds . This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supportsFor branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforecement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld.The rates does not cover stress releaving, radiography/Ultrasonic/DP testsPayment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached.Payment for non specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest avilable size / thicknessMATERIAL:SS, B36.19, A312 TP304L,SMLSButt welding & Fillet Welding (identified along with size / size range below - socket welding, slip on welding, branch welding) - With / without reinforcement.Size : 20 NB , Thickness/Schedule: SCH 40S |
| 51 | The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting, up, tack welding,cleaning, chipping, preheating, placing of wind shields and / wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds . This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supportsFor branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforecement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld.The rates does not cover stress releaving, radiography/Ultrasonic/DP testsPayment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached.Payment for non specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest avilable size / thicknessMATERIAL:SS, B36.19, A312 TP304L,SMLSButt welding & Fillet Welding (identified along with size / size range below - socket welding, slip on welding, branch welding) - With / without reinforcement.Size : 150 NB , Thickness/Schedule: SCH 40S |
| 52 | The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including,steam/condensate manifolds together with attached fittingsThe work shall include transporatation from owners storage point, handling, rigging, scaffolding, placing and alignment of pipe and fitting into their respective positions and on to their respective supports, hydro test, painting as per the engineering specifications provided.Fabrication and Erection of trunnion supports, installation of special items like bellows, strainers, traps,fabrication and erection of spacers etc. are also included in this rate. Hydraulic/Pnematic testing of the piping systems, flushing draining and drying up shall also be included in the quoted rate. Sea water/ saline water shall not be used for hydro testing and contractor shall arrange potable water for hydro testing at no extra cost. Suitable corrosion inhibiters should be added and temporary gasket shall be used at all flange joints and quoted rate shall be inclusive of rate of supply for above items.Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections,installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items.The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths.The rates does not cover stress releaving, radiography/ Ultrasonic/ DP testsThe pay quantity shall be the actual centreline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required . Payment for the work done will be made only when the piping is properly located and permenantly supported in its final positionin the field after hydrotesting.MATERIAL:CS, B36.10, API 5L Gr.B,SMLSCS PIPE,B36.10, API 5L Gr.B,SMLS, BW,50 NB,SCH 40 |
| 53 | The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including,steam/condensate manifolds together with attached fittingsThe work shall include transporatation from owners storage point, handling, rigging, scaffolding, placing and alignment of pipe and fitting into their respective positions and on to their respective supports, hydro test, painting as per the engineering specifications provided.Fabrication and Erection of trunnion supports, installation of special items like bellows, strainers, traps,fabrication and erection of spacers etc. are also included in this rate. Hydraulic/Pnematic testing of the piping systems, flushing draining and drying up shall also be included in the quoted rate. Sea water/ saline water shall not be used for hydro testing and contractor shall arrange potable water for hydro testing at no extra cost. Suitable corrosion inhibiters should be added and temporary gasket shall be used at all flange joints and quoted rate shall be inclusive of rate of supply for above items.Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections,installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items.The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths.The rates does not cover stress releaving, radiography/ Ultrasonic/ DP testsThe pay quantity shall be the actual centreline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required . Payment for the work done will be made only when the piping is properly located and permenantly supported in its final positionin the field after hydrotesting.MATERIAL:CS, B36.10, API 5L Gr.B,SMLSCS PIPE,B36.10, API 5L Gr.B,SMLS, BW,100 NB,SCH 80 |
| 54 | The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including,steam/condensate manifolds together with attached fittingsThe work shall include transporatation from owners storage point, handling, rigging, scaffolding, placing and alignment of pipe and fitting into their respective positions and on to their respective supports, hydro test, painting as per the engineering specifications provided.Fabrication and Erection of trunnion supports, installation of special items like bellows, strainers, traps,fabrication and erection of spacers etc. are also included in this rate. Hydraulic/Pnematic testing of the piping systems, flushing draining and drying up shall also be included in the quoted rate. Sea water/ saline water shall not be used for hydro testing and contractor shall arrange potable water for hydro testing at no extra cost. Suitable corrosion inhibiters should be added and temporary gasket shall be used at all flange joints and quoted rate shall be inclusive of rate of supply for above items.Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections,installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items.The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths.The rates does not cover stress releaving, radiography/ Ultrasonic/ DP testsThe pay quantity shall be the actual centreline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required . Payment for the work done will be made only when the piping is properly located and permenantly supported in its final positionin the field after hydrotesting.MATERIAL:CS, B36.10, API 5L Gr.B,SMLSCS PIPE,B36.10, API 5L Gr.B,SMLS, BW,200 NB,SCH 80 |
| 55 | The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including,steam/condensate manifolds together with attached fittingsThe work shall include transporatation from owners storage point, handling, rigging, scaffolding, placing and alignment of pipe and fitting into their respective positions and on to their respective supports, hydro test, painting as per the engineering specifications provided.Fabrication and Erection of trunnion supports, installation of special items like bellows, strainers, traps,fabrication and erection of spacers etc. are also included in this rate. Hydraulic/Pnematic testing of the piping systems, flushing draining and drying up shall also be included in the quoted rate. Sea water/ saline water shall not be used for hydro testing and contractor shall arrange potable water for hydro testing at no extra cost. Suitable corrosion inhibiters should be added and temporary gasket shall be used at all flange joints and quoted rate shall be inclusive of rate of supply for above items.Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections,installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items.The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths.The rates does not cover stress releaving, radiography/ Ultrasonic/ DP testsThe pay quantity shall be the actual centreline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required . Payment for the work done will be made only when the piping is properly located and permenantly supported in its final positionin the field after hydrotesting.MATERIAL:SS, B36.19, A312 TP304L,SMLSSS PIPE, B36.19, A312 TP304L,SMLS, BW,150 NB,SCH 40S |
| 56 | The work under this item covers all operations necessary to complete a flanged joint andshall include transportation from owners storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final aligment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. Welding of flanges are excluded from this rate and they will be paid as per schedule A. The pay quantity for the items shall be number of pairs of flanges actually completed.FLANGE, B16.5,50 NB |
| 57 | The work under this item covers all operations necessary to complete a flanged joint andshall include transportation from owners storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final aligment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. Welding of flanges are excluded from this rate and they will be paid as per schedule A. The pay quantity for the items shall be number of pairs of flanges actually completed.FLANGE, B16.5,100 NB |
| 58 | The work under this item covers all operations necessary to complete a flanged joint andshall include transportation from owners storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final aligment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. Welding of flanges are excluded from this rate and they will be paid as per schedule A. The pay quantity for the items shall be number of pairs of flanges actually completed.FLANGE, B16.5,150 NB |
| 59 | The work under this item covers all operations necessary to complete a flanged joint andshall include transportation from owners storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final aligment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. Welding of flanges are excluded from this rate and they will be paid as per schedule A. The pay quantity for the items shall be number of pairs of flanges actually completed.FLANGE, B16.5,200 NB |
| 60 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedGate Valve , SW,CS ,SIZE : 20 NB |
| 61 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedGate Valve , SW,SS ,SIZE : 20 NB |
| 62 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedGate Valve , FLG,CS ,SIZE : 50 NB |
| 63 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedGate Valve , FLG,CS ,SIZE : 100 NB |
| 64 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedGate Valve , FLG,SS ,SIZE : 150 NB |
| 65 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedGate Valve , FLG,CS ,SIZE : 200 NB |
| 66 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedGlobe Valve , FLG,SS ,SIZE : 150 NB |
| 67 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedPSV, SW, CS,SIZE(NB) : 50 x100 |
| 68 | The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps, strainers etc. in the piping at all elevations. The work shall include transporatation from owners storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operationg conditions. The rate is applicable for all matls, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per above schedules.Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operationg mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed.The pay quantity shall be the no of items installedControl Valve , FLG, SS,SIZE : 150 NB |
| 69 | Common description for tests------------------------------------------Radiography / Ultrasonic / Dye penetrant / Magnetic Particles TestsRadiographic, ultrasonic, DP/MP inspection of the weld joints shall be conducted as per the code, specs. Drawings & instruction of the Engineer-in-charge. However the extent of inspection (%) shall be as per attached document REF:25ES205The rate quoted shall be inclusive of all operations necessary to fulfill the work of radiography (x-ray / gamma ray) ultrasonic, DP/MP tests including all tools / tackles, films, chemicals etc. complete. After testing, if any joint is found defective, the same shall be rectified and re-tested free of cost.The pay quantity shall be linear centimeters of weld successfully passed.-----------------------------------------------------------------------------------------------------Test : Radiographic Inspection |
| 70 | Common description for tests-----------------------------------------Radiography / Ultrasonic / Dye penetrant / Magnetic Particles TestsRadiographic, ultrasonic, DP/MP inspection of the weld joints shall be conducted as per the code, specs. Drawings & instruction of the Engineer-in-charge. However the extent of inspection (%) shall be as per attached document REF:25ES205The rate quoted shall be inclusive of all operations necessary to fulfill the work of radiography (x-ray / gamma ray) ultrasonic, DP/MP tests including all tools / tackles, films, chemicals etc. complete. After testing, if any joint is found defective, the same shall be rectified and re-tested free of cost.The pay quantity shall be linear centimeters of weld successfully passed.----------------------------------------------------------------------------------------------------Tests : DP / MPTEST |
| 71 | FABRICATION AND ERECTION OF STRUCTURAL SUPPORTSSupply of material, transporataion, cutting, edge preparation drilling, threading, welding andfixing of structurals supports at all elevations and chipping and grouting as required and clamping /bottling/fixing of pipeline (including the cost of sand, cement, MS plates ,chemical bolts & Structurals).Fabrication of supports such as bare pipe guide,resting shoe, guide shoe etc.including supply of materials. Refer typical support details attached |
| 72 | Supply and application of Primers/Finish Paints over pipes, valves, fittings, specials, etc.as per attached specifications, standards, drawings and instructions from the site in charge. The external surfaces of prefabricated piping sections together with attached fittings shall be cleaned by mechanical means such as mechanical wire brushes. The unit of measurement for Painting of pipeline shall be Running Meters along centreline (includes all on line fittings, valves & instr. tapping up to first isolation). Markings shall be as per the painting specification attached.Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made.150NB( insulated line:only primer, refer painting spec.) |
| 73 | Supply and application of Primers/Finish Paints over pipes, valves, fittings, specials, etc.as per attached specifications, standards, drawings and instructions from the site in charge. The external surfaces of prefabricated piping sections together with attached fittings shall be cleaned by mechanical means such as mechanical wire brushes. The unit of measurement for Painting of pipeline shall be Running Meters along centreline (includes all on line fittings, valves & instr. tapping up to first isolation). Markings shall be as per the painting specification attached.Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made.200NB( insulated line:only primer, refer painting spec.) |
| 74 | Supply and application of Primers/Finish Paints over pipes, valves, fittings, specials, etc.as per attached specifications, standards, drawings and instructions from the site in charge. The external surfaces of prefabricated piping sections together with attached fittings shall be cleaned by mechanical means such as mechanical wire brushes. The unit of measurement for Painting of pipeline shall be Running Meters along centreline (includes all on line fittings, valves & instr. tapping up to first isolation). Markings shall be as per the painting specification attached.Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made.50NB |
| 75 | Supply and application of Primers/Finish Paints over pipes, valves, fittings, specials, etc.as per attached specifications, standards, drawings and instructions from the site in charge. The external surfaces of prefabricated piping sections together with attached fittings shall be cleaned by mechanical means such as mechanical wire brushes. The unit of measurement for Painting of pipeline shall be Running Meters along centreline (includes all on line fittings, valves & instr. tapping up to first isolation). Markings shall be as per the painting specification attached.Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made.100NB |
| 76 | Supply and application of Primers/Finish Paints over pipes, valves, fittings, specials, etc.as per attached specifications, standards, drawings and instructions from the site in charge. The external surfaces of prefabricated piping sections together with attached fittings shall be cleaned by mechanical means such as mechanical wire brushes. The unit of measurement for Painting of pipeline shall be Running Meters along centreline (includes all on line fittings, valves & instr. tapping up to first isolation). Markings shall be as per the painting specification attached.Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made.200NB |
| 77 | Pipelines: Supply and application of hot insulation.Running metres thru centerline ( includes all on-line pipe fittings, valve lengths andin-strument tappings upto first isolation valve ). Any on-line reducer shall be included in the higher size. For branches, the measurement shall be from surface of bigger / main pipe.HOT INSULATION(IH),Line size:150 NB,Insulation Thk: 10MM |
| 78 | Pipelines: Supply and application of hot insulation.Running metres thru centerline ( includes all on-line pipe fittings, valve lengths andin-strument tappings upto first isolation valve ). Any on-line reducer shall be included in the higher size. For branches, the measurement shall be from surface of bigger / main pipe.HOT INSULATION(IH),Line size:200 NB,Insulation Thk: 20MM |
| 79 | Flanges : supply and application of hot insulation no. of boxes ( one box per flange joint )Number of flange joints-IH,Line size : 150NB,Insulation Thk: 10MM |
| 80 | Flanges : supply and application of hot insulation no. of boxes ( one box per flange joint )Number of flange joints-IH,Line size : 200NB,Insulation Thk: 20MM |
| 81 | Valves : supply and application of hot insulation per valve in nos.Number of flanged valves-IH,Line Size: 150NB,Insulation Thk : 10MM |
| 82 | Valves : supply and application of hot insulation per valve in nos.Number of flanged valves-IH,Line Size: 200NB,Insulation Thk : 20MM |
| 83 | Lumpsum cost for the erection of RLNG Pre-Heater (E-702) at the site as per FACT- UC requirements. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail