Design,Manufacture, Supply,Transport, Installation,Testing And Commissioning With 5 Years Comprehensive Maintenance Contract (Cmc) Of 450 Kwp Grid Connected Solar Photovoltaic (Spv) System (Net Meter)At Gandheli Dairy Plant,Gut No.97 On Turnkey Basis , Part (A) :Design & Supply Of The Following: , A.1-- Spv System Complete With Pv Modules (Minimum 590 Wp Topcon Cell) Installed In Array With Modular Mounting Structure (Mms) Complete On Ground As Per Site Requirements.Capacity/ Size-- 450Kw , A.2--Invertor Complete With Safeties & Protection Capacity/ Size--200 Kw , A.3--Solar Meter & Ct With Testingcapacity/ Size--As Per Site Requirement , A.4-- Dc Cables (6 Sq. Mm, Copper), Cable Trays, Supports, Conduits Etccapacity/ Size-- As Per Site Requirement , A.5-- Ac Cable - (Size As Per Sld)(Copper Conductor, Gi Armoured, Xlpe/Hr Pvc Insultaed, 1.1 Kv Grade Cable., - Length Shall Be As Per Site Requirement Between Inverter To Ac Isolatorbox, Including Cable Trays In Buildings & Outside Buildings, Necessary Ms Supports, Etc As Per Site Requirement. Capacity/ Size-- , A.6-- Ac Cable For Solar Pv System - (Size As Per Sld), Aluminium Conductor, Gi Armoured Xlpe/Hr Pvc Insultaed, 1.1 Kv Grade Cable., - Total Length (Tentative Cable Route Shown In Site Layout) As Per Site Requirement Between Each Inverter Isolator Box To Lt Power Distribution Panel And Existing Lt Pcc , Including Cable Trays In Buildings & Outside Buildings, Necessary Ms Supports, Etc As Per Site Requirement.Capacity/ Size--As Per Site Requirement , A.7-- Chemical Earthing System, With Solid Copper Bonded Rods (Minimum 250 Microns Coating Thickness), Copper Earth Strips, Copper Earth Electrodes,Lightning Arrestor Etc.Capacity/ Size--As Per Site Requirement , A.8--Remote Monitoring System, Weather Station (Solar Irradiation Sensor, Wind Velocity Meter, Ambient Temperature Sensor)As Per Site Requirement , A.9-- Bidirectional Meter And Solar Check Meter (11 Kv) With Ct, Pt Units As Per Local Electricity Board Requirement. Necessary Testing & Liaison With Msedcl/ Ceig /Meda And Obtaining Approvals Are Included In The Scope Of Work.Capacity/ Size--As Per Site Requirement , A.10-- Spares, Tools, Meterscapacity/ Size-- , Part (B) : Installation, Testing And Commissioning , B.1-- Spv System Complete With Pv Modules (Minimum 590 Wp Topcon Cell) Installed In Array With Mms Complete On Ground As Per Site Requirements.Capacity/ Size--450Kw , B.2--Invertor Complete With Safeties & Protectioncapacity/ Size--200 Kw , B.3-- Solar Meter & Ct With Testingcapacity/ Size--As Per Site Requirement , B.4-- Dc Cables (6 Sq. Mm, Copper), Cable Trays, Supports, Conduits Etc As Per Site Requirement. Capacity/ Size-- , B.5-- Ac Cable - (Size As Per Sld)(Copper Conductor, Gi Armoured, Xlpe/Hr Pvc Insultaed, 1.1 Kv Grade Cable., - Length Shall Be As Per Site Requirement Between Inverter To Ac Isolator Box, Including Cable Trays In Buildings & Outside Buildings, Necessary Ms Supports, Etc As Per Site Requirement. Capacity/ Size-- As Per Site Requirement , B.6-- Ac Cable For Solar Pv System - (Size As Per Sld), Aluminium Conductor, Gi Armoured Xlpe/Hr Pvc Insultaed, 1.1 Kv Grade Cable., - Total Length (Tentative Cable Route Shown In Site Layout) As Per Site Requirement Between Each Inverter Isolator Box To Lt Power Distribution Panel And Existing Lt Pcc , Including Cable Trays In Buildings & Outside Buildings, Necessary Ms Supports, Etc As Per Site Requirement.Capacity/ Size-- , B--7 Chemical Earthing System, With Solid Copper Bonded Rods (Minimum 250 Microns Coating Thickness), Copper Earth Strips, Copper Earth Electrodes, Lightning Arrestor Etc. Capacity/ Size-- As Per Site Requirement , B--8 Remote Monitoring System, Weather Station (Solar Irradiation Sensor, Wind Velocity Meter, Ambient Temperature Sensor)Capacity/ Size-- , B--9 Bidirectional Mete R And Solar Check Meter (11 Kv) With Ct, Pt Units As Per Local Electricity Board Requirement. Necessary Testing & Liaison With Msedcl/ Ceig /Meda And Obtaining Approvals Are Included In The Scope Of Work.Capacity/ Size-- As Per Site Requirement , B.10-- Civil Works Complete – Like Pile Foundation, Construction Of Invertor Room, Path Way, Putting Gravels Grouting Of Bolts/Structural Members, Breaking Of Wall /Floor Slab, Cut-Outs Making, Finishing, Painting, Support Etc Required For The Spv System Is Included In The Scope Of Work.Capacity/ Size-- , Note-- Please Refer The Technical Specification Mention In The Tender Documents For Detailed List For Comprhensive Boq