| 1 | Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge. |
| 2 | Excavation for catch / side water gutter in Hard murum strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. |
| 3 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)a)80 mm Metal, By breaking Boulders (Hand broken). |
| 4 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)(a)40 mm Metal, By breaking Boulders (Hand broken). |
| 5 | Supplying soft murum at the road site, including conveying and stacking complete. |
| 6 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. |
| 7 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . |
| 8 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 9 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. |
| 10 | Compacting the sub grade/gravel/oversize metal (100 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. |
| 11 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. |
| 12 | Providing and constructing 75 mm. thick ModifiedPenetraction Macadam (MPM)road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30%crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying thebitumen of VG-30 grade @ 2 kg / sqm , spreading 12mm size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of VG 10 grade bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 13 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 14 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 15 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials & bitumen of VG-30 gradepreparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. |
| 16 | Excavation for foundationin earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directedetc. complete. By Manual Means [A] Upto 1.50mtr. Lift, Normal rate |
| 17 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete |
| 18 | Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc., having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. |
| 19 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.146 Dt.04 June ,2021. States that the royalty charges ofRs.211.95/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor. ROYALTY CHARGES FOR SAND |
| 20 | TEST REPORT Sieve Analysis |
| 21 | BITUMENPenetration, Softening Point, Flash & Fire Point, Specific Gravity. |
| 22 | Add G.S.T. 18 % FOR COST OF WORK |
| 23 | ADD FOR INSURANCE 0.50 % |