Tender For Restoration Of Rajwah Sarawa From Km 0.000 To Km 22.800 And Demarcation Of Canal Land In Bulandshahr District. - CC Lining in canal 2 Earth work in foundationin dryinordinary soil including ramming and dressing the surface ,including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. 3 Provide shuttering and centering including all materials and T&P etc for proper complition of work. 4 C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4includingcost of all material,labour T&P etc. and Shuttering required for proper completion of work. 5 Supplying /fillingLocal Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work. 6 LayingL.D.P.E. film i/c cost of scaffolding labour & t&P etc. 7 60 MM. Thick Liningin M20 (1:1.5:3) in bed and side slopeincluding cost of all material,labour T&P etc. and Shuttering required for proper completion of work 8 Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work 9 C.C lining in u/s and d/s of v.r.b/d.r.b of sarawa dy. 10 Earth work in foundationin dryinordinary soil including ramming and dressing the surface ,including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. 11 Provide shuttering and centering including all materials and T&P etc for proper complition of work. 12 C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4includingcost of all material,labour T&P etc. and Shuttering required for proper completion of work. 13 Supplying /fillingLocal Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work. 14 LayingL.D.P.E. film i/c cost of scaffolding labour & t&P etc. 15 60 MM. Thick Liningin M20 (1:1.5:3) in bed and side slopeincluding cost of all material,labour T&P etc. and Shuttering required for proper completion of work 16 Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work 17 Construction of Outlets at Right Bank and left Bank of sarawa Dy 18 Excavation in foundation in ordinary soil (lome,clay or sand) including lift upto 1.50M and lead upto 30M. And including filling watering and ramming of Excavated earth ito trenches or into the space between the building and the side of foundation treches or into the plinth and removal and disposal of surplus earth upto a distence of 30M. from the trenches as ditected by the Engineer-in-Charge. 19 Providing & Laying cement concrete in foundation 1:3:6 stone grit, sand including supply of all material, labour, tools and plants etc 20 Brick work in M-150 Brick 1:4 cement and coarse sand f.m of 2.20 (1 cement :4 C/A) mortar in foundation, plinth level & Super structure including supply of all materials,labour and T&P .required for proper complition 21 Providing and fixing of 150/110 mm Diameter HDPE pressure pipe @6kg/sqm in required length as per site and complete the work all as specified and as directed by Engr-in-Charge. 22 Struck deep cement pointing in 1:2 CM incl cost of material & labour T&P etc 23 Providing & Laying cement conc in floring or copping of wall etc. in proportion of 1:2:4 using 10-20 mm stone gritincluding cost of all materials, labour, T&p, etc. required for proper completion of work. 24 Painting work on cemented or brick surface one prime coat and one coat of dry distemper in new surface incl. all material & labour etc. 25 Construction of Boundary Pillars of sarawa Dy.( 458 Nos) 26 Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. 27 Providing & Laying cement concrete in foundation(1:2:4) stone grit, incl fixing of poles etc.sand including supply of all material, labour, tools and plants etc 28 P/F Ordinary centering & shuttering for RCC &CCworks including all labour T&P etc.required for proper completion of work. 29 Providing & Laying R.C.C. M-20 1:1.5:3nominal mix with cement coarse sand and stone agg i/c all cost of material labour T&P etc. 30 Steel Reinforcement for RCC work i/ccost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work 31 Painting of RCC precast boundry pillars of size 250mm x250mm x 900 mm including cost of material & labour and T&P etc. and writing letters including cost of material upto 15 cm height 32 Approach ramp on both side of v.r.b /d.r.b of sarawa dy. 33 Earth workin embankment in ordinary soil excavation to be in the of regular pits and earth work in embankment to be in 20 cm. layers. Including ramming and dressinig the surface to the required levels and slopes and also including 1.50 m. lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank whithin 30 m. distances as directed by Engineer-in-charge. 34 Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8) depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. 35 Construction of Brick soling on service road of sarawaDy. M.G.C Stage-I 36 Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8) depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work.. 37 Maintenance work of Cattle Ghat of sarawa Dy. Madhya Ganga Canal Ist Stage 38 Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches 39 Providing & Laying cement concrete in foundation 1:3:6 stone grit, sand including supply of all material, labour, tools and plants etc 40 Brick Work with M-15 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work. 41 Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work. 42 Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8) depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. 43 Repair ofVRB/DRB of Sarawa Dy. atKm. 0.000 to Km. 22.800. For MGC Ist Stage 44 Ist class Brick Work in 1:4 CM M-150 Brick including cost of all Materials, labour] T&P etc. required Proper completion of work 45 Struck Deep Cement pointing in 1:2 CM on suraface including cost of all Materials, labour] T&P etc. required Proper completion of work 46 One prime coat and one coat of dry distemper of new work including supply all material labour T&P etc required for proper completion of work 47 Providing and fixing of hazard maker including cost of all materias, labour, t&p etc. per VRB 48 Painting and printing letters upto 30cm hight including supply all material labour T&P etc. required for proper complition of work. at VRB