| 1 | Repairs to Dismantling and taking down in repairs to unserviceable PS plates fromexisting 9600 Gallons PS water overheadtank installed at40/50 feet height staging by dismantling and taking down in repairs to unserviceable PS plates, disconnecting pipeline connection carefullyby cutting , unscrewing nuts & bolts etc and refixing the same with existing serviceable plate/new plate of size 1.25 m x 1.25 m x 6 mm , painting the tank after repair work with 2 coats of aluminium paint outside the tank incl staging(staging painted by black synthetic enamel paint both side) top to bottom and two coats of lead free black bituminous paint inside the tank (suitable for storage of drinking water) and scraping smoothly by scraper & sandpaper to remove all loose paints, scales, rust and restoration of pipe lines, lettering with white synthetic enamel paint over the black painted surfaces of indicated plates(i.e. capacity of tank, date of cleaning etc) complete all as directed. Note :- (a) The cost for the refixing of old serviceable PS plate & pipeline connections in new or old positions with necessary GI fittings, flanges and jointing materials to make the joint leak proof. etc includes in the unit rate quoted by the firm. (b) New Plates shall be measured and paid separately.(c) The PS tank shall be painted with two coats of alluminium paint out side incl staging and two coats of black bituminous (lead free) paint inside complete, Cost of staging/working platform & painting (inside / outside) invoived shall be deemed to be included in the unit rate quoted. |
| 2 | Supply, fiixing, testing and commissioning pressed steel plates in repair of size 1.25 m x 1.25 m x 6 mm thick on existing PS OH Tank installed on 40\" to 50\" height staging with required number of holes on the plates according to existing plate of PS tank incluiding all necessary joining materials i.e. lead wire, tape, lead wool, gasket, putty/jointing compound, new machine made bolts, nuts, washers, MS cleat etc of required size to make the joining portion absolutly leak proof complete including painting of two coats of lead free black bituminous paint suitable for storage of drinking water internally and two coats of Alluminium paint over one coat of red oxide zink chrome primer externally including preparation of surface and refixing/reconnecting of existing pipe line connection, complete all as specified and as directed. (Note : cost of staging/working platform involved shall be deemed to be included in the unit rate quoted.) |
| 3 | M&L in Repairing and making leak proof joints of plates in position by loosing the jointing bolts, unscrewing jointing materials such as lead wire/tapes, lead wool gasket, bituminous compound and replacing with new matching machine made bolts, nuts, washers bituminous compound suitable for potable water and MS cleats wherever required complete all as specified and as directed by Engr-in-Charge. |
| 4 | Opening of top and bottom cover of pressure feed type filtration plant 5000 to 10000 gallons capacity per hours, taking out old filter media including old strainer etc and removing and depositing at nearest dump all as specified and directed by Engineer-in-Charge. |
| 5 | Scraping and cleaning the surface bed, inner and outer surfaces of the Iron Removal Plant shell for complete removal of scales, rust, old paint etc and painting with two coats of anti corrosive bituminous paint (lead free) suitable for storage of potable water (for internal surfaces) and two coats of aluminium paint for external surfaces and two coats of synthetic enamel paint with connected valves, frontel pipes as per colour codeand write (size of lettering 65 mm height) on indicated space ie. DATE OF CHANGING FILTER MEDIA............., CAPACITY OF TANK ..........., MES NO ............, SM No........etc. in white synthetic enamel paint over black back ground synthetic enamel paint of 10000 gallons capacity filtration plant complete all as specified and directed by Engineer-in-Charge. |
| 6 | S&F in repairs strainer, PP/LDPE double deck type PP (3/8\" or 1/2\"), suitable for filtration plant, complete all as specified and as directed. |
| 7 | Supplying and charging in layers special coarse sand (Barakar sand) suitable for use in filtration plant ofsizes 1/8\" x 1/16\" mesh, complete all as specified and as directed. |
| 8 | All as per item No- 7 (here in before) but for 1/16\"\" x 1/24\"\" mesh, complete all as specified and as directed. |
| 9 | Supplying and charging in layers new washed, cleaned, dust free graded gravels filter media suitable for use in filtration plant of size 20 mm to 40 mm, complete all as specified and as directed.Note:- (i) Before charging of filter media contractor shall carry out raw water testing for all parameters. (ii) After completion of the change of filter media the treated wateris to be send for water testingfor all parameters with in 10 days.(iii) All testing connected with water, should be done from Govt/Govt approved laboratory. (iv) The water testing cost is deemed to be included in quoted rate. |
| 10 | All as per item No-9 here in before but of size 12 mm to 20 mm, complete all as specified and as directed |
| 11 | All as per item No-9 here in before but of size 6 mm to 12 mm, complete all as specified and as directed |
| 12 | All as per item No-9 here in before but of size 3 mm to 6 mm, complete all as specified and as directed |
| 13 | Supply and charging in layers Manganese dioxide(MnO2) of approximate sizes 20 mm to 25 mm containing at least 65% of manganese, suitable for use in filtration plant complete all as specified and as directed by Engineer-in-Charge. Make:- RMCO/Blue stone / Global Absorbent, Note:- Samples of raw material (MnO2) should be got tested in Govt approved laboratory before using in the oxidation chamber for determining the MNO2 purity, which shall not be less than 65% ((MNO2 contents minimum 65% purity), testing charge for the same is deemed to be included in the cost quoted by the contractor. |
| 14 | S&F in repairs butterfly valve of 100 mm bore including taking out old butterfly valve, complete all as specified and as directed. |
| 15 | S&F in repairs butterfly valve of 80 mm bore including taking out old butterfly valve, complete all as specified and as directed. |
| 16 | Material and labour for cleaning, desludging and removing of all scales and dirt from internal surface ofOH Pressed Steel Tank of capacity 9600 gallons installed at height of 40\" staging by scraping withbrush, rubbing down scales, iron ppt, rusty scales etc and washing with clear water using bleaching powder/caustic soda and taking all rubbish from the tank and removing the same to outside land at a safe distance and applying filling compound to fill joint gap internallycomplete all as directed and specified.NOTE:- (a) Cost of staging/working platform involved shall be deemed to be included in the unit rate quoted.(b) Consumption of bleaching powder for cleaning of each tank shall not be less than 12 Kg(c) Maximum two times cleaning of each tank in entire contract period (Measured separately each time). |
| 17 | Material and labour for cleaning, desludging and removing of all scales and dirt from external surface ofOH Pressed Steel Tank of capacity 9600 gallons installed at height of 40\" stagingby complete removal of old paint / rust by applying detergent and scrapping /wire brushing / sand papering and washing with clear water and painting of external surface of PS OH tank complete with two coats of aluminium paint over a coat of red oxide primer including painting of structure , sluice valve and connected all pipe lines (rising mains and delivery lines) from tank as per colour coding and write (size of lettering 75 mm height) on indicated space at a height 3.5 mtr from ground level(ie. DATE OF CLEANING................, CAPACITY OF TANK ..................etc.) in black synthetic paint over white synthetic enamel paint all as directed and specified.NOTE:- (a) Cost of staging/working platform involved shall be deemed to be included in the unit rate quoted.(b) Work shall be carried out in safety norms and all safety shall be provided by the contractor and no extra claim shall be admissible at later stage. |
| 18 | Cleaning of internal surface of RCC overhead reservoir of 1,00,000 gallon capacity at 18 metre height staging by scraping with wire brushes, rubbing down scale, dirt, sludge etc and washing with clear water using bleaching powder/caustic soda and taking all rubbish from the reservoir and removing from the reservoir and removing the same to a distance not exc 50 mtr and write (size of lettering 75 mm height) on indicated spaceat a height 3.5 mtr from ground level (ie. DATE OF CLEANING................, CAPACITY OF TANK ..................) in black synthetic paint over white synthetic enamel paintall as directed.Note:- (a) Cost of staging/working platform involved shall be deemed to be included in the unit rate quoted.(b) Consumption of bleaching powder for cleaning of each tank shall not be less than 20 kg for 1,00,000 gallon capacity,15 kg for 50,000 gallon capacity and 12 Kg for 25000 gallon capacity.(c) Maximum two times cleaning of each tank in entire contract period. (Measured separately each time) |
| 19 | All as per item No-18 here in before but for 25,000 gallon capacity, complete all as specified and as directed |
| 20 | S&F in repairs of 3 Plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachment MS sheet cover plate with locking arrangement fixed at any position of PS overhead tank installed on 40\" to 50\" height staging including necessary welding, jointing materials to make the jointing portion absolutely leak proof complete all as specified and as directed. |
| 21 | Labour only for cleaning of sedimentation tank of capacity 40,000 gallon including removal/taking out of sludge, cleaning of side wall by jute with necessary bleaching powder, complete all as specified and as directed.Note:- (a) Consumption of bleaching powder for cleaning of each tank shall not be less than 20 kg and is included in unit rate quoted.(b) Maximum two times cleaning of each tank in entire contract period (Measured and paid separately each time). |
| 22 | Labour only for cleaning of under ground sump of capacity 20,000 gallon, including removal / taking out of sludge, cleaning of side wall by jute with necessary bleaching powder, complete all as specified and as directed.Note:- (a) Consumption of bleaching powder for cleaning of each tank shall not be less than 12 kg and is included in unit rate quoted.(b) Maximum two times cleaning of each tank in entire contract period (Measured and paid separately each time). |
| 23 | Supply , lowering & jointing in repairs GI pipesISI marked, 150 mm dia, 3 meter long heavy grade, 6.0 mm wall thickness, including flagecomplete with nuts, bolts, washers & rubber gasket including groove for cable entry systemcomplete all as specified and directed. |
| 24 | Supply , lowering & jointing in repairs GI pipesISI marked, 100 mm dia, 3 meter long heavy grade, 6.0 mm wall thickness, including flagecomplete with nuts, bolts, washers & rubber gasket including groove for cable entry systemcomplete all as specified and directed. |
| 25 | Supply , lowering & jointing in repairs GI pipesISI marked, 80 mm dia, 3 meter long heavy grade, 6.0 mm wall thickness, including flagecomplete with nuts, bolts, washers & rubber gasket including groove for cable entry systemcomplete all as specified and directed. |
| 26 | M&L in replacement MS cleat thickness 10mm suitable for connecting Over head tank PS plate complete all as specified and directed by Engr in charge. |
| 27 | Pumping out raw sewage water using pump sets diesel engine driven from sewage plant installation for cleaning (removal of sludge and silt) of the installation including blocking flow of sewage from nearby manhole etctill the each individual job is completed for Under ground sewage sump well of size internal dia 5.20m and depth 5.30m sewage well, for 08 (Eight ) hours per day minimum and disposal of the same through proper pipelines to a distance not less than 150 mtr from the installation for following:- Notes:- (i) Removal and desludging will be measured and paid under srl item No. 26 hereinafter. Thedesludging/de-watering shall be done one time only in the interval of minimum 06 months, if pumping required at site more than one time will be done by prior written approval of Engineer-in-charge.(ii) Diesel engine pump & other T & P including fuel will be arranged by contractor under his own arrangements. |
| 28 | S&F in replecment of Framed brackets of angles or tees with web and flanges cut to shape, drilled and countersunk for screw, Nut bolt and whaser including bending and welding angles, as necessary, gusset plates, riveting, etc.. n exc 10 kg each brackets, conforming to Fe.290.Gde-E-165 (Brackets over 10 kg each to be measured under \"Structural Steel complete all as specified and directed. |
| 29 | S&F in replecment of Framed brackets of angles or tees with web and flanges cut to shape, drilled and countersunk for screw, Nut bolt and whaser including bending and welding angles, as necessary, gusset plates, riveting, etc.. n exc 10 kg each brackets, conforming to Fe.290.Gde-E-165 (Brackets over 10 kg each to be measured under \"Structural Steel complete all as specified and directed. |