| 1 | Dismentling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the engineer-on-charge with in a distance of 60m.( SI No.692/2022) |
| 2 | Concrete with 4cm. gauge stone ballast, coarse sand of 2.20 F.M and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion of the work. (S.I. No. 281/2022) |
| 3 | RCC work with cement, approved Coarse sand and 40mm stone grit in proportion of 1:1.5:3 in raft and foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire. (S.I. No. 287a/2022) |
| 4 | R.C.C. work with cement approved corsand & 2 cm gauge stone grit in proportion of 1:1.5:3 in slab Excluding supply of reinforcement and its bending, but including its fixing and binding the same waith 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (S.I. No. 284(a)/2022) |
| 5 | M.S (Tor steel or plain) work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping shall be measured and including cost of binding wire (S.I. No. 504/2022) A.R. |
| 6 | Construction of granular sub-base by providing coarse graded material, sperading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Grade-I) (Ref. to Mort&H Specification No. 401) (A.R) |
| 7 | Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in cc pavment (thickness as per design) cement coarse & fine aggregate confirming to IS standred mixed inconcrete mixer/plant of not less than 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed from work(steel channel) laying & fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work spreding the concrete with shovles. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavments for not less then 14 days, curing compound (Where specified) and water finishing to lines and gradeincludings supply of all materials, labour Tools &plants etc. required for proper completion of work andalso includin complete shifting of Recron 38 fibre reinforcement materials etcl & concrete etc S.I. No. New Item 9/2022 |
| 8 | Cartage of Ballast, Kankar, Coal, Grit or Sand etc. including loading & unloading but excluding stackings on pucca roads (SI No. 231a/2022) up to 5 km Distance |
| 9 | S/F of sign Marble board (Pre Approved Rate) |