| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 M lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 M from the foundation trenches. (S.I. No. 251a) /2022 |
| 2 | Concrete with 4cm. gauge brick ballast, coarse sand of 2.20 F.M and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion of the work. |
| 3 | RCC work with cement, approved Coarse sand and 40mm stone grit in proportion of 1:1.5:3 in raft and foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire. (S.I. No. 287a/2022) |
| 4 | R.C.C. work with cement approved corsand & 2 cm gauge stone grit in proportion of 1:1.5:3 in column Excluding supply of reinforcement and its bending, but including its fixing and binding the same waith 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (S.I. No. 289/(2022) |
| 5 | M.S (Tor steel or plain) work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping shall be measured and including cost of binding wire (S.I. No. 504/2022) A.R. |
| 6 | M-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in superstructure including supply of all material, labour T&P etc. required for proper completion of the work as per direction of the work as per direction of Engineer-in-charge.(SI. No.305a+310)/2022 |
| 7 | 12mm thick cement plaster with 1:4 cement and fine sand of 1.25 FM mortar over brick work minimum thickness not to be less than 1cm including supply of all material, labour, tools and plants etc, required for proper completion of the work as per direction of Engineer-in-charge. |
| 8 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18mm thick stone slab over 20mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as per specified and as directed by the Engineer-in-Charge. (D.S.R. 11.56.2) |
| 9 | S.S. Golden Letter( both side board). Bond No.MZDA-ENGGOBILL/8/2025-ENGG-MZDA(GIC) |
| 10 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes , channels , plates etc. , including welding , grinding , buffing , polishing and making curvature (wherever required ) and fitting the same with necessary stainless steel nuts and bolts complete , i / c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc. , of required size , on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer - in - charge , ( for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts , fasteners etc.) SOR 2022 10.27 (New Item) |