|
| 1 | ACE PHED II Jodhpur BSR 2020 |
| 2 | Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to storeas direction,receiving repaired / new pump set from store/ divisional store , testing the same, transportation tosite and lowering back into tube well along with submersible cable, lowering pipes,specials etc and commissioning of the tube well. The job also includes cable jointing,checking of discharge of pump set,interconnection of lowering pipe from nearby distribution pipe line,checking of starter and reporting for completion of Job or fault/problem if any. (Upto 20 Km distance run by lowering machine) |
| 3 | For three Phase pump set |
| 4 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 5 | 50 mm |
| 6 | 65 mm |
| 7 | 80 mm |
| 8 | HDPE Pipe Lowering Assembly of nominal dia |
| 9 | 63 mm |
| 10 | 75 mm |
| 11 | 90 mm |
| 12 | For singlePhase pump set |
| 13 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 14 | 32 mm |
| 15 | 50 mm |
| 16 | HDPE Pipe Lowering Assembly of nominal dia |
| 17 | 32 mm |
| 18 | 40 mm |
| 19 | 50 mm |
| 20 | Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set,reporting and transportation of pump set from tube well site to storeas per direction. |
| 21 | For three phase pump set |
| 22 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 23 | 50 mm |
| 24 | 65 mm |
| 25 | 80 mm |
| 26 | HDPE Pipe UnLowering Assembly of nominal dia |
| 27 | 63 mm |
| 28 | 75 mm |
| 29 | 90 mm |
| 30 | 32 mm |
| 31 | 50 mm |
| 32 | HDPE Pipe Lowering Assembly of nominal dia |
| 33 | 32 mm |
| 34 | 40 mm |
| 35 | 50 mm |
| 36 | Only lowering of the submersible pump setinto tube well along with submersible cable, lowering pipes depth up to 120 mtr,specials etc and commissioning of the tube well. The job also includes cable jointing,checking of discharge of pump set,interconnection of lowering pipe from nearby distribution pipe line,checking of starter and reporting for completion of Job or fault/problem if any. |
| 37 | For three phase pump set |
| 38 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 39 | 50 mm |
| 40 | 65 mm |
| 41 | 80 mm |
| 42 | HDPE Pipe Lowering Assembly of nominal dia |
| 43 | 63 mm |
| 44 | 75 mm |
| 45 | 90 mm |
| 46 | Add above item 3.1for depth above 120 mtr for each 10 mtr depth |
| 47 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. |
| 48 | For singlePhase pump set |
| 49 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 50 | 32 mm |
| 51 | 50 mm |
| 52 | HDPE Pipe Lowering Assembly of nominal dia |
| 53 | 32 mm |
| 54 | 40 mm |
| 55 | 50 mm |
| 56 | Add above item 1.1 for depth above 120 mtr for each 10 mtr depth |
| 57 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. |
| 58 | Increasing of lowering pipes intube wells including cost of nut bolts and rubber gaskets / jointing material and PVC rope and transporatation of cable and extra lowering pipe from store.. However submersible cable and extra lowering pipe shall be provided by the department at store. |
| 59 | For three phase pump set |
| 60 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia ( For incease up to 30 Mtr length of pipe) |
| 61 | 50 mm |
| 62 | 65 mm |
| 63 | 80 mm |
| 64 | HDPE Pipe Lowering Assembly of nominal dia |
| 65 | 63 mm |
| 66 | 75 mm |
| 67 | 90 mm |
| 68 | For singlePhase pump set |
| 69 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 70 | For Increase 2 nos.Assembly pipe |
| 71 | 32 mm |
| 72 | 50 mm |
| 73 | HDPE Pipe Lowering Assembly of nominal dia |
| 74 | For Increase 20 Mtr Assembly pipe |
| 75 | 32 mm |
| 76 | 40 mm |
| 77 | 50 mm |
| 78 | Add above item for depth above 20 mtr or two D/F pipe assembly for each 10 mtr depth |
| 79 | Add above item for distance run above 20 Km for each 5 Km distance run. |
| 80 | Unlowering of pump set along with lowering pipes and submersible cable with safety from Openwell For three Phase pump set having G.I double flanged/ HDPEpipe lowering asembly of size 50 mm to 80 mm, checking the pump set,reporting and transportation of pump set from tube well site to store. |
| 81 | Add above item for distance run above 20 Km for each 5 Km distance run. |
| 82 | Lowering of repaired/Newpump set alongwith lowering pipes and submersible cable with safety in Openwell For three Phase pump sethaving G.I double flanged/ HDPEpipe lowering asembly of size 50 mm to 80 mm. It includes receiving repaired / new pump set from store / Work shop with in boundry area of division and testing the same, transportation tosite and commissioning. |
| 83 | Add above item for distance run above 20 Km for each 5 Km distance run. |
| 84 | Repair Rewinding of Submersible motor includes full servicing and rewinding (wherever required) as per manufacturer\"s specification and to the satisfaction of Engineer Incharge. It includes the replacement of minor parts such as bushes (oil seal bush) Nut Bolts, washers, cable seal, gland ring, vent plug, water drain plug, etc. complete job |
| 85 | Up to 3 HP V-6 |
| 86 | Above 3HP to 5 HP V-6 |
| 87 | Above 5HP to 7.5 HP V-6 |
| 88 | Above 7-5 HP to 10 HP V-6 |
| 89 | Above 10 HP to 12.5 HP |
| 90 | V-6 |
| 91 | V-8 |
| 92 | Above 12.5 HP to 15 HP |
| 93 | V-6 |
| 94 | V-8 |
| 95 | Above 15 HP to 17.5 HP |
| 96 | V-6 |
| 97 | V-8 |
| 98 | Above 17.5 HP to 20 HP |
| 99 | V-6 |
| 100 | V-8 |
| 101 | Motor opening cable jointing & refitting charges when rewinding is not required. |
| 102 | V-6 |
| 103 | V-8 |
| 104 | Particulars of spare parts of submersible Motor |
| 105 | Providing & Replacement of G.M./S.S. Bushes for all types of motors (per set of 4Nos.) including cost of sleeves |
| 106 | V-6 |
| 107 | V-8 |
| 108 | Providing & Replacement of thrust bearing for all types of motor. It includes cost of all components connected with thrust bearing. |
| 109 | V-6 |
| 110 | V-8 |
| 111 | Replacement of thrust plate for all types of motors |
| 112 | V-6 |
| 113 | V-8 |
| 114 | Supply and fixing spare parts for repair of pump set including cost of opening refitting, servicing, and machining, if required. It also includes the cost of nut bolt, studs, washer packing, keys etc. complete. |
| 115 | Providing & fixing of GM neck rings parts on impeller. |
| 116 | Plain Type V-6 |
| 117 | Bowel typeV-6 |
| 118 | Plain Type V-8 |
| 119 | Bowel typeV-8 |
| 120 | Providing & Fixing of GM/SS bush per piece |
| 121 | Plain Type V-6 |
| 122 | Bowel typeV-6 |
| 123 | Plain Type V-8 |
| 124 | Bowel typeV-8 |
| 125 | Providing & replacement of G.M. Impeller |
| 126 | Plain Type V-6 |
| 127 | Bowel typeV-6 |
| 128 | Plain Type V-8 |
| 129 | Bowel typeV-8 |
| 130 | Providing & replacement of Nylon Impeller |
| 131 | Plain Type V-6 |
| 132 | Bowel typeV-6 |
| 133 | Plain Type V-8 |
| 134 | Bowel typeV-8 |
| 135 | Providing & fixing CI Diffuser/ guide vans per piece |
| 136 | V-6 |
| 137 | V-8 |
| 138 | Providing & fixing Gun metal Diffuser/ guide vans per piece |
| 139 | V-6 |
| 140 | V-8 |
| 141 | Providing & fixing Nylon Diffuser/ guide vans per piece |
| 142 | V-6 |
| 143 | V-8 |
| 144 | Providing & fixing Microlone Guide per piece |
| 145 | V-6 |
| 146 | V-8 |
| 147 | Providing & fixing of CI body per piece |
| 148 | Plain Type V-6 |
| 149 | Bowel typeV-6 |
| 150 | Plain Type V-8 |
| 151 | Bowel typeV-8 |
| 152 | Pump opening & fixing including machining & all finishing work for desired performance |
| 153 | Plain Type V-6 |
| 154 | Bowel typeV-6 |
| 155 | Plain Type V-8 |
| 156 | Bowel typeV-8 |
| 157 | Impeller welding & turning (if not replaced) |
| 158 | Plain Type V-6 |
| 159 | Bowel typeV-6 |
| 160 | Plain Type V-8 |
| 161 | Bowel typeV-8 |
| 162 | Repair Rewinding of single phase Submersible motor includes full servicing and rewinding (wherever required) as per manufacturer\"s specification and to the satisfaction of Engineer Incharge. It includes the replacement of bushes (oil seal bush) Nut Bolts, washers, cable seal set, cable gland ring, vent plug, water drain plug, etc. complete. |
| 163 | up to 2 HP V-4 |
| 164 | Above 2HP to 3 HP V-4 |
| 165 | Above 3HP to 4 HP V-4 |
| 166 | Providing and fixing of spare for Single Phase submersible motor. |
| 167 | Providing & Replacement of G.M./S.S. Bushes for all types of motors (per set of 4Nos.) including cost of sleeves |
| 168 | Providing & Replacement of thrust bearing for all types of motor. It includes cost of all components connected with thrust bearing. |
| 169 | Replacement of thrust plate for all types of motors |
| 170 | Motor opening cable jointing & refitting charges when rewinding is not required each motor |
| 171 | Proving & fixing of motor pump coupling housing set |
| 172 | Repairing of submersible single phase pump sets |
| 173 | Providing & Fixing of GM/SS bush per piece |
| 174 | Providing & replacement ofPVC Impeller |
| 175 | Providing & fixingGM Diffuser per piece |
| 176 | Providing & fixing Microlone Guide per piece |
| 177 | Providing & fixing of Bowl per piece |
| 178 | Pump opening & fixing including machining & all finishing work for desired performance |
| 179 | Providing & fixingNRV |
| 180 | Providing & fixingD.O. |
| 181 | Providing & fixing of S.S. shaftup to 2 HP |
| 182 | Above 2HP to 4 HP |
| 183 | Labour charges for removing electric fault in wiring / making connection through lugs (with the help of cramping tool) of motor pump set with starter atheadworks of water supply scheme/Tubewell/ openwell including cost of insulation tape etc.. |
| 184 | Labour charges for replacement of defective ampere meter / volt meter with new one on existing panel board in pump house./Tubewell /openwell (new voltmeter/ampere meter will be provided by department |
| 185 | Labour charges for repairing of starter at site including opening and reassembling of starter with labour charges for replacing of defective parts with new one at site.(Parts will be supplied by Depatment) |
| 186 | 5 to 15 HP. |
| 187 | 16 to 30 HP. |
| 188 | 31 to 60 HP. |
| 189 | 61 to 100 HP. |
| 190 | 101 to 150 HP. |
| 191 | Labour charges for repairing ofsoft starter at site including opening and reassembling of starter with labour charges for replacing of defective parts with new one at site.(Parts will be supplied by Depatment) |
| 192 | 5 to 15 HP. |
| 193 | 16 to 30 HP. |
| 194 | 31 to 60 HP. |
| 195 | 61 to 100 HP. |
| 196 | 101 to 150 HP. |
| 197 | Supply & filling starter oil in oil immersed starters at site. |