}

Tender For Repairing Of Link Road Sarra Kakardahi Deeh Road To Bechuaa Gram Dhouliya. (Premixing And Seal Coat Work By Mixal) - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin D, mandi-Uttar Pradesh

Tender Notice

52092581
Tender For Repairing Of Link Road Sarra Kakardahi Deeh Road To Bechuaa Gram Dhouliya. (Premixing And Seal Coat Work By Mixal) - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin D
Tender
Indian
Uttar Pradesh
Mandi
17-11-2025

Tender Details

Tender For Repairing Of Link Road Sarra Kakardahi Deeh Road To Bechuaa Gram Dhouliya. (Premixing And Seal Coat Work By Mixal) - Earthwork in cutting or in embarkment in ordinary soil, excavationto be in theform ofregularpitsnot exceedingI/2 metre(20gin depthand earthwork in embankmentto be in 20 cm (8) layers, including ramming & dressingthe surfaceto requiredlevelsand slopes and also including 1.5 metre (5ffs) liíts and 30m. (100) lead.The earthfrom cuttingto be used in making embankmentor to be depositedas directedby Engineer-in-charge. 2 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 3 Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. 4 Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Mixal, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. 5 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Mixal. 6 S/F of Signboard as per direction of engineer in charge. 7 (Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% 8 (Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1.50% 9 (Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 3.00% 10 (Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 4.50% 11 (Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 6.00% 12 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 13 Supply and laying of 125 Micron polythene sheet including supply of all materials labour and T&P etc.complete required for proper completion of the work 14 Supply and laying of 06mm thick plain A.C.Sheet in joints of C.C. roadincluding supply of all materials labour and T&P etc.complete required for proper completion of the work (10x6cm) 15 Cement concrete with 20/10mm Gauge approved stone grit coarse sand 2.5 fm and Cement proporation of M20 1:1.5:3 including supply of all materials. labour and T&P etc. required for proper completion of the work. (SOR Basti) 16 (C.C. Work Item No. 12 T0 15) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% 17 (C.C. Item No. 12 T0 15) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% 18 (C.C. Work Item No. 12 T0 15) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% 19 (C.C. Work Item No. 12 T0 15)The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% 20 (C.C. Work Item No. 12 T0 15) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% 21 Excavation in foundation in ordenary soil (Lome clay or sand )including lift upto 1.5m(5feets) and lead upto 30M (100feets)including filling,watering And rammingof excavated earth into the trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharge upto a distance of 30 m (100fts) from the foundation. 22 P/L of Cement concrete in1:4:8[1cement: 4 Corsesand: 8 graded Stone Ballast 40 mm ] Nominal Size.including Supply of Materials & labour and T&P .etc required for proper completion of work.S I No 281. 23 Class M-150Brick work in 1:4 in Cement and Coarse sandIn Foundation and Plinth Including all Supply of all materials, labour and t&p. Si No.305(b) 24 12 MM thick Plaster 1:3 Cement Concrete and Course Sand with all complete work. including supply of all materials labour and T&P etc.req.for proper completion of the work. 25 P/L CC 1:2:4 Plain Cement Concrete & Coarse Sand including supply of all materials labour and T&P etc.req.for proper completion of the work. 26 S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 600mm Dia Pipe

Key Value

Document Fees
INR 6018 /-
EMD
INR 336000.0 /-
Tender Value
INR 32.33 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail