|
| 1 | Providing Architectural-Cum-Structural Consultancy Services Including Geo-Technical, Soil Investigation, Contour Survey, Deployment of Engineer - For [Project: A] - Establishment of 1 LLPD Dairy Plant at Jorhat, Assam |
| 2 | Providing Architectural-Cum-Structural Consultancy Services Including Geo-Technical, Soil Investigation, Contour Survey, Deployment of Engineer - [Project: B] - Establishment of 1 LLPD Dairy Plant at Dibrugarh, Assam |
| 3 | Providing Architectural-Cum-Structural Consultancy Services Including Geo-Technical, Soil Investigation, Contour Survey, Deployment of Engineer - [Project: C] - Establishment of 50 TLPD Dairy Plant at Dhemaji, Assam Project Wise Price Break-up (Form FIN-2) for [Project A]: Architectural & Structural Consultancy fee for Establishment of 1 LLPD Dairy Plant at Sangmai Gaon, Koliapani, Jorhat, Assam Sr No. Brief Description of the services Qty Unit Rate Total Amount excl. GST (Rs) GST(%) Amount incl. GST (Rs) |
| 4 | Fee for Architectural – cum -Structural design consultancy services as per the scope of works mentioned in the Terms of Reference (ToR). Estimated value of Civil & Structural Works for which services of Consultant are required is Rs. 21.18 Crore |
| 5 | Traveling expenses (TA, DA, Lodging, incidental, accommodation) for project site visit of Partners, Associates and Senior Consultants. |
| 6 | - do- as per sr. no. 2 but for project site visit of other staff of the Consultant |
| 7 | Traveling expenses (TA, DA, Lodging, incidental, and accommodation) for NDDB HO, Anand visit of Partners, Associates and Senior Consultants. |
| 8 | - do- as per sr no. 4 but for NDDB HO, Anand visit of other staff of the Consultant |
| 9 | Traveling expenses (TA, DA, Lodging, incidental, and accommodation) for NDDB Regional office Kolkata visit of Partners, Associates and Senior Consultants. |
| 10 | _ do_ as per sr no. 6 but for NDDB Regional office Kolkata visit of other staff of the Consultant |
| 11 | Carryout geo-technical soil investigation.To carry out within site premises borehole of 150mm diameter or other size in soft soil (silt/clay) and for hard gravelly, sandy soils and soft disintegrated rock (SDR)/refusal strata using NX rotary core diamond bits drilling which shall be drilled up to minimum 10.00 metres below NGL (Normal/existing ground level) or more depth as appropriate as per the recommendations of structural consultant or refusal as applicable by taking disturbed soil/rock samples, taking undisturbed soil/rock samples, penetration tests at the intervals of 1.5m or as required in each bore and at the end/terminated depth level of each bore, taking minimum one water sample from borehole if encountered, ground water table in the borehole if observed, refilling the borehole etc complete as directed including all laboratory tests and field test with basic data useful for foundation design and settlement as per the latest IS codes, providing borehole log chart defining limits and depths of various soil strata and their classifications and descriptions, submitting the detailed/graphical report describing general information, local geology, narrative report, all computations leading to the logical conclusion of bearing capacity of soil, safe capacity of piles if any, ground water test reports, recommendation and evaluation about safe bearing capacity, type of foundation, protecting underground concrete from salts or any other impurities/chemicals contained in soil & water, evaluation, assessment and recommendations as applicable, in respect of site preparation, excavation, filling, construction, foundation designs. This specification outlines the general requirements for site subsoil investigations. The work shall be executed in a professional manner through a specialist expert agency practicing in the field of Geo-technical Investigations as per Terms of Reference (ToR).Note: One bore hole shall be executed in one job. |
| 12 | Carry out Contour Traverse and detail survey as per the general terms and conditions, and technical specifications, scope, providing drawings, photographs, Pendrive & reports etc complete as directed. Works to be executed as per Terms of Reference (ToR). |
| 13 | Deployment & providing service of BE/B.Tech graduate civil engineer at site with minimum 5 years’ experience in industrial buildings for Monitoring, supervision and execution of civil works, scrutiny of construction drawings for all the buildings and issue to civil contractor, Day-to-day supervision, monitoring and co-ordination with contractor, client and Architect and structural consultant for execution of Civil works of all buildings, Coordination with mechanical/ electrical vendors for equipment erection activities and necessary clearance for their works, Preparation and checking and certification of bills of Civil contractors in AX and Processing of contractors bills, Preparation and maintain of site records like cement and steel register, other construction materials etc. Ensure implementation of quality guidelines, QAP and other quality parameters as per order terms following relevant IS codes (Material testing-site testing & TPT, Visual Inspection reports, Field tests, Check lists, Reconciliation statements, checking of all documentation on quality and test reports and QA/QC documents of civil works as per NDDB specification etc., Submission of DPR, Weekly and monthly progress reports to HO NDDB Coordinate effectively with other team members to ensure deliverables in cross functional stream of the project in time as directed by engineer in charge. If site engineer (Civil Engineer) is on leave/out of station then his reliever to be deputed at site and would be responsible to look after the above activities during his absence at site.The quoted rate includes all expenses of Boarding, Loading, TA/DA CTC etc. of the said engineer. Note : a) CV of Site engineer (Civil Engineer) should be submitted to NDDB along with technical bid for evaluation. Different Site Engineer is to be quoted for all three projects.b) Total period for deployment is 18 Months from the date of start of civil works at project site or as directed by engineer in charge).c) Laptops loaded with all relevant softwares with Wi-Fi/internet connection to be given to each engineer posted at site. |
| 14 | PROVIDING ARCHITECTURALMODEL As per the specification mentioned in Terms of Reference (ToR). TOTAL 0.0 • IF BIDDER HAS NOT ENTERED VALUE OR ENTERED \"0\" (ZERO) VALUE IN COLUMN \"G\" (i.e. APPLICABLE % GST), THEN VALUE OF COLUMN \"E\" (i.e UNIT RATE) WILL BE CONSIDERED AS INCLUSIVE OF APPLICABLE GST/TAXES AND BID SHALL BE EVALUATED ACCORDINGLY. IN SUCH CASE, THE BIDDER SHALL FURNISH/ UPLOAD THE DETAILS OF SUCH INCLUSIONS SEPARATELY• THE PURCHASER WILL ALSO EXAMINE WHETHER THE BID IS COMPLETE. IF THE PRICES OF CERTAIN ITEM IS FOUND AS “0” “ZERO” IT WILL BE PRESUMED THE BIDDERS HAS INCLUDED THE COST OF THIS ITEM AGAINST SOME OTHER ITEMS OF THIS PRICE BID SHEET. THE BIDDER SHALL FURNISH/ UPLOAD THE DETAILS OF SUCH INCLUSIONS SEPARATELY• BIDDER SHALL BE RESPONSIBLE FOR SELECTION OF APPLICABLE GST THEREON FOR THE ITEMS QUOTED BY THEM. Project Wise Price Break-up (Form FIN-2) for [Project B]: Architectural & Structural Consultancy fee for Establishment of 1 LLPD Dairy Plant at Lahowal in Dibrugarh, Assam Sr No. Brief Description of the services Qty Unit Rate Total Amount excl. GST (Rs) GST(%) Amount incl. GST (Rs) |
| 15 | Fee for Architectural – cum -Structural design consultancy services as per the scope of works mentioned in the Terms of Reference.Estimated value of Civil & Structural Works for which services of Consultant are required is Rs. 31.26 Crore |
| 16 | Traveling expenses (TA, DA, Lodging, incidental, accommodation) for project site visit of Partners, Associates and Senior Consultants. |
| 17 | - do- as per sr. no. 2 but for project site visit of other staff of the Consultant |
| 18 | Traveling expenses (TA, DA, Lodging, incidental, and accommodation) for NDDB HO, Anand visit of Partners, Associates and Senior Consultants. |
| 19 | - do- as per sr no. 4 but for NDDB HO, Anand visit of other staff of the Consultant |
| 20 | Traveling expenses (TA, DA, Lodging, incidental, and accommodation) for NDDB Regional office Kolkata visit of Partners, Associates and Senior Consultants. |
| 21 | _ do_ as per sr no. 6 but for NDDB Regional office Kolkata visit of other staff of the Consultant |
| 22 | Carryout geo-technical soil investigation.To carry out within site premises borehole of 150mm diameter or other size in soft soil (silt/clay) and for hard gravelly, sandy soils and soft disintegrated rock (SDR)/refusal strata using NX rotary core diamond bits drilling which shall be drilled up to minimum 10.00 metres below NGL (Normal/existing ground level) or more depth as appropriate as per the recommendations of structural consultant or refusal as applicable by taking disturbed soil/rock samples, taking undisturbed soil/rock samples, penetration tests at the intervals of 1.5m or as required in each bore and at the end/terminated depth level of each bore, taking minimum one water sample from borehole if encountered, ground water table in the borehole if observed, refilling the borehole etc complete as directed including all laboratory tests and field test with basic data useful for foundation design and settlement as per the latest IS codes, providing borehole log chart defining limits and depths of various soil strata and their classifications and descriptions, submitting the detailed/graphical report describing general information, local geology, narrative report, all computations leading to the logical conclusion of bearing capacity of soil, safe capacity of piles if any, ground water test reports, recommendation and evaluation about safe bearing capacity, type of foundation, protecting underground concrete from salts or any other impurities/chemicals contained in soil & water, evaluation, assessment and recommendations as applicable, in respect of site preparation, excavation, filling, construction, foundation designs. This specification outlines the general requirements for site subsoil investigations. The work shall be executed in a professional manner through a specialist expert agency practicing in the field of Geo-technical Investigations as per Terms of Reference (ToR).Note: One bore hole shall be executed in one job. |
| 23 | Carry out Contour Traverse and detail survey as per the general terms and conditions, and technical specifications, scope, providing drawings, photographs, Pendrive & reports etc complete as directed. Works to be executed as per Terms of Reference (ToR). |
| 24 | Deployment & providing service of BE/B.Tech graduate civil engineer at site with minimum 5 years’ experience in industrial buildings for Monitoring, supervision and execution of civil works, scrutiny of construction drawings for all the buildings and issue to civil contractor, Day-to-day supervision, monitoring and co-ordination with contractor, client and Architect and structural consultant for execution of Civil works of all buildings, Coordination with mechanical/ electrical vendors for equipment erection activities and necessary clearance for their works, Preparation and checking and certification of bills of Civil contractors in AX and Processing of contractors bills, Preparation and maintain of site records like cement and steel register, other construction materials etc. Ensure implementation of quality guidelines, QAP and other quality parameters as per order terms following relevant IS codes (Material testing-site testing & TPT, Visual Inspection reports, Field tests, Check lists, Reconciliation statements, checking of all documentation on quality and test reports and QA/QC documents of civil works as per NDDB specification etc., Submission of DPR, Weekly and monthly progress reports to HO NDDB Coordinate effectively with other team members to ensure deliverables in cross functional stream of the project in time as directed by engineer in charge. If site engineer (Civil Engineer) is on leave/out of station then his reliever to be deputed at site and would be responsible to look after the above activities during his absence at site.The quoted rate includes all expenses of Boarding, Loading, TA/DA CTC etc. of the said engineer. Note : a) CV of Site engineer (Civil Engineer) should be submitted to NDDB along with technical bid for evaluation. Different Site Engineer is to be quoted for all three projects.b) Total period for deployment is 18 Months from the date of start of civil works at project site or as directed by engineer in charge).c) Laptops loaded with all relevant softwares with Wi-Fi/internet connection to be given to each engineer posted at site |
| 25 | PROVIDING ARCHITECTURALMODEL As per the specification mentioned in Terms of Reference (ToR). TOTAL 0.0 • IF BIDDER HAS NOT ENTERED VALUE OR ENTERED \"0\" (ZERO) VALUE IN COLUMN \"G\" (i.e. APPLICABLE % GST), THEN VALUE OF COLUMN \"E\" (i.e UNIT RATE) WILL BE CONSIDERED AS INCLUSIVE OF APPLICABLE GST/TAXES AND BID SHALL BE EVALUATED ACCORDINGLY. IN SUCH CASE, THE BIDDER SHALL FURNISH/ UPLOAD THE DETAILS OF SUCH INCLUSIONS SEPARATELY• THE PURCHASER WILL ALSO EXAMINE WHETHER THE BID IS COMPLETE. IF THE PRICES OF CERTAIN ITEM IS FOUND AS “0” “ZERO” IT WILL BE PRESUMED THE BIDDERS HAS INCLUDED THE COST OF THIS ITEM AGAINST SOME OTHER ITEMS OF THIS PRICE BID SHEET. THE BIDDER SHALL FURNISH/ UPLOAD THE DETAILS OF SUCH INCLUSIONS SEPARATELY• BIDDER SHALL BE RESPONSIBLE FOR SELECTION OF APPLICABLE GST THEREON FOR THE ITEMS QUOTED BY THEM. Project Wise Price Break-up (Form FIN-2) for [Project C]: Architectural & Structural Consultancy fee for Establishment of 50 TLPD Dairy Plant at Karmipathar Revenue Village under Dhemaji Revenue Circle, Assam Sr No. Brief Description of the services Qty Unit Rate Total Amount excl. GST (Rs) GST(%) Amount incl. GST (Rs) |
| 26 | Fee for Architectural – cum -Structural design consultancy services as per the scope of works mentioned in the Terms of Reference.Estimated value of Civil & Structural Works for which services of Consultant are required is Rs. 27.48 Crore |
| 27 | Traveling expenses (TA, DA, Lodging, incidental, accommodation) for project site visit of Partners, Associates and Senior Consultants. |
| 28 | - do- as per sr. no. 2 but for project site visit of other staff of the Consultant |
| 29 | Traveling expenses (TA, DA, Lodging, incidental, and accommodation) for NDDB HO, Anand visit of Partners, Associates and Senior Consultants. |
| 30 | - do- as per sr no. 4 but for NDDB HO, Anand visit of other staff of the Consultant |
| 31 | Traveling expenses (TA, DA, Lodging, incidental, and accommodation) for NDDB Regional office Kolkata visit of Partners, Associates and Senior Consultants. |
| 32 | _ do_ as per sr no. 6 but for NDDB Regional office Kolkata visit of other staff of the Consultant |
| 33 | Carryout geo-technical soil investigation.To carry out within site premises borehole of 150mm diameter or other size in soft soil (silt/clay) and for hard gravelly, sandy soils and soft disintegrated rock (SDR)/refusal strata using NX rotary core diamond bits drilling which shall be drilled up to minimum 10.00 metres below NGL (Normal/existing ground level) or more depth as appropriate as per the recommendations of structural consultant or refusal as applicable by taking disturbed soil/rock samples, taking undisturbed soil/rock samples, penetration tests at the intervals of 1.5m or as required in each bore and at the end/terminated depth level of each bore, taking minimum one water sample from borehole if encountered, ground water table in the borehole if observed, refilling the borehole etc complete as directed including all laboratory tests and field test with basic data useful for foundation design and settlement as per the latest IS codes, providing borehole log chart defining limits and depths of various soil strata and their classifications and descriptions, submitting the detailed/graphical report describing general information, local geology, narrative report, all computations leading to the logical conclusion of bearing capacity of soil, safe capacity of piles if any, ground water test reports, recommendation and evaluation about safe bearing capacity, type of foundation, protecting underground concrete from salts or any other impurities/chemicals contained in soil & water, evaluation, assessment and recommendations as applicable, in respect of site preparation, excavation, filling, construction, foundation designs. This specification outlines the general requirements for site subsoil investigations. The work shall be executed in a professional manner through a specialist expert agency practicing in the field of Geo-technical Investigations as per Terms of Reference (ToR).Note: One bore hole shall be executed in one job. |
| 34 | Carry out Contour Traverse and detail survey as per the general terms and conditions, and technical specifications, scope, providing drawings, photographs, Pendrive & reports etc complete as directed. Works to be executed as per Terms of Reference (ToR). |
| 35 | Deployment & providing service of BE/B.Tech graduate civil engineer at site with minimum 5 years’ experience in industrial buildings for Monitoring, supervision and execution of civil works, scrutiny of construction drawings for all the buildings and issue to civil contractor, Day-to-day supervision, monitoring and co-ordination with contractor, client and Architect and structural consultant for execution of Civil works of all buildings, Coordination with mechanical/ electrical vendors for equipment erection activities and necessary clearance for their works, Preparation and checking and certification of bills of Civil contractors in AX and Processing of contractors bills, Preparation and maintain of site records like cement and steel register, other construction materials etc. Ensure implementation of quality guidelines, QAP and other quality parameters as per order terms following relevant IS codes (Material testing-site testing & TPT, Visual Inspection reports, Field tests, Check lists, Reconciliation statements, checking of all documentation on quality and test reports and QA/QC documents of civil works as per NDDB specification etc., Submission of DPR, Weekly and monthly progress reports to HO NDDB Coordinate effectively with other team members to ensure deliverables in cross functional stream of the project in time as directed by engineer in charge. If site engineer (Civil Engineer) is on leave/out of station then his reliever to be deputed at site and would be responsible to look after the above activities during his absence at site.The quoted rate includes all expenses of Boarding, Loading, TA/DA CTC etc. of the said engineer. Different Site Engineer is to be quoted for all three projects. Note : a) CV of Site engineer (Civil Engineer) should be submitted to NDDB along with technical bid for evaluation.b) Total period for deployment is 18 Months from the date of start of civil works at project site or as directed by engineer in charge).c) Laptops loaded with all relevant softwares with Wi-Fi/internet connection to be given to each engineer posted at site |
| 36 | PROVIDING ARCHITECTURALMODEL As per Terms of Reference (ToR). TOTAL 0.0 • IF BIDDER HAS NOT ENTERED VALUE OR ENTERED \"0\" (ZERO) VALUE IN COLUMN \"G\" (i.e. APPLICABLE % GST), THEN VALUE OF COLUMN \"E\" (i.e UNIT RATE) WILL BE CONSIDERED AS INCLUSIVE OF APPLICABLE GST/TAXES AND BID SHALL BE EVALUATED ACCORDINGLY. IN SUCH CASE, THE BIDDER SHALL FURNISH/ UPLOAD THE DETAILS OF SUCH INCLUSIONS SEPARATELY• THE PURCHASER WILL ALSO EXAMINE WHETHER THE BID IS COMPLETE. IF THE PRICES OF CERTAIN ITEM IS FOUND AS “0” “ZERO” IT WILL BE PRESUMED THE BIDDERS HAS INCLUDED THE COST OF THIS ITEM AGAINST SOME OTHER ITEMS OF THIS PRICE BID SHEET. THE BIDDER SHALL FURNISH/ UPLOAD THE DETAILS OF SUCH INCLUSIONS SEPARATELY• BIDDER SHALL BE RESPONSIBLE FOR SELECTION OF APPLICABLE GST THEREON FOR THE ITEMS QUOTED BY THEM. Please Enable Macros to View BoQ information |